Many builders have done this - heck, the Edge had to completely change. In my opinion, it's simply a response to the market. Projects that offer innovative and practical designs, and those that have been created to appeal to a specific demographic, generally have no problem selling. Projects that are simply duplicates of previous projects with little to no improvements, or offer nothing unique, often have issues with sales and usually have to re-design, or in some cases, re-brand.
I understand that it takes time to sell a building of that size, however, they are less than 10% sold out after being open since May - roughly 6 moths ago. At 20%/year, it'll be longer than 3 years. However, sales aren't a consistent thing, generally buildings get most of their sales at the very beginning, when construction starts and then at the very end when people can actually walk into the suite they want to buy. After 6 months, the opening sales momentum has surely died down. But these new plans may be enough to build sales momentum back up, only time will tell.
Quote:
Originally Posted by gjhall
It's not very unusual at all for a builder to change up the floorplans as the sales process moves forward. Minto did this with UpperWest when they were being asked for more 2 bedroom units I believe.
Claridge said at some point early on they expected it to take 3 years of sales before construction.
|