This has been an interesting thread the last few days!

My take on the green line is that by combining the north and south legs, the city has forced a situation whereby the city has to bite the bullet on a major decision on transit funding. This is because:
1) All agree that the functionality of the lines lie in extending them fully into the suburbs from day one (thus avoiding the core stub system that Edmonton endured for 20 years).
2) Common wisdom is the downtown portion on 2nd street should be buried.
3) Sending the north line from an underground terminus at eu Clair, across the river on the centre street bridge, and then up a steep embankment along increasingly congested rights of way seems to make the tunnel option to 16th (though much more expensive) an appealing move.
4) The low floor streetcar type line seems to be a losing argument- on this thread at least.

To me, it seems like crunch time on a Calgary decision to fund a "big dig" in transit, vs building a system to meet current need in small chunks, with frequent need to upgrade.

Last edited by PPAR; Mar 15, 2014 at 3:04 PM.
     
     
  #7962  
Old Posted Mar 15, 2014, 3:10 PM
Fuzz's Avatar
Fuzz Fuzz is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,421
^

For item number 3, why is it not an option to come above ground at Eau Claire(2nd st or 1st st), skirt the east end of Prince's Island, then either into the bluff (preferred) or get on Centre street that way? The West leg built a large elevated portion very quickly, why are we afraid of another bridge? Seams much cheaper and less complicated than tunnelling under the river.

Also, Eau Claire is a long way from Centre street, how do you get the train from there over to the bridge given turning radius limitations, bring it up to grade AND not destroy China town? You think they were upset about a bike lane?
     
     
  #7963  
Old Posted Mar 15, 2014, 3:55 PM
mellbell416 mellbell416 is offline
Registered User
 
Join Date: Aug 2012
Posts: 165
Are we seriously going to wait until 2017 to begin construction on the Green line or the other BRTs with completion by 2021 (SEVEN years)? Surely there is construction could start this year even if all the details haven't been worked out?
     
     
  #7964  
Old Posted Mar 15, 2014, 4:43 PM
RicoLance21's Avatar
RicoLance21 RicoLance21 is offline
Bring buildings to life
 
Join Date: Mar 2005
Location: Windsor Park, Calgary
Posts: 2,463
Quote:
Originally Posted by Fuzz View Post
^

For item number 3, why is it not an option to come above ground at Eau Claire(2nd st or 1st st), skirt the east end of Prince's Island, then either into the bluff (preferred) or get on Centre street that way? The West leg built a large elevated portion very quickly, why are we afraid of another bridge? Seams much cheaper and less complicated than tunnelling under the river.

Also, Eau Claire is a long way from Centre street, how do you get the train from there over to the bridge given turning radius limitations, bring it up to grade AND not destroy China town? You think they were upset about a bike lane?
This is exactly what I envision for the longest time. I think it is, in my opinion, the cheapest, yet still relatively intrusive-free option. It makes me wonder why transit planners did not consider this option; they present only two options to cross the Bow River--on Centre Street Bridge or under the river. Now, if flood is the fear factor for the new bridge option, it is not much different than tunneling under the river. What is preventing Eau Claire station entrances from water seeping in?
__________________
Calgary: more than just a redneck city...much more. Just ask the mayor.
     
     
  #7965  
Old Posted Mar 15, 2014, 5:37 PM
Fuzz's Avatar
Fuzz Fuzz is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,421
The only reason I found in the report is that Prince's island is a sensitive ecosystem. I hardly thing a bridge pillar is going to cause to much of an issue though. There are always environmental impacts, in this case I think it is well worth it.
     
     
  #7966  
Old Posted Mar 15, 2014, 5:39 PM
Ferreth Ferreth is offline
IMHO
 
Join Date: Apr 2009
Location: Calgary
Posts: 882
Quote:
Originally Posted by RicoLance21 View Post
This is exactly what I envision for the longest time. I think it is, in my opinion, the cheapest, yet still relatively intrusive-free option. It makes me wonder why transit planners did not consider this option; they present only two options to cross the Bow River--on Centre Street Bridge or under the river. Now, if flood is the fear factor for the new bridge option, it is not much different than tunneling under the river. What is preventing Eau Claire station entrances from water seeping in?
There would be an immediate uproar about putting a bridge through one of our most heavily used parks in Calgary, even if it only cut through a little eastern tip of it. *IF* it could be shown to save significant tunneling costs, I'd be willing to sacrifice a bit of east park solitude. But I wonder too if it was not considered due to potential backlash.
__________________
---
My Flickr account
My Ratsofrass blog
     
     
  #7967  
Old Posted Mar 15, 2014, 7:24 PM
PPAR's Avatar
PPAR PPAR is offline
Registered User
 
Join Date: Jul 2006
Posts: 604
To my mind city core park space must be non-negotiable. Do you think Central Park in New York would have any hope of existing if it's parameters were negotiable:

"Hey mayor, I'll give you 1 billion dollars if you allow me to develop just this small corner..."
     
     
  #7968  
Old Posted Mar 15, 2014, 7:53 PM
Bassic Lab Bassic Lab is offline
Registered User
 
Join Date: Oct 2005
Location: Calgary
Posts: 1,934
Arrow

Quote:
Originally Posted by RicoLance21 View Post
This is exactly what I envision for the longest time. I think it is, in my opinion, the cheapest, yet still relatively intrusive-free option. It makes me wonder why transit planners did not consider this option; they present only two options to cross the Bow River--on Centre Street Bridge or under the river. Now, if flood is the fear factor for the new bridge option, it is not much different than tunneling under the river. What is preventing Eau Claire station entrances from water seeping in?
Creating a tunnel portal in the middle of an unstable embankment would have it's own challenges. Supporting the hill would be a nightmare. Boring a tunnel under the river shouldn't be much harder than doing it on either side; the ground water situation would be the same. It makes sense to restrict the choices to over the hill or under the unstable soil.

As for flooding, it is much easier to raise a station entrance above the flood level than it is to raise a tunnel portal. Rain and ground water intrusion can be taken care of by sump pumps. Floodwater pouring into a tunnel portal can't be stopped and would quickly fill the tunnel and everything attached to it.
     
     
  #7969  
Old Posted Mar 16, 2014, 4:10 PM
Ferreth Ferreth is offline
IMHO
 
Join Date: Apr 2009
Location: Calgary
Posts: 882
I'd be thinking in terms of bringing LRT out of the ground starting at 3rd Ave, level crossing at 2nd, and elevated beyond that. You wouldn't be digging into the hill, as you'd have 830 meters to rise the 40 meters to be level with the embankment at Crescent road and Center A st.

Downsides I see are that you'd have bridge with a couple of piers going through Prince's Island park, and expropriation of any property on top of the hill is going to be mighty expensive. Also, there would be some noise impact on residential both south and north of the river. As previously mentioned, having a portal between 3rd and 2nd Ave is a flood risk. Could the portal be raised to mitigate the risk?

There are variations on this theme too - you could cut and cover once you are on top of the hill, possibly being able to keep the station for Eau Claire at grade, then not being as huge an impact on top of the hill, although you would still have to expropriate some expensive properties.

I suspect a bridge would be cheaper than tunneling under the river, through Crescent Heights to at least 8th Ave with a portal there. Cheap enough to be worth considering - who knows as currently the option is not being looked at.
__________________
---
My Flickr account
My Ratsofrass blog
     
     
  #7970  
Old Posted Mar 16, 2014, 5:25 PM
WaitWhat?'s Avatar
WaitWhat? WaitWhat? is offline
Registered User
 
Join Date: Oct 2013
Posts: 127
Quote:
Originally Posted by fusili View Post
I am starting to be more and more convinced that an at-grade alignment on Centre street could work. This study (http://www.steerdaviesgleave.com/casestu...tions-along-vancouvers-broadway-corridor) by Steer Davies Gleave for the Broadway corridor in Vancouver illustrates how you can handle intersections and pedestrian crossings along a constrained corridor.

I remember seeing a larger report with several intersection diagrams, but can't seem to find it now. Too bad.

Would it be more efficient to have the train running down the median as you illustrate or along the side a la WLRT along 17th ave? I suppose it would depend on levels of traffic turning east or west?
__________________
Wait...what?
     
     
  #7971  
Old Posted Mar 17, 2014, 12:07 PM
technomad technomad is offline
BANNED
 
Join Date: Apr 2011
Location: Alberia
Posts: 858
Quote:
Originally Posted by Cage View Post
8 Ave Subway requires boring for the entire length due to the proposed position of the tunnel.

2nd Street tunnel can be completed using cut and cover for most of the tunnel, which reduces the cost.
Why is that?

I would have thought the opposite, Steven Ave would be easier as C&C, with green line bored to go under 8 Ave subway and the river.
     
     
  #7972  
Old Posted Mar 17, 2014, 12:49 PM
technomad technomad is offline
BANNED
 
Join Date: Apr 2011
Location: Alberia
Posts: 858
Quote:
Originally Posted by O-tacular View Post
I'm just curious how this will play out with the water diversion tunnel going east on 50th from the Elbow to the Bow? It needs to be tunneled, not cut and cover iirc. I also seem to remember Nenshi musing about other uses they could find for such an expensive tunnel boring machine. I'm just saying, couldn't the case be made to the province to roll all of these tunneling projects together to maybe get a price break?
Having a good sized TBM for flood relief would really open up a lot of options...

Boring green line under downtown is a no-brainer IMO, and running it under the river is the best flood mitigation for it as well, and if we already have the machine... presumably the economics of running underground up to at least 64 ave change for the better too.

Beyond flood relief and green line, the TBM could be used to provide an unobtrusive final ROW for HSR, starting in nose creek, under the river and Inglewood, into an underground station DT.

Depending on how big it was, a vehicle tunnel under 16 av n could even be feasible, finishing up the inner freeway ring
     
     
  #7973  
Old Posted Mar 17, 2014, 1:50 PM
CorporateWhore's Avatar
CorporateWhore CorporateWhore is offline
Registered User
 
Join Date: Jul 2001
Location: Purgatory
Posts: 4,685
Quote:
Originally Posted by PPAR View Post
To my mind city core park space must be non-negotiable. Do you think Central Park in New York would have any hope of existing if it's parameters were negotiable:

"Hey mayor, I'll give you 1 billion dollars if you allow me to develop just this small corner..."
Just an FYI that Central Park has several roads and subway lines cutting through it.
     
     
  #7974  
Old Posted Mar 17, 2014, 3:08 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by CorporateWhore View Post
Just an FYI that Central Park has several roads and subway lines cutting through it.
And restaurants, museums, amusement parks....
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
     
     
  #7975  
Old Posted Mar 17, 2014, 3:12 PM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,596
TBMs are not the cost constraint in constructing tunnels .
     
     
  #7976  
Old Posted Mar 17, 2014, 5:26 PM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
Quote:
Originally Posted by technomad View Post
Having a good sized TBM for flood relief would really open up a lot of options...

Boring green line under downtown is a no-brainer IMO, and running it under the river is the best flood mitigation for it as well, and if we already have the machine... presumably the economics of running underground up to at least 64 ave change for the better too.

Beyond flood relief and green line, the TBM could be used to provide an unobtrusive final ROW for HSR, starting in nose creek, under the river and Inglewood, into an underground station DT.

Depending on how big it was, a vehicle tunnel under 16 av n could even be feasible, finishing up the inner freeway ring
I've seen this posted a few times and I don't think it's a realistic option. TBMs are built to order for specific projects and are often one time beasts. Many, such as those used in the Channel Tunnel, are simply driven to the side and abandoned forever. I've tried to find some information on what usually happens to the TBMs after and can't find much, but I believe once they're finished they are pretty beat up regardless and will need to be dismantled and reconstructed.

There is also the issue that a TBM to build a flood relief tunnel in the South will have a different spec to one building a rail line or a roadway in different areas - different geology and tunnel size mainly. Rail lines almost always take two smaller ones.
     
     
  #7977  
Old Posted Mar 17, 2014, 7:02 PM
MMMBeer MMMBeer is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 128
Anything involving significant tunneling is going to cost big $$$.

Check out this project from Seattle. Only 5km of track and two stations, and projected budget is US$2 billion, due to significant tunneling with TBMs:

http://www.soundtransit.org/Projects-and-Plans/University-Link-Extension

And this one from San Francisco, only 3.5km of tunnel, four stations, TBM also needed, US$1.6 billion budget:

http://www.centralsubwaysf.com/content/project-overview
     
     
  #7978  
Old Posted Mar 17, 2014, 8:34 PM
joe498 joe498 is offline
Registered User
 
Join Date: Aug 2013
Posts: 295
Good article and I have to agree:

$5-billion cost for last leg of Calgary ring road ‘horrendous’

http://www.calgaryherald.com/news/calgar...+ring+road+horrendous/9624198/story.html
     
     
  #7979  
Old Posted Mar 18, 2014, 1:01 AM
PPAR's Avatar
PPAR PPAR is offline
Registered User
 
Join Date: Jul 2006
Posts: 604
Quote:
Originally Posted by CorporateWhore View Post
Just an FYI that Central Park has several roads and subway lines cutting through it.
Yes, but the subways are underground and the roads are park boulevards. All amenities in Central Park are associated with the primary function. Even the pass through roads have limitations to make them undesirable for commuting.
     
     
  #7980  
Old Posted Mar 18, 2014, 1:15 AM
Fuzz's Avatar
Fuzz Fuzz is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,421
Just to throw another angle at this... I just spent 1 hour on the 301 "express" bus; about 35 minutes of it on 5th ave to travel 5 blocks. No sign of an accident, just heavy traffic and loads of buses. Given a 20 year time frame, does 5th ave have the capacity for all the buses that are going to be on it? It already seams to be beyond capacity, with bendy buses blocking north/south traffic at intersections. If there is some sort of busway up centre, this is only going to get worse.

I've been playing that mini metro game, and I keep getting thoughts of the game ending when I hit around 650 passengers and finally they all get fed up! Calgary's future?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:20 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.