HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth


    Sutton Place Nova Centre in the SkyscraperPage Database

Building Data Page   • Halifax Skyscraper Diagram

Map Location

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Nov 30, 2013, 12:00 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
The image below is from Ziobrop's tumblr page - http://fillingtheholehfx.tumblr.com/.

It is convenient to have the dirt ramp so that the concrete trucks can drive down into the work site but at some point it will have to be removed. I wonder how long they will keep the dirt ramp? Once it is gone the concrete trucks will have to off-load from the street.

My guess is that they will probably build two levels covering the work site (as they currently appear to be doing) so that the concrete trucks can off-load as close to the work area as possible. But after a couple of levels are complete then off-loading from the street will probably be more advantageous(?)

All the concrete being used in the Nova Centre must be a real boon for the concrete company supplying it.


Last edited by fenwick16; Nov 30, 2013 at 12:12 AM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth
Forum Jump



Forum Jump


All times are GMT. The time now is 1:00 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.