http://ottawa.ca/en/city-hall/planning-and-development/week-lansdowne
•Work this week at the south side stands focused on installing the precast concrete risers that the seats will be mounted on at the second and third level.
•Inside the south stands, the offices, locker rooms and other spaces at the lower levels are being finished.
•Construction of the Veil, the iconic wooden surround, is expected to begin as early as next week.
•At the north stands, seat installation continues as the red and grey seats continue to go in.
•Inside the arena, repairs to the roof have started.
•The first pavers of the new Great Porch were laid this week, south of the Aberdeen. The large new plaza will feature planters, seating, bike racks and water fountains and will be a meeting place on the edge of the Great Lawn.
•Elsewhere in the park, underground infrastructure is being installed, and work on the seating wall and base for additional open areas around the Aberdeen Pavilion continues.
•Work to build the new condominium at the corner of Bank and Holmwood has started; the contractor is now pouring the concrete structure for the second level of the residential tower.
•Some of the new retail buildings are being enclosed and mechanical and electrical systems installed inside.