Posted May 5, 2013, 4:27 PM
|
|
Registered User
|
|
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,373
|
|
With the speculated Westin Hotel and the caisson testing. Are we to assume then there a no below grade floor levels, similar to Cnetrepoint? If they're pouring caisson's without any excavation. Or could the top be cut off similar to a pile?
|