Posted Apr 23, 2013, 7:49 PM
|
 |
Registered User
|
|
Join Date: Jan 2013
Location: 9th&Broadway
Posts: 248
|
|
I think your theory may have merit. I observed the soil-sampling towards the corner of the intersection. (9th and Hope) From my experience sampling is usually done months before permits are pulled, so maybe they are subdividing the project into two phases: Parking lot toward the back of the lot first, with some kind of tower to be built abutting the intersection in the future. If we're lucky, using the same design as previous renderings??
|