Quote:
Originally Posted by aberdeen5698
My Google earth "Path" tool measurement of the distance between the end of the Grandview on-ramp and the start of the NEW Willingdon off-ramp shows well in excess of 800 metres. You understand, don't you, that the old exit which took you direct to the southbound lane of Willingdon is now closed?
|
We're both wrong unfortunately.
Here is the current design and I measured to scale. I'm off by a few hundred, you're off by about 550.
http://www.jhausner.com/Willingdon.png
If you're curious, the green left line is the start of where you can merge in, and the second line is the end. Remember 2 lanes exit Willingdon so at the merge point you are in the far right lane, by the second green line the white dotted lines changes to a solid line because you effectively would be merging onto an exit at that stage.
Not to mention while technically possible, it is quite illegal to cross a solid white line, so effectively the stretch I mark is the legal limitation of the merging portion. Measures give or take around 340 meters. My scale me be off by a slight bit but I overlayed the image with Google Maps and used the Google Maps scale.
Either way it is a lot less than 800 meters and it is more than my 125 meter original estimate which I did roughly. I stand corrected.
That said the argument is actually secondary to my point. It just defies logic to think the cross traffic won't cause issues given while there is a slight increase in merge distance, you have 2 lanes exiting now (instead of 1) and an HOV on the left side merging in. And it is still at the very least half the distance as you see on HWY 99/91 and the on HWY 99/91 both lanes meet up at 90kph already vs Willingdon where you have cars accelerating merging from 50-60kph, and decelerating on the exit to around that too.
I stand by my opinion that it will still be a gong show.