Quote:
Originally Posted by Ehlun
It will continue from VCC-Clark. Makes no sense for it to stop...
I think it would be the Evergreen Line to UBC.
The Millennium Line segment will be shortened to Waterfront to Lougheed Town Centre when the Evergreen Line opens. Thus the entire VCC-Clark to Lafarge Lake-Douglas will be known as the Evergreen Line.
|
According to the Evergreen docs, when the extension is finished the entire line from VCC-Clark through Lougheed to Lafarge Lake-Douglas will become "The Millennium Line".
The existing Expo line from Waterfront to King George will not be changed, so those trains will still be Expo line trains "to King George" terminal or "to Waterfront" terminal.
The trains from Waterfront to Lougheed (via New Westminster and Braid) will become Expo line trains "to Lougheed" terminal or "to Waterfront" terminal. Expo trains will not run west of Lougheed in regular passenger service.
Therefore the Expo line and Millennium line will run as separate and independent lines, with only Lougheed and Commercial/Broadway stations being the interchange points for passengers between the two lines.
Lougheed is the interchange point for trains, so access to/from the Edmonds maintenance centre can be made by trains on either the Expo or Millennium lines.
When The "Broadway-UBC" extension is built west of VCC-Clark, it too will be part of the "The Millennium Line" when it opens.