Quote:
Originally Posted by Metro-One
The same way I feel all major developments along the Canada Line (such as the Oakridge development) should also include having the extra 10 meters station expansions completed. Sam with Marine Gateway and several Richmond projects.
|
Sorry Metro, not sure if I got it. Are you saying some stations should get that extra 10 meter platform, while construction activity permits it, and others not; at least for the moment, but presumably later? (To accomodate 3-car CLine trains of course.)
I'd love to see 3-car Canada Line trains, whenever that might be.