Quote:
Originally Posted by Tfreder View Post
I would actually have to say that the line is almost near capacity during rush hour. Have you ever taken a train from City Centre to Richmond between 4:30pm - 6:15pm? It's not over capacity, but most of the time the Richmond bound trains cannot fit any more people in them.

Thankfully the evergreen line won't be cursed with those short platforms
The short platforms on the Canada Line are precisely the length needed for the trains stopping at the stations.

When the 3rd "C" car is added to the Canada Line trains to add capacity, the platforms will also be lengthened to match the longer trains.

If the longer platforms were built as part of the original construction, we'd be hearing for decades about the 'damm fools who wasted money on stations with platforms that are too long for the trains" - until the longer trains are added to the system.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:57 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.