Quote:
Originally Posted by Ziobrop
I walk by the hole several times per day, so updates should be regular during the work week.
if anyone wants better detail pics of something, let me know, and ill bring my SLR.
-Peter
|
This picture where they are preparing to build the peripheral wall is interesting -
http://fillingtheholehfx.tumblr.com/image/63095983475. It appears as though the concrete will be poured directly between an inner form and the bedrock wall. Maybe this is the normal way of forming a peripheral wall when a concrete wall is next to bedrock?
It will be interesting to see these underground peripheral walls being formed.
I look forward to seeing the ground work completed so that the progress will advance more quickly.