Old Posted Dec 3, 2013, 8:06 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by Ziobrop View Post
I was told, by an architect friend working on the project, that with the exception of the Grafton street portion, the parking slabs were not being constructed to support the load of the concrete and pump trucks.
.
.
.
This is interesting. Thanks for posting this information.

Looking at the floor plan below, I wonder if all of Grafton Street will be able to bear the load of concrete and pumper trucks? This will be directly over the Exhibition Hall and part of it will be column-free.

If the column-free section of the Exhibition Hall can bear the load of concrete trucks then the supporting structure of the roof (i.e. a section of Grafton Street) might have to be designed like a bridge. This makes me wonder if the retail sections on either side of Grafton Street will be steel frame construction that will be both the retail section walls and roof trusses for the column-free section of the Exhibition Hall? It will be very interesting to see the engineering design that goes into the Exhibition Hall and Ballroom sections because of the large column-free spans.

(the source for both images is http://www.halifax2016.ca/ )


In the image below it appears as though the slanted Ballroom structural members might be steel(?)

Reply With Quote
     
     
  #3722  
Old Posted Dec 3, 2013, 11:33 AM
Nilan8888 Nilan8888 is offline
Registered User
 
Join Date: Apr 2009
Posts: 199
Have the latest changes to the design been approved yet? Last word was the government still hadn't signed off.
Reply With Quote
     
     
  #3723  
Old Posted Dec 3, 2013, 2:55 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
Quote:
Originally Posted by fenwick16 View Post
Looking at the floor plan below, I wonder if all of Grafton Street will be able to bear the load of concrete and pumper trucks? This will be directly over the Exhibition Hall and part of it will be column-free.

If the column-free section of the Exhibition Hall can bear the load of concrete trucks then the supporting structure of the roof (i.e. a section of Grafton Street) might have to be designed like a bridge.
i believe its a thickness/quantity of rebar issue. the parking slabs are quite slender, i would imagine they will be thicker under Grafton street.

I refer you to this post on Structure and this one on 2 way spanning slabs.
Reply With Quote
     
     
  #3724  
Old Posted Dec 3, 2013, 3:58 PM
beyeas beyeas is offline
Fizzix geek
 
Join Date: Aug 2007
Location: South End, Hali
Posts: 1,318
Quote:
Originally Posted by fenwick16 View Post
This is interesting. Thanks for posting this information.

Looking at the floor plan below, I wonder if all of Grafton Street will be able to bear the load of concrete and pumper trucks? This will be directly over the Exhibition Hall and part of it will be column-free.

If the column-free section of the Exhibition Hall can bear the load of concrete trucks then the supporting structure of the roof (i.e. a section of Grafton Street) might have to be designed like a bridge. This makes me wonder if the retail sections on either side of Grafton Street will be steel frame construction that will be both the retail section walls and roof trusses for the column-free section of the Exhibition Hall? It will be very interesting to see the engineering design that goes into the Exhibition Hall and Ballroom sections because of the large column-free spans.
I am at a conference this week at McCormick Place in Chicago (MonctonRad, I assume you are here too?), and it is pretty impressive to see the exhibit hall here… 2.7 million square feet total space, with 1 million alone in the main exhibit room in the south building!
Reply With Quote
     
     
  #3725  
Old Posted Dec 3, 2013, 4:40 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,159
Quote:
Originally Posted by beyeas View Post
I am at a conference this week at McCormick Place in Chicago (MonctonRad, I assume you are here too?), and it is pretty impressive to see the exhibit hall here… 2.7 million square feet total space, with 1 million alone in the main exhibit room in the south building!
Nope, I don't like the RSNA very much. A conference with 25-30,000 attendees is too big for me. I much prefer the Roentgen Ray Society instead. Also, Chicago in early December can be pretty frigid. The ARRS in May on the other hand will be in San Diego.

McCormack Place is truly spectacular though, especially the exhibit hall.
__________________
Go 'Cats Go

Last edited by MonctonRad; Dec 3, 2013 at 7:23 PM.
Reply With Quote
     
     
  #3726  
Old Posted Dec 3, 2013, 5:03 PM
beyeas beyeas is offline
Fizzix geek
 
Join Date: Aug 2007
Location: South End, Hali
Posts: 1,318
Quote:
Originally Posted by MonctonRad View Post
Nope, I don't like the RSNA very much. A conference with 25-30,000 attendees is too big for me. I much prefer the Roentgen Ray Society instead. Also, Chicago in early December can be pretty frigid. The ARRS in May on the other hand will be in San Diego.

McCormack Place is truly spectacular though, especially the exhibit hall.
Actually there is 51,000 people here this year, so it has more than doubled since you last went!
I have never gone to RSNA before this year either! My conference that I prefer to go to every year is ISMRM, which is in Milan this year :-)
Reply With Quote
     
     
  #3727  
Old Posted Dec 3, 2013, 6:35 PM
Keith P.'s Avatar
Keith P. Keith P. is offline
Registered User
 
Join Date: Mar 2006
Posts: 8,852
I thought people did not attend conferences any more? The experts, Phil Pacey and Tim Bousquet assured me that was the case.

What is the world coming to?!?
Reply With Quote
     
     
  #3728  
Old Posted Dec 4, 2013, 3:04 AM
beyeas beyeas is offline
Fizzix geek
 
Join Date: Aug 2007
Location: South End, Hali
Posts: 1,318
Quote:
Originally Posted by Keith P. View Post
I thought people did not attend conferences any more? The experts, Phil Pacey and Tim Bousquet assured me that was the case.

What is the world coming to?!?
meh… what do 51,000 people know eh?
Reply With Quote
     
     
  #3729  
Old Posted Dec 4, 2013, 3:20 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by beyeas View Post
I am at a conference this week at McCormick Place in Chicago (MonctonRad, I assume you are here too?), and it is pretty impressive to see the exhibit hall here… 2.7 million square feet total space, with 1 million alone in the main exhibit room in the south building!
Those numbers are mind-boggling. I have been to a few conventions/trade shows in major US cities but I haven't been in the McCormick Place.
Reply With Quote
     
     
  #3730  
Old Posted Dec 4, 2013, 3:31 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by Ziobrop View Post
i believe its a thickness/quantity of rebar issue. the parking slabs are quite slender, i would imagine they will be thicker under Grafton street.

I refer you to this post on Structure and this one on 2 way spanning slabs.
Thanks for the links Ziobrop. I dreamed as a teenager of designing bridges and skyscrapers but took chemical engineering instead. So I am interested in any structural engineering/construction information.

Thanks again for maintaining your tumblr page - http://fillingtheholehfx.tumblr.com/. I check it daily, and I see today that the dirt ramp is getting smaller. I am looking forward to seeing all the groundwork being completed.

(source: )
Reply With Quote
     
     
  #3731  
Old Posted Dec 7, 2013, 4:38 PM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
There are several concrete mixer trucks coming and going today even though it is Saturday - http://www.novascotiawebcams.com/halifax/nova-centre-construction.html. It is great to see such rapid progress taking place.

It appears as though they can build several levels high on the Market Street side before reaching ground level. If the permit and amendment process takes more than the estimated 8 months, maybe they can continue building on the Market Street side to ground level.
Reply With Quote
     
     
  #3732  
Old Posted Dec 14, 2013, 12:47 PM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
I notice that there haven't been concrete mixer trucks for the past few days and I assume that it is because it is too cold to pour concrete. Hopefully they will get some warmer spells so they can resume pouring the concrete structure.
Reply With Quote
     
     
  #3733  
Old Posted Dec 14, 2013, 9:55 PM
teddifax's Avatar
teddifax teddifax is offline
Halifax Promoter!
 
Join Date: Jul 2012
Location: Halifax
Posts: 1,113
I know they are working now in advance of final approval, but when is that supposed to happen?
Reply With Quote
     
     
  #3734  
Old Posted Dec 15, 2013, 1:06 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by teddifax View Post
I know they are working now in advance of final approval, but when is that supposed to happen?
The estimate was 8 months back in mid-July/early August. Based on that estimate it would be around the end of March, 2014. It appears as though they have enough work to continue to the end of March and even beyond if they continue building floor levels on the Market Street side (it appears as through Market Street is around 70 feet from ground level).

I am not sure if it has been determined that an amendment is required (for closing Grafton Street to vehicular through-traffic). If an amendment is required then I hope that the process has been started. If an amendment isn't required then it will just be the usually permit approval and HRM_by_Design Design Review Committee approval of the exterior elements.
Reply With Quote
     
     
  #3735  
Old Posted Dec 15, 2013, 2:07 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
I hadn't seen this rendering before of the Market Street side. It shows that a large section will be glass on the Market Street side, and it also shows a curved roof style over the column free section of the Ballroom and Exhibit Hall.

(source: Rank Inc. presentation for the October 24, 2013 open house - http://www.halifax.ca/planning/documents/18708PIMPresentationbyApplicant.pdf)

Reply With Quote
     
     
  #3736  
Old Posted Dec 15, 2013, 5:22 PM
RyeJay RyeJay is offline
BANNED
 
Join Date: Apr 2011
Posts: 3,086
Thank you, fenwick, for posting this. This has been previously unseen by me as well.

Has anyone come across information about the public displays of art, such as the statues in this rendering? This development has obviously not been a stranger to public consultations. I am curious about final decisions.

The semi-merged towers along Argyle look great, from what we can see of them. Seeing the back of them helps me appreciate how they really do resemble a ship. The configuration of this project is so oddly arranged, it has to be investigated from all sides in order to get a true appreciation of what's being built. The Nova Centre looks fun and entertaining, and the foot traffic in this area could very well explode.

I hope the naysayers aren't too disappointed with this success.
Reply With Quote
     
     
  #3737  
Old Posted Dec 24, 2013, 5:25 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
It is good to see that the builders found a short stretch of weather warm enough to pour some more concrete:

(source: Ziobrop's tumblr page from Dec 23, 2013 - http://fillingtheholehfx.tumblr.com/ )
Reply With Quote
     
     
  #3738  
Old Posted Dec 24, 2013, 4:33 PM
Duff's Avatar
Duff Duff is offline
Registered User
 
Join Date: Oct 2012
Location: West End Halifax
Posts: 337
I heard from a source that there will be a fourth crane installed but its only purpose will be to offload trucks.
Reply With Quote
     
     
  #3739  
Old Posted Dec 30, 2013, 2:06 PM
ns_kid's Avatar
ns_kid ns_kid is offline
Registered User
 
Join Date: Sep 2013
Posts: 550
Pedway connection

Lydon Lynch is requesting an amendent to the TD Centre development agreement to allow for a pedway connection to the proposed 22 Commerce Square project across Granville Street.

http://22ndcommercesquare.ca/default.asp?mn=1.44

This is a positive development; in fact, I believe HRM should insist on provision for pedway connections in any new project.

Which brings us to Nova Centre. As far as I can tell, no plans yet presented for Nova Centre include any indoor connection to the rest of the downtown link system, even though the link-connected Prince George Hotel is just across Prince Street. (I expect linking Nova Centre through the Prince George would require significant renovations to the hotel.) There may also be an opportunity to extend the link to the Marriott Residence and/or Cambridge Suites hotels and possibly Neptune Theatre across Sackville Street.

Anyone have different information? There certainly does not seem to be any allowance for underground connections in the subgrade work now underway.

When this project comes back to regional council for final approval in the new year, I hope the downtown link question is something councillors will ensure is addressed fully.
Reply With Quote
     
     
  #3740  
Old Posted Dec 30, 2013, 2:22 PM
counterfactual counterfactual is offline
Registered User
 
Join Date: Jul 2013
Location: Parts Unknown
Posts: 1,796
Quote:
Originally Posted by ns_kid View Post
Lydon Lynch is requesting an amendent to the TD Centre development agreement to allow for a pedway connection to the proposed 22 Commerce Square project across Granville Street.

http://22ndcommercesquare.ca/default.asp?mn=1.44

This is a positive development; in fact, I believe HRM should insist on provision for pedway connections in any new project.

Which brings us to Nova Centre. As far as I can tell, no plans yet presented for Nova Centre include any indoor connection to the rest of the downtown link system, even though the link-connected Prince George Hotel is just across Prince Street. (I expect linking Nova Centre through the Prince George would require significant renovations to the hotel.) There may also be an opportunity to extend the link to the Marriott Residence and/or Cambridge Suites hotels and possibly Neptune Theatre across Sackville Street.

Anyone have different information? There certainly does not seem to be any allowance for underground connections in the subgrade work now underway.

When this project comes back to regional council for final approval in the new year, I hope the downtown link question is something councillors will ensure is addressed fully.
Great point.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth
Forum Jump



Forum Jump


All times are GMT. The time now is 1:44 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.