A preferred proponent has been chosen for the Design/Build/Finance/Maintain contract for the airport improvement project. The contract will be finalized over Summer 2013 and design is underway. It is anticipated that materials and equipment will be deliverd during the 2013 sealife season in preparation for a Spring/early Summer 2014 construction start. Update in Fall 2013. Pam Coulter, Director of Communication, can be reached at 867-975-6049/email:
[email protected].
The budget represents a proposed Capital Cost. Pacific Meridian Consulting are awarded the Facility Management Services. Acumen Consulting Limited is awarded as the Chief Project Officer (CPO). Arctic Infrastructure Partners: InfraRed Capital Partners Limited, Bouygues Building Canada Inc, Colas Canada Inc and Winnipeg Airports Authority. Website:
www.edt.gov.nu.ca. General info:
[email protected]. InfraRed Capital Partners Ltd phone: 1+44 (0) 20 7484 1800 or email:
[email protected].
Project: Iqaluit International Airport Improvement project. Scope of work includes construction of a new Airport Terminal Building (ATB) approx 9,000 sq metres in size to be located in Apron 1; a new Combined Services Building (CSB) approx 4,500 sq metres in size to be located between Apron 2 and Apron 3; runway, taxiway, and apron improvements and rehabilitation with a toal paved area of approx 450,000 sq metres; and improvements to airport electrical systems.
Scope: 13,500 m²; 2 storeys; 2 structures
Cost est. $300 Million