Quote:
|
If its a short-turn service then I think it would be easier to have a separate route from Guildford to Braid/Lougheed via the 152 St on-ramp. That would be easier and quicker to implement as no extra stop is needed, cheaper for TransLink because of the shorter distance and no need to extend bus routes to 156th, and probably higher ridership potential as there's more destinations on the 152nd than the 156th.
|
That defeats the point. The bus would have to move lanes to hit the HOV lane for the Lougheed exit and vice-versa; it'd be shared traffic, as there'd be no queue jumping, and not as predictabe, which is an important part of the point for the 555. As well, #555 access at 156 St should remain a priority, as it could be key for connections further east in the future (Fraser Valley) as well. You are suggesting that your suggested service is an excuse to forget about the 156 St stop, which shouldn't happen.
I agree, it would be easier to some extent to just bring such a service to Guildford Exchange, but it distracts from what needs to be done and who really needs to be serviced here. Fraser Heights is the fastest-growing transit market in the City of Surrey. Fleetwood, which would also be best-serviced from 156 St, would somewhat miss out. You'd lose out on the benefits of providing service to the almost-forgotten East Guildford Park-n-Ride. And, finally, 156th St is a 3 minute bus-ride from Guildford Exchange by
several different bus routes.
My idea would have the short-turn service the exit at 160 St, turn right on 104 WB and stop to service the E Guildford P&R, stop again at 156 St northbound (to service transferees from 326/335 from Fleetwood or Guildford Exch), stop at the westbound HOV ramp, and then continue on. It would run alongside 555 service (with the added stop in both directions).
Also, the distance/travel time would be neither shorter/cheaper for the 152 St exit idea - it would probably be the opposite.
Quote:
|
I keep thinking.. it would be nice if they extend the #375 to either Coquitlam or Braid/Lougheed via Hwy 1, and eventually upgrade it to a FTN or B-Line...
|
I think the 375 was sort of designed for such an extension in the future, although Coquitlam Centre would probably make more sense. Riders probably wouldn't save much time with a direct extension to Braid of the 375, compared to taking the 96 B-Line or 345 up to SkyTrain and then using that.