  #5281  
Old Posted Aug 22, 2013, 3:21 PM
VancouverMark VancouverMark is offline
Registered User
 
Join Date: Jul 2011
Posts: 23
Quote:
Originally Posted by DKaz View Post
Listened to the radio, absolutely no traffic on the Mary Hill Bypass westbound.
I drove it this morning and this isn't entirely true. WB MHB was flowing great. Two lanes go up on to the new overpass and then they merge to form a single lane. THis caused a slight backup but nothing like we are used to seeing on MHB. I imagine this will improve once they open all the WB HWY1 lanes.
     
     
  #5282  
Old Posted Aug 22, 2013, 6:55 PM
Mininari Mininari is offline
Registered User
 
Join Date: Jul 2004
Location: Victoria (formerly Port Moody, then Winnipeg)
Posts: 2,447
Quote:
Originally Posted by VancouverMark View Post
I drove it this morning and this isn't entirely true. WB MHB was flowing great. Two lanes go up on to the new overpass and then they merge to form a single lane. THis caused a slight backup but nothing like we are used to seeing on MHB. I imagine this will improve once they open all the WB HWY1 lanes.
Re: Traffic, don't forget its mid-August. We'll see how everything runs in September when "Back to everything" traffic shows up. Maybe they can get the 4th highway lane westbound open by then? If not, expect it to be heavy in that merge zone in the mornings after Labour Day.

Once that 4th WB lane is open then we'll see how the 'no additional capacity' Vancouver exits function in the morning

Anyway, arriving in town in 4-5 days by car, so I can't wait to check this all out!
     
     
  #5283  
Old Posted Aug 22, 2013, 9:15 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,503
Quote:
Originally Posted by Mininari View Post
Anyway, arriving in town in 4-5 days by car, so I can't wait to check this all out!
The scale of the new bridge next to the old one is something to behold.
     
     
  #5284  
Old Posted Aug 22, 2013, 9:28 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Quote:
Originally Posted by Mininari View Post
Re: Traffic, don't forget its mid-August. We'll see how everything runs in September when "Back to everything" traffic shows up. Maybe they can get the 4th highway lane westbound open by then? If not, expect it to be heavy in that merge zone in the mornings after Labour Day.

Once that 4th WB lane is open then we'll see how the 'no additional capacity' Vancouver exits function in the morning

Anyway, arriving in town in 4-5 days by car, so I can't wait to check this all out!
Mary Hill Bypass freeflows into a 4th lane which ends just past the Brunette exit for now. There's a 5th lane too ready to open between Lougheed and Brunette but they're probably waiting to do so.

They're opening the Lougheed westbound ramp from the Port Mann Bridge too sometime next month which will take some strain off that section.
     
     
  #5285  
Old Posted Aug 22, 2013, 9:28 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,586
The westbound HOV ramp at Granview Hwy looks to have received its final layer of paving last night.


http://wcs.pbaeng.com/projects/PMH1

Bridge demolition moving quickly:


http://wcs.pbaeng.com/projects/PMH1


http://wcs.pbaeng.com/projects/PMH1
     
     
  #5286  
Old Posted Aug 22, 2013, 10:16 PM
VancouverMark VancouverMark is offline
Registered User
 
Join Date: Jul 2011
Posts: 23
Quote:
Originally Posted by Mininari View Post
Re: Traffic, don't forget its mid-August. We'll see how everything runs in September when "Back to everything" traffic shows up.
IMHO the difference in traffic between summer and the rest of the year is negligible. As someone who lives down here and drives the Highway 1 corridor from PoCo to North vancouver daily, I would even argue it has been busier this summer than the rest of the year. The 2nd Narrows has become the "new old Port Mann".
     
     
  #5287  
Old Posted Aug 23, 2013, 12:34 AM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by VancouverMark View Post
I drove it this morning and this isn't entirely true. WB MHB was flowing great. Two lanes go up on to the new overpass and then they merge to form a single lane. THis caused a slight backup but nothing like we are used to seeing on MHB. I imagine this will improve once they open all the WB HWY1 lanes.
When it is final the MHB WB will have 1 lane merging onto the express lanes which is what is happening right now. But the other R/S lane will merge onto the collector lanes to access the lougheed and if need be the HWY1 WB.
     
     
  #5288  
Old Posted Aug 23, 2013, 1:15 AM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Quote:
Originally Posted by VancouverMark View Post
I drove it this morning and this isn't entirely true. WB MHB was flowing great. Two lanes go up on to the new overpass and then they merge to form a single lane. THis caused a slight backup but nothing like we are used to seeing on MHB. I imagine this will improve once they open all the WB HWY1 lanes.
Was that slowdown anywhere near as bad as a 20 minute backup from the pedestrian overpass? did you even need to stop or just slow down? I used to drive on the MHB everyday from Mission to Vancouver.
     
     
  #5289  
Old Posted Aug 23, 2013, 2:42 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,401
Can someone please remind me, when should all new lanes and ramps along the Highway 1 be in use? Still this year or next year? When is the whole project going to wrap up?
     
     
  #5290  
Old Posted Aug 23, 2013, 3:05 AM
go_leafs_go02 go_leafs_go02 is offline
Registered User
 
Join Date: Dec 2007
Location: London, ON
Posts: 2,406
Quote:
Originally Posted by Klazu View Post
Can someone please remind me, when should all new lanes and ramps along the Highway 1 be in use? Still this year or next year? When is the whole project going to wrap up?
Should be at this point next year. Think they said the old bridge will be gone and the new bridge be complete next year.
     
     
  #5291  
Old Posted Aug 23, 2013, 3:39 AM
Pinion Pinion is offline
See ya down under, mates
 
Join Date: Jul 2007
Posts: 5,167
Quote:
Originally Posted by Klazu View Post
Can someone please remind me, when should all new lanes and ramps along the Highway 1 be in use? Still this year or next year? When is the whole project going to wrap up?
They just said they're going to re-do the the north side of second narrows, so highway construction is here for a while yet.

Quote:
BIG changes could be afoot for one of the most traffic snarled areas of the North Shore as the Ministry of Transportation and Infrastructure and the District of North Vancouver are looking at a redesign of roads and Highway 1 access in the Lower Lynn and Seymour areas.

The project includes extending Keith Road around the Seylynn development to Mount Seymour Parkway via Fern Street overpass, widening the Keith Road bridge to four lanes, upgrades and a new park-and-ride lot for Phibbs Exchange, and a possible reroute of the Dollarton Highway and Mountain Highway on- and off-ramps.
http://www.nsnews.com/ministry-to-unveil-hwy-1-redesign-1.595871
     
     
  #5292  
Old Posted Aug 23, 2013, 4:13 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,401
Quote:
Originally Posted by Pinion View Post
They just said they're going to re-do the the north side of second narrows, so highway construction is here for a while yet.
Thank you for the information. It has passed me completely. That area is definitely in need of a complete re-do, but those seem like enhancements to me, rather than re-doing the whole part. It doesn't sound like that will address the problems of merging with traffic, nor will it add the needed extra 3rd lane each way.
     
     
  #5293  
Old Posted Aug 23, 2013, 6:09 AM
troublemaker troublemaker is offline
Registered User
 
Join Date: Aug 2011
Posts: 83
What's happening on Hwy 1 between 232 and 264?
     
     
  #5294  
Old Posted Aug 23, 2013, 6:21 AM
Pinion Pinion is offline
See ya down under, mates
 
Join Date: Jul 2007
Posts: 5,167
Quote:
Originally Posted by Klazu View Post
Thank you for the information. It has passed me completely. That area is definitely in need of a complete re-do, but those seem like enhancements to me, rather than re-doing the whole part. It doesn't sound like that will address the problems of merging with traffic, nor will it add the needed extra 3rd lane each way.
That part of the highway goes through a native reserve so widening it is probably complicated, but yeah it seems more about fixing the streets around it. Fixing the southbound on-ramp from Dollarton alone would help a lot though since there isn't enough room for people to get up to 70km/h quickly. I always go into the left lane there for safety reasons.

Really, the biggest problem for north shore highway 1 users is still the Willingdon area.

Last edited by Pinion; Aug 23, 2013 at 9:10 AM. Reason: Meant Dollarton, not Main
     
     
  #5295  
Old Posted Aug 23, 2013, 7:18 AM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
The North Van improvements will only make things safer but that bridge is still going to be a bottle neck. Look at Queensborough Bridge for example, safer on both ends but it's still a traffic nightmare.

I still remember back in the mid 90s when a concrete mixing truck heading off the Queensborough onto Marine took the loop too fast and tipped over onto a car heading the other direction from Marine onto the Queensborough, crushing it and killing the driver instantly.
     
     
  #5296  
Old Posted Aug 23, 2013, 7:53 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,940
Quote:
Originally Posted by troublemaker View Post
What's happening on Hwy 1 between 232 and 264?
A truck climbing lane is being built. (In other words, a third lane).
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #5297  
Old Posted Aug 23, 2013, 9:08 AM
Pinion Pinion is offline
See ya down under, mates
 
Join Date: Jul 2007
Posts: 5,167
Quote:
Originally Posted by DKaz View Post
The North Van improvements will only make things safer but that bridge is still going to be a bottle neck. Look at Queensborough Bridge for example, safer on both ends but it's still a traffic nightmare.
Cassiar tunnel (four lanes) is the current bottle neck, not so much the bridge (six lanes). They are in the process of making the tunnel six lanes though so I think it'll just move the problem east unless the changes really fix the Boundary/Willingdon stretch. I dunno how you "fix" people getting in accidents every day there though.
     
     
  #5298  
Old Posted Aug 23, 2013, 4:09 PM
go_leafs_go02 go_leafs_go02 is offline
Registered User
 
Join Date: Dec 2007
Location: London, ON
Posts: 2,406
Quote:
Originally Posted by Metro-One View Post
A truck climbing lane is being built. (In other words, a third lane).
eastbound only.

westbound through there is getting pretty bad now. Seems like there is an accident daily anywhere from Glover Road to Mt. Lehman. The climbing lane will help, but still want to see highway improvements all the way to Abbotsford in the near term, and then Chilliwack in the medium term.
     
     
  #5299  
Old Posted Aug 23, 2013, 8:24 PM
Stingray2004's Avatar
Stingray2004 Stingray2004 is offline
Registered User
 
Join Date: Jan 2004
Location: White Rock, BC (Metro Vancouver)
Posts: 3,145
Here's a 6-day old pic of crews demolishing the 248th St. Bridge on Hwy 1 in Langley (which will be replaced) as part of the construction of the new EB truck climbing lane between 232nd and 264th Sts.

     
     
  #5300  
Old Posted Aug 23, 2013, 8:31 PM
go_leafs_go02 go_leafs_go02 is offline
Registered User
 
Join Date: Dec 2007
Location: London, ON
Posts: 2,406
http://www.translink.ca/en/About-Us/Media/2013/August/Carvolth-Park-and-Ride-Rate-Changes.aspx

And Carvolth starts being a pay lot as of September 2013. $2 per day or $40 per month.

As mentioned before, the lot is pretty much 100% full already. Huge success so far.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:05 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.