Quote:
Originally Posted by UofC.engineer
I love the BRT projects planned for the city.
But do you think there is another project that could take as many cars off the road as the SETWAY?
I know I'm using a single metric to justify this project, but someone has to lead the vanguard in the war against cars!  I wish Rick bell would have read that.
|
Sure.
Centre Street Transitway: 2.1M increase
North Crosstown BRT: 2M increase
South Crosstown BRT: 1.7M increase
Southwest Transitway: 1.3M increase
Southeast Transitway: 1.2M increase
17th Ave SE Transitway: 500K increase
West Campus Mobility: 200K increase
Looks to me like there are four projects with higher ridership than the SE transitway, two of them with almost double the ridership.
It's also worth noting that the SETWAY has almost double the capital cost of the other projects. Not individually -- double the cost of all six of them added together.
I'm having a hard time figuring out why it isn't a slam dunk case to spend $120M to get 2.1 million more riders, or $40M to get 1.3 million more riders, rather than $642M to get 1.2 million.