I'd happily lose that glass walkway if it meant construction of a 46 floor office tower in that location. So long as they keep a PATH connection to get to the CN Tower for when bad weather kicks in I would be happy.
As it is, with the construction of Ripley's Aquarium I don't use the skywalk anymore to get to the Rogers Centre from Union Station.

A new office tower going in here would create a great opportunity to improve this bit of Front St and add in some more bars on both sides (ie Front and Station Streets). Several bars would be better than the East Side Mario's currently there. I've only been in there once, and have had no inclination to go back.
     
     
  #8142  
Old Posted Sep 4, 2013, 11:06 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
Quote:
Originally Posted by Innsertnamehere View Post
So apparently An application for 171 front has been resubmitted to the city, but this time it contains a 46 story office building. (It was 36 in the previous application) this could easily put it at over 200m considering the akward relationship the base has with union station. (The first office floors wouldn't start until it is already 20-30 meters up as they have to build on top of the skywalk)
My understanding that this application is a little different than what we're used to seeing. They are basically applying for building permits on the assumption the tower meets current zoning. A spring ground breaking is a strong possibility.
     
     
  #8143  
Old Posted Sep 5, 2013, 12:12 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,868
nope, it is just rezoning..
     
     
  #8144  
Old Posted Sep 5, 2013, 1:07 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Good to see 171 Front could be moving forward in pretty short order.

Once we get a height on it, it should make the list top 30 if its over 200 meters.
     
     
  #8145  
Old Posted Sep 5, 2013, 1:19 PM
niwell's Avatar
niwell niwell is offline
sick transit, gloria
 
Join Date: Nov 2004
Location: Roncesvalles, Toronto
Posts: 11,640
According to the City of Toronto site the rezoning application was submitted back in December. The current application is a zoning review, which I believe is to determine whether or not what they want to build can be accommodated under the current zoning. This would jive with what Whippersnapper posted above and could allow for a quick start to the tower assuming it goes through. Given the location and that it is office I suspect it would.

http://app.toronto.ca/ApplicationStatus/details.do?folderRsn=3422987
     
     
  #8146  
Old Posted Sep 5, 2013, 1:39 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Whippersnapper, aka Mr. Knowitall
     
     
  #8147  
Old Posted Sep 5, 2013, 2:39 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,868
Ahh some confusion, I thought that whippersnapper was referring to a building permit being filed, which is not what was filed.
     
     
  #8148  
Old Posted Sep 5, 2013, 2:58 PM
FrankieFlowerpot's Avatar
FrankieFlowerpot FrankieFlowerpot is offline
Registered User
 
Join Date: Aug 2012
Posts: 3,478
Looks like the red glass is back on E Condos

http://bazis.ca/blog/new-exterior-renderings-for-phase-2-of-e-condos/

     
     
  #8149  
Old Posted Sep 5, 2013, 3:18 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
That looks great. I really hope this one goes through. Toronto is truly becoming a megacity. Three clusters along Yonge will have tower(s) of 200 meters or more, plus a fourth with a dense cluster of highrises, some of them at or over 150 meters(North York)! Plus with Eau de Soleil, Toronto will have a fourth 200+ meter cluster along Humber Bay! Very impressive!
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
  #8150  
Old Posted Sep 5, 2013, 4:20 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
So construction on this one may begin shortly.....

Interesting..
     
     
  #8151  
Old Posted Sep 5, 2013, 4:54 PM
Ramako's Avatar
Ramako Ramako is offline
Moderator
 
Join Date: Nov 2008
Location: Toronto
Posts: 4,415
Quote:
Originally Posted by Chadillaccc View Post
That looks great. I really hope this one goes through. Toronto is truly becoming a megacity. Three clusters along Yonge will have tower(s) of 200 meters or more, plus a fourth with a dense cluster of highrises, some of them at or over 150 meters(North York)! Plus with Eau de Soleil, Toronto will have a fourth 200+ meter cluster along Humber Bay! Very impressive!
E Condos will be under 200 metres. More like ~195 metres.
     
     
  #8152  
Old Posted Sep 5, 2013, 5:08 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Oh I forgot about the height decrease. Wasn't it originally 202?
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
  #8153  
Old Posted Sep 5, 2013, 5:25 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
Quote:
Originally Posted by Innsertnamehere View Post
Ahh some confusion, I thought that whippersnapper was referring to a building permit being filed, which is not what was filed.
This is an application for a building permit. If accepted, It is likely demo and shoring permits will quickly follow.
     
     
  #8154  
Old Posted Sep 5, 2013, 5:50 PM
Ramako's Avatar
Ramako Ramako is offline
Moderator
 
Join Date: Nov 2008
Location: Toronto
Posts: 4,415
Quote:
Originally Posted by WhipperSnapper View Post
This is an application for a building permit. If accepted, It is likely demo and shoring permits will quickly follow.
So can we assume that this is being built on spec? I'd have thought that they'd have announced an anchor tenant if they were ready to build.
     
     
  #8155  
Old Posted Sep 5, 2013, 7:30 PM
Ramako's Avatar
Ramako Ramako is offline
Moderator
 
Join Date: Nov 2008
Location: Toronto
Posts: 4,415
Another view of E Condos from Bazis' blog:






Also, the database is off just slightly. According to the Final Report, this will be 195.75 metres, not 194.4 metres. Sweet, a 1.35 metre increase!
     
     
  #8156  
Old Posted Sep 5, 2013, 8:42 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Quote:
Originally Posted by Ramako View Post
So can we assume that this is being built on spec? I'd have thought that they'd have announced an aalready if they were ready to build.
Is it possible that the office space could house Solutions/Network/Systems Staff to support the network/storage hardware already located in the building. kinda like upsizing their existinf business.
     
     
  #8157  
Old Posted Sep 6, 2013, 3:11 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,149
IMO there is no way 171 is moving forward on spec, it would be absolutely insane.

There are very few large tenants on the market and millions of SF still unaccouted for in the new builds, let alone the staggering amount of backfill needed to patch up the existing buildings.

There is a slight possibility one more building will go this cycle, but I doubt it will be 171 and I doubt we'll see another major commercial tower break ground in the core in the next 5 years.

I'm not particularity bearish on the toronto economy, but we just have a lot of unspoken for space to fill before a new round of new builds hit the dirt. This kind of cycle is pretty standard in a healthy commercial market.
     
     
  #8158  
Old Posted Sep 6, 2013, 4:42 PM
rbt rbt is offline
Registered User
 
Join Date: Jun 2006
Posts: 1,387
Quote:
Originally Posted by LeftCoaster View Post
IMO there is no way 171 is moving forward on spec, it would be absolutely insane.
The entire building on spec? Nope.

Would they build the podium and leave the tower as a future element in order to make the data center larger? Possibly.

Anybody that could move their equipment has. What remains is location sensitive and willing to pay a large premium for it.
     
     
  #8159  
Old Posted Sep 6, 2013, 4:50 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Play devil's advocate and state that while the Toronto economy is not great, possible going downhill at the present; However data, storage, networking, back up, and communications is nothing but a major growth industry moving forward. The ability to maximize the returns on an already solid real estate play/ business model seems to be in the works at this location.
     
     
  #8160  
Old Posted Sep 6, 2013, 5:43 PM
FrankieFlowerpot's Avatar
FrankieFlowerpot FrankieFlowerpot is offline
Registered User
 
Join Date: Aug 2012
Posts: 3,478
Quote:
Originally Posted by caltrane74 View Post
Play devil's advocate and state that while the Toronto economy is not great, possible going downhill at the present; However data, storage, networking, back up, and communications is nothing but a major growth industry moving forward. The ability to maximize the returns on an already solid real estate play/ business model seems to be in the works at this location.
There's a pretty big data centre under construction in the Distillery district at the minute isn't there?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 7:25 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.