Quote:
Originally Posted by cllew
Connections to the sky walk system have always been split between the two building owners and the city (1/3) each.
With the completion of the City Place-Royal Trust Tower-Delta Hotel link the city has exhausted the last of the money they had set aside for sky walk system. I was looking at the new city budget and don't see any more money allocated for future expansions.
Does this mean they don't want to see the system expand by connecting to the proposed Fortress location and/or the hotel(s) by the Convention Center? Or will they expect the new building developers to foot the full cost now of creating the links?
|
The original plan for the skywalk system was to "complete the loop" from the Convention Centre to The Bay. The final two links are from the Convention Centre west, and then to add The Bay through the parkade. Any other extensions, or arms of the system would be privately funded. A study was done a few years ago to tie in some of the buildings along Main Street, but even though it was physically possible (and difficult) the costs were prohibitive with buildings that were not designed to be tied into a pedestrian connection system, either below ground or 2nd level. FYI the Royal Trust, Delta, Convention Centre, 440,400 St. Mary buildings were all designed for a future 2nd level walkway system. Extending the system would be great for the city, but a lot of dollars will be spent on studies and planning.