BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #5741  
Old Posted Feb 23, 2014, 11:58 PM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,075
I really hope it is some real logistical reason why they are deciding on the name change because from a taxpayer's perspective it makes no sense to blow that much money.
     
     
  #5742  
Old Posted Feb 24, 2014, 3:16 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by jsbertram View Post
According to the Evergreen docs, when the extension is finished the entire line from VCC-Clark through Lougheed to Lafarge Lake-Douglas will become "The Millennium Line".

The existing Expo line from Waterfront to King George will not be changed, so those trains will still be Expo line trains "to King George" terminal or "to Waterfront" terminal.

The trains from Waterfront to Lougheed (via New Westminster and Braid) will become Expo line trains "to Lougheed" terminal or "to Waterfront" terminal. Expo trains will not run west of Lougheed in regular passenger service.

Therefore the Expo line and Millennium line will run as separate and independent lines, with only Lougheed and Commercial/Broadway stations being the interchange points for passengers between the two lines.

Lougheed is the interchange point for trains, so access to/from the Edmonds maintenance centre can be made by trains on either the Expo or Millennium lines.

When The "Broadway-UBC" extension is built west of VCC-Clark, it too will be part of the "The Millennium Line" when it opens.
Actually does anyone have a link to the document handy? I was trying to search for it but I guess I'm not inputting the correct keywords.
     
     
  #5743  
Old Posted Feb 24, 2014, 3:37 AM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by Zassk View Post
Agreed, and I think the whole system would be easier for occasional riders to understand if the Canada Line was called two lines - e.g. Airport Line (Waterfront to YVR) and Canada Line (Waterfront to Brighouse).
If someone can't figure out what train they need to take on the Canada Line they probably shouldn't have the legal capacity to manage their own finances or be allowed to have children.

I'd love to see those people take the District Line in London...


or the Northern Line...

Last edited by Jebby; Feb 24, 2014 at 3:49 AM.
     
     
  #5744  
Old Posted Feb 24, 2014, 5:11 AM
Ehlun Ehlun is offline
Registered User
 
Join Date: Jan 2013
Posts: 60
Quote:
Originally Posted by deasine View Post
Actually does anyone have a link to the document handy? I was trying to search for it but I guess I'm not inputting the correct keywords.
There is a document, but it's blacked out. Everything that's out about the final operation pattern/naming is all speculation.
     
     
  #5745  
Old Posted Feb 24, 2014, 11:20 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,524
It does make some sense though - since the "Evergreen" line name was really created for the LRT version, so at the time, it really was a separate line from Millennium Line. Now, it's back to being an extension.
     
     
  #5746  
Old Posted Feb 25, 2014, 1:24 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Is there any speculation on the routing of a Broadway Line? I guess logically you'd continue from VCC-Clark above Great Northern Way until going south on Main Street, but that way you miss a pretty big part of East Broadway, probably 2 stations at Clark and Fraser. Any of you have any ideas on what you'd do?
     
     
  #5747  
Old Posted Feb 25, 2014, 2:48 AM
rsxstock rsxstock is offline
Registered User
 
Join Date: Apr 2013
Posts: 274
Quote:
Originally Posted by GlassCity View Post
Is there any speculation on the routing of a Broadway Line? I guess logically you'd continue from VCC-Clark above Great Northern Way until going south on Main Street, but that way you miss a pretty big part of East Broadway, probably 2 stations at Clark and Fraser. Any of you have any ideas on what you'd do?
there's really not much at clark and fraser to put a station for, the buses can cover that area no problem. logically, they should go south east to kingsgate mall and then west along broadway
     
     
  #5748  
Old Posted Feb 25, 2014, 3:22 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,075
Off the top of my head I can think of three ways but they all have their cons.

IDEA 1

Expand the switch east of Commercial/ Broadway and directly tunnel under the road. The obvious downside however is no direct connection to one of the busiest stations in the system.

IDEA 2

Add a switch and tunnel entrance west of Commercial/Broadway. This eliminates any logistical nightmares regarding trains having to reverse into the platform like with the previous idea. The downside however is what to do with the remaining stub of a line down to VCC/Clark. It sees enough activity you can't just abandon it.

IDEA 3

After the existing switches you have several hundred meters to get the tracks below ground so they can navigate under the road and then make their way to Broadway.
IF that apartment block on the hill was not there you could just run the guideway over the road and put the tunnel entrance there but just buying out and demolishing the place would cost a fortune and you can't travel much more west because you then have to deal with the rail yard and no viable places to even dig under the road.
     
     
  #5749  
Old Posted Feb 25, 2014, 3:31 AM
idunno idunno is offline
Registered User
 
Join Date: Feb 2010
Posts: 938
I think it's fairly well understood that the line will likely be similar to your third idea, MIPS. The designs for the Emily Carr Campus show a specific alignment like that, and even a proposed station box.
     
     
  #5750  
Old Posted Feb 25, 2014, 3:31 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Third one seems to make the most sense because the first two seem to have problems that are just too extreme.
     
     
  #5751  
Old Posted Feb 25, 2014, 3:46 AM
gkz gkz is offline
Registered User
 
Join Date: Jul 2013
Posts: 71

Last edited by gkz; Feb 25, 2014 at 3:57 AM.
     
     
  #5752  
Old Posted Feb 25, 2014, 3:55 AM
dpogue dpogue is online now
Registered User
 
Join Date: Aug 2013
Posts: 766
The plan (or the one that I keep seeing referred to in documents) is for the Millennium line to continue from VCC-Clark along the edge of the rail yards, entering a tunnel around Fraser St, then turning for a station at Thornton St & Great Northern Way before heading up towards Main & Broadway.

With Emily Carr University moving their entire campus to Great Northern Way & Carolina St, it makes sense for a station there.
     
     
  #5753  
Old Posted Feb 25, 2014, 4:40 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,075
Wow, how did I miss that PDF?
Okay, so they have the exact same idea as well for that block of land.
     
     
  #5754  
Old Posted Feb 25, 2014, 5:42 AM
dleung's Avatar
dleung dleung is offline
Registered User
 
Join Date: Nov 2009
Location: Toronto
Posts: 6,535
I posted this in 2009:



     
     
  #5755  
Old Posted Feb 25, 2014, 9:25 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
What will the travel time be from Langfar > UBC? Can't wait to see the 50 minute Waterfront > VCC-clark record broken.
     
     
  #5756  
Old Posted Feb 25, 2014, 9:41 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,075
Quote:
Originally Posted by Mac Write View Post
What will the travel time be from Langfar > UBC? Can't wait to see the 50 minute Waterfront > VCC-clark record broken.
Lafarge -> Lougheed = 15min
Lougheed -> Broadway = 18min
Broadway -> UBC = 19min
Total: 52min

Currently
Waterfront -> Columbia = 30min
Columbia -> VCC = 27min
Total: 57min

The current Millennium Line is still longer. The only possible way to break it is to have Expo Line extend to Langley. That would be exactly 60min end-to-end.
     
     
  #5757  
Old Posted Feb 25, 2014, 10:22 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by Ehlun View Post
There is a document, but it's blacked out. Everything that's out about the final operation pattern/naming is all speculation.
Quote:
Originally Posted by officedweller View Post
It does make some sense though - since the "Evergreen" line name was really created for the LRT version, so at the time, it really was a separate line from Millennium Line. Now, it's back to being an extension.
Am I thinking of a different document. I remember there was a document that proposed different services something like:
  • Option 1: Waterfront-King George, Waterfront-VCC, VCC-Lafarge
  • Option 2: Waterfront-King George, Waterfront-Lougheed, VCC-Lafarge
  • Option 3: Waterfront-King George, Columbia-Lougheed, VCC-Lafarge

Does anyone have the link to said document above available?
     
     
  #5758  
Old Posted Feb 25, 2014, 6:36 PM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,142
Originally the travel time from Commercial to UBC was 20 minutes for RRT. Then, I think the RRT time dropped to 19 minutes This document now says the travel time for RRT, Commercial to UBC is 17 minutes. I'm not sure if they are subtracting stations as they go along, but the travel times change periodically, or maybe there are a few different documents floating around.

     
     
  #5759  
Old Posted Feb 25, 2014, 7:19 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,524
Quote:
Originally Posted by GlassCity View Post
Is there any speculation on the routing of a Broadway Line? I guess logically you'd continue from VCC-Clark above Great Northern Way until going south on Main Street, but that way you miss a pretty big part of East Broadway, probably 2 stations at Clark and Fraser. Any of you have any ideas on what you'd do?
Just as a historical note -
The original allignment for the M-Line was to be under Broadway, probably like MIPS first drawing.

However, at the time the City of Vancouver was keen on developing the Finning Lands (GNW Campus) as high tech space (as well as lands in the Grandview corridor) and the station could still serve the VCC campus from the north (esp. as it expands to the north) - so the allignment was diverted to the north. The QLT Building was the first among many expected.

In addition, there were potential issues with tunnelling under Broadway because of soft soils near the buried China Creek. There would also have been a large open excavation pit blocking Broadway for years while an underground station was constructed.

The development of the Finning Lands didn't quite pan out and the lands were donated to the Universities.
     
     
  #5760  
Old Posted Feb 25, 2014, 7:21 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,524
Quote:
Originally Posted by deasine View Post
Am I thinking of a different document. I remember there was a document that proposed different services something like:
  • Option 1: Waterfront-King George, Waterfront-VCC, VCC-Lafarge
  • Option 2: Waterfront-King George, Waterfront-Lougheed, VCC-Lafarge
  • Option 3: Waterfront-King George, Columbia-Lougheed, VCC-Lafarge

Does anyone have the link to said document above available?
It's no longer on-line as it was a background document for an RFP.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:40 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.