Old Posted Sep 9, 2013, 9:17 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Quote:
Originally Posted by st7860 View Post
The thing is because of the way the Canada line was funded(public private etc) its not so simple to even use more trainsets to meet demand. for comparision, on the expo line its easy. translink just needs to call BCRTC and ask them to send out more trains .
Either way, there is a bill to be paid for the extra service - BCRTC is not free - and I've never seen any material to suggest that ProTrans has a premium cost per train trip over BCRTC. I believe both operators are able to respond on short notice with extra trains and we've seen that in the past. The limitation is still Translink's ability to pay for the extra trips.
     
     
  #2  
Old Posted Sep 10, 2013, 4:24 PM
st7860 st7860 is offline
BANNED
 
Join Date: Nov 2010
Posts: 1,299
Quote:
Originally Posted by Zassk View Post
Either way, there is a bill to be paid for the extra service - BCRTC is not free - and I've never seen any material to suggest that ProTrans has a premium cost per train trip over BCRTC. I believe both operators are able to respond on short notice with extra trains and we've seen that in the past. The limitation is still Translink's ability to pay for the extra trips.

The Protrans agreement is secret so the public won't know the exact cost of an extra train. I haven't read anything either about the extra cost. What people say is that well, the contract says they have to provide X trains at Y time of the day, and anything more than that, translink has to pay for.
     
     
  #3  
Old Posted Sep 10, 2013, 6:29 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Quote:
Originally Posted by st7860 View Post
What people say is that well, the contract says they have to provide X trains at Y time of the day, and anything more than that, translink has to pay for.
Yes, and whenever BCRTC runs an extra train on Expo or Evergreen, there will be a cost that Translink must pay as well.
     
     
  #4  
Old Posted Sep 11, 2013, 10:00 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,748
Quote:
Originally Posted by Zassk View Post
Yes, and whenever BCRTC runs an extra train on Expo or Evergreen, there will be a cost that Translink must pay as well.
it's just harder to quantify and point a finger at...

Quote:
Originally Posted by aberdeen5698 View Post
The double track allows them to add a crossover switch beyond the station which can significantly increase ultimate capacity. If the Broadway line ever gets opened then at some point it will reach the kind of volumes which would require that kind of capacity, so it's a good idea to provide for that eventuality.
Agreed regarding a switch after the station (avoiding the delay of trains crossing in front of each other) increasing capacity - but given the various crossings at Lougheed, will they ever need/be able to achieve that high an ultimate capacity?
     
     
  #5  
Old Posted Sep 11, 2013, 3:52 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by officedweller View Post
Agreed regarding a switch after the station (avoiding the delay of trains crossing in front of each other) increasing capacity - but given the various crossings at Lougheed, will they ever need/be able to achieve that high an ultimate capacity?
That's a good point. I can't help feeling that Braid/Sapperton are a glitch in the design of the overall network because of the way they split frequency for both lines. I guess one option, which I'm sure would be strongly resisted by some, would be to abandon them or at least severely curtail their service level when it gets to the point that they're the bottleneck.
     
     
  #6  
Old Posted Sep 11, 2013, 3:55 PM
Axe Axe is offline
Registered User
 
Join Date: Oct 2009
Posts: 78
why would you ever abandon those station?? how would that help the system?
     
     
  #7  
Old Posted Sep 11, 2013, 4:07 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,681
Quote:
Originally Posted by aberdeen5698 View Post
That's a good point. I can't help feeling that Braid/Sapperton are a glitch in the design of the overall network because of the way they split frequency for both lines. I guess one option, which I'm sure would be strongly resisted by some, would be to abandon them or at least severely curtail their service level when it gets to the point that they're the bottleneck.
Worst. Idea. Ever.
     
     
  #8  
Old Posted Sep 11, 2013, 5:04 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Quote:
Originally Posted by aberdeen5698 View Post
That's a good point. I can't help feeling that Braid/Sapperton are a glitch in the design of the overall network because of the way they split frequency for both lines. I guess one option, which I'm sure would be strongly resisted by some, would be to abandon them or at least severely curtail their service level when it gets to the point that they're the bottleneck.
Both stations are getting anchor developments beside them. ToD is arriving and it is too late to consider whether they were good or bad ideas.
     
     
  #9  
Old Posted Sep 11, 2013, 5:31 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,099
Quote:
Originally Posted by officedweller View Post
it's just harder to quantify and point a finger at...



Agreed regarding a switch after the station (avoiding the delay of trains crossing in front of each other) increasing capacity - but given the various crossings at Lougheed, will they ever need/be able to achieve that high an ultimate capacity?
The Millennium train can always wait for an Evergreen train. There should be more than enough time to cross over when the Evergreen train is loading within the station. I think the bottle neck is still at the end of the track.


Quote:
Originally Posted by aberdeen5698 View Post
That's a good point. I can't help feeling that Braid/Sapperton are a glitch in the design of the overall network because of the way they split frequency for both lines. I guess one option, which I'm sure would be strongly resisted by some, would be to abandon them or at least severely curtail their service level when it gets to the point that they're the bottleneck.
That's that Chicago did.. to the point they ended up just demolish the line all together...
     
     
  #10  
Old Posted Sep 11, 2013, 5:40 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,099
And.. regarding to Evergreen Line construction, today they are demolishing part of the pre-built platform at Lougheed station, stating from the west side
     
     
  #11  
Old Posted Sep 11, 2013, 6:01 PM
queetz@home's Avatar
queetz@home queetz@home is offline
Go Rotem! Die Bombardier!
 
Join Date: Jul 2001
Location: Ortigas
Posts: 3,679
Quote:
Originally Posted by nname View Post
And.. regarding to Evergreen Line construction, today they are demolishing part of the pre-built platform at Lougheed station, stating from the west side
I'm assuming you are referring to the passenger platform, correct?
     
     
  #12  
Old Posted Sep 11, 2013, 9:12 PM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 767
Quote:
Originally Posted by nname View Post
And.. regarding to Evergreen Line construction, today they are demolishing part of the pre-built platform at Lougheed station, stating from the west side
It looked to me (vaguely between gaps in the plastic sheeting) that they were only demolishing a portion of the platform, presumably where an escalator of elevator would be at the west end.
They've also started putting up boards of wood along the outer edge of the platform where the glass will eventually go.

From the work on the guideway columns on the existing pillars, it looks like they're not planning to take out that bump on the inbound guideway, and it looks like they might keep it at that height (or higher) for at least the first part of the curve.

Quote:
Originally Posted by Mac Write View Post
We want photos.
Video from this morning (unfortunately not showing the platform demolition at the west end of the platform)
     
     
End
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:22 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.