Quote:
Originally Posted by aberdeen5698
I think in the long term the stretch that includes Braid and Sapperton is going to be a problem.
|
There was that SkyTrain report that suggested the Millennium Line would be pared back to just a shuttle between Columbia and Lougheed - but of course, that would require a new platform at Columbia.
Quote:
Originally Posted by Zassk
In the long term, a rebuild of Columbia seems like a necessity. A three- (or four-) platform Columbia Station would allow for lots of flexibility in the network. Translink could short-turn Expo trains at Columbia, or run Millennium Line as a "tail" off of either Expo or Evergreen lines, or run a short Millennium Line shuttle between Lougheed and Columbia.
|
It may also support a route from Coquitlam to Columbia (with a reversing change in direction at Lougheed).
The original T-Line was supposed to have Lougheed station oriented north-south with trackage configured as a "Y" opening to the south (not to the east), with the "through" routes being Coquitlam-VCC and Coquitlam-Columbia (not Coquitlam-VCC and Columbia-VCC, as-built).
That would have allowed cross-regional commutes from Coquitlam to Surrey with only 1 transfer at Columbia (however, as-built and with the proposed operating plan, it would require 2 transfers). The phasing of the T-Line, however, resulted in the Lougheed platform being oriented east-west instead of north-south.