Old Posted Aug 9, 2013, 7:40 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by cllew View Post
First I heard of the foundation problems at the river crossing, I guess even before Calgary's bridge failure, back then CP did not want to spend money to fix foundation problems on river crossings.

The story that is commonly told is CP closed the line down to to lack of rail traffic due to the Panama Canal opening, it was cheaper to ship by boat from coast to coast then use rail.

I wonder if they had kept the line in use, would the North Transcona yard have become the CP Winnipeg Intermodial Yard, and Chief Pegius being built years earlier as a route to take all the truck traffic?
At the risk of veering off topic (but not too far since they more or less follow parallel routes) the Bergen Cutoff and North Transcona Yards are a local history topic that I'd love to see explored a little further.

After creating grandiose plans for a mammoth railyard and laying out a rail line around the city, the CPR more or less abandoned the whole thing a few years later. Why? What was the plan in the first place? Why was it abandoned? No one really seems to have any answers.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 4:00 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.