Originally Posted by 1ajs View Post
shame the archives have been locked down a bunch used to be able to go back and read them all
In the Thread Archive's, happened upon about 6 Winnipeg construction threads going back to about 2005
     
     
  #7422  
Old Posted Mar 3, 2013, 3:10 AM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,524
Quote:
Originally Posted by GORDBO View Post
In the Thread Archive's, happened upon about 6 Winnipeg construction threads going back to about 2005
not sure why u responded to a 2 yr old post but ok.
     
     
  #7423  
Old Posted Mar 3, 2013, 7:06 AM
GORDBO GORDBO is offline
Registered User
 
Join Date: May 2010
Location: WINNIPEG
Posts: 305
Quote:
Originally Posted by 1ajs View Post
not sure why u responded to a 2 yr old post but ok.
HAHA, just thought I'd shake things up a bit.
     
     
  #7424  
Old Posted Mar 3, 2013, 7:33 AM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,068
Quote:
Originally Posted by Boreal View Post
I keep hearing about rising costs of construction, and as someone who is outside of the construction industry, I am curious as to what more knowledgeable folks feel is possible with $10.5 million (ie. the value indicated a number of posts previous). Does it get you something similar to what the rendering depicts (ballpark-ish)?
no way a 10 storey, 88000sf building gets built for $10.5m....even if it is just a shell and the cost of the condos are added on top of that, you would be very hard pressed to build it for less than $17m.

the 40000sf of office space alone would cost $10m.

think $250 per square foot for a reasonable building.....it doesn't take much to be over $300.
     
     
  #7425  
Old Posted Mar 3, 2013, 5:34 PM
Boreal's Avatar
Boreal Boreal is offline
Registered User
 
Join Date: Sep 2006
Location: Winnipeg
Posts: 1,704
Gotcha. Thanks. I asked, as it did not think the render was possible given the valuation - but I certainly had no metric to justify the hunch. I appreciate the answer, trueviking.
     
     
  #7426  
Old Posted Mar 3, 2013, 6:55 PM
dpenner's Avatar
dpenner dpenner is offline
Registered User
 
Join Date: Feb 2011
Location: Winnipeg/Ottawa
Posts: 262
was wondering if one of you engineering folks could perhaps enlighten me on the whether or not it is possible to move a hydro substation (like the one lily and pacific ave).
__________________
“By its nature, the metropolis provides what otherwise could be given only by traveling; namely, the strange.”

"I feel like I've been living in a city with no children in it, a garden left for ruin by a millionaire inside of a private prison"
     
     
  #7427  
Old Posted Mar 3, 2013, 7:00 PM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,524
you could but its more a cost thing then anything els and why would u move something thats around 20yrs old


you should of seen it befor they burried the undergound cables... witch run under the front parking lot of sky
     
     
  #7428  
Old Posted Mar 3, 2013, 7:24 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,840
This one would be expensive to move as it is one of the 4 interconnect stations between the old Winnipeg Hydro grid and Manitoba Hydro's grid.

It receives 66KV from a Hydro Station in East Transcona via aerial towers to just north of Provencher Blvd @ Des Meurons where it changes to an underground / under the Red River service line.

There would also be all the lower voltage underground service cables that would require the roads to be ripped up and repaved as all the manholes and ducts are ripped out and rerouted to a new site.
     
     
  #7429  
Old Posted Mar 3, 2013, 9:45 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,840
Just found this which also may explain why you don't want to move a substation.

The new one being built on Burrows Ave had a budget of $28.6 million, the one on William Ave (not yet built) west of HSC is is budged for $10 million and the new Martin Ave station (in Elmwood) soon to be under construction has a projected budget of $28.2 million

The station on Burrows is replacing two smaller obsolete ones (one located other end of the Burrows lot, the other behind Cropo Funeral home) , HSC is new and Martin is replacing the old substation next to the new one.
     
     
  #7430  
Old Posted Mar 4, 2013, 3:57 AM
wags_in_the_peg's Avatar
wags_in_the_peg wags_in_the_peg is offline
Registered User
 
Join Date: Oct 2006
Location: Winnipeg, MB
Posts: 3,843
Great news, Pointe Hebert is finally becoming a reality! This is the area where Tache deadends. North St. Boiniface around the Whittier Park area. The first 13 of 33 lots are going up for sale this Spring. The 3 builders are Maric, KDR and Hearth. They are going to be tall skinny homes as they are 34 ft lots. fitst phase are facing the river

http://www.pointehebert.com/
__________________
just an ordinary Prairie Boy who loves to be in the loop on what is going on
     
     
  #7431  
Old Posted Mar 4, 2013, 4:42 AM
Shinook Shinook is offline
BANNED
 
Join Date: Jun 2012
Posts: 652
Quote:
Originally Posted by wags_in_the_peg View Post
Great news, Pointe Hebert is finally becoming a reality! This is the area where Tache deadends. North St. Boiniface around the Whittier Park area. The first 13 of 33 lots are going up for sale this Spring. The 3 builders are Maric, KDR and Hearth. They are going to be tall skinny homes as they are 34 ft lots. fitst phase are facing the river

http://www.pointehebert.com/
This area of St. Boniface is a very underutilized and underrated area of the city. The proximity to downtown, Provencher Blvd. is very appealing to me and I'm betting many other people as well. I believe that, if this development is done right, this could be the beginning of a huge catalyst of residential developments in that area. Should this occur, it's an area I would consider purchasing a home. Very happy this is occuring.
     
     
  #7432  
Old Posted Mar 4, 2013, 4:44 AM
Bluenote Bluenote is offline
BANNED
 
Join Date: Jun 2012
Location: Winnipeg / St Vital
Posts: 1,101
Quote:
Originally Posted by wags_in_the_peg View Post
Great news, Pointe Hebert is finally becoming a reality! This is the area where Tache deadends. North St. Boiniface around the Whittier Park area. The first 13 of 33 lots are going up for sale this Spring. The 3 builders are Maric, KDR and Hearth. They are going to be tall skinny homes as they are 34 ft lots. fitst phase are facing the river

http://www.pointehebert.com/
KDR is an design company, not the builders.
     
     
  #7433  
Old Posted Mar 4, 2013, 5:27 AM
viperred88's Avatar
viperred88 viperred88 is offline
visionary
 
Join Date: Mar 2006
Location: Wpg
Posts: 1,214
Just wondering why did the city planners impose height restrictions on waterfront drive but not to the new condo developments now occurring on assiniboine avenue?
__________________
'We shape our buildings and then they shape us. They capture the Zeitgeist, the spirit of their time.'
     
     
  #7434  
Old Posted Mar 4, 2013, 12:54 PM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,524
because its part if the exchange
     
     
  #7435  
Old Posted Mar 4, 2013, 3:26 PM
northern_hoser northern_hoser is offline
Registered User
 
Join Date: Oct 2012
Posts: 54
Quote:
Originally Posted by lilwayne View Post
construction season is about to begin

what projects can we expect to start going up?

canad inn mcphillips st casino?
d condos?
herritedge landing?
hsc womens hospital?
alt hotel and glass house condos?
winnipeg convention center?
human rights museum landscaping?
bond tower?
any work on fortress developments?
226 osborne st n project?
season of tuxedo phase 2 and 3?
mpi lot announcement?


the streets are looking ugly right now many need major work on them aswell.
Speaking of streets, the Plessis Underpass is going to be getting started soon. Gonna lose this route for at least a year and a half, but it will be glorious once it's completed

http://www.winnipeg.ca/publicworks/MajorProjects/plessisunderpass/
     
     
  #7436  
Old Posted Mar 4, 2013, 3:47 PM
Mininari Mininari is offline
Registered User
 
Join Date: Jul 2004
Location: Victoria (formerly Port Moody, then Winnipeg)
Posts: 2,447
Quote:
Originally Posted by northern_hoser View Post
Speaking of streets, the Plessis Underpass is going to be getting started soon. Gonna lose this route for at least a year and a half, but it will be glorious once it's completed

http://www.winnipeg.ca/publicworks/MajorProjects/plessisunderpass/
I don't drive much in this part of the city, but times I have, Plessis is well-used. What is the impact of this going to be on traffic over that time?

On another note, a couple of University-related updates:

Construction of the 5th floor of the Wallace Building (vertical expansion) has finally been completed, and my research group is in the process of moving into our new space. There is a public open house on Monday March 18th from 2:30 - 4:30, if anyone is interested in seeing the new space, and learning about Arctic research.

From my new window, I can see that a tower crane is going up for the new Active Living Centre. Wonderful day for raising a tower crane...
(also have a nice view of the stadium).
     
     
  #7437  
Old Posted Mar 4, 2013, 3:52 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,352
Quote:
Originally Posted by Bluenote View Post
KDR is an design company, not the builders.
KDR Design Builders.

Fist line on their website:
"Based out of Winnipeg, Manitoba, KDR Design Builders Inc. is a leader in custom home design and building with a focus on safety and premiere customer service."

I don't know a whole lot about home construction. Never owned a new home. Does KDR (or any other builder I guess) design homes and have a contractor build it? Or do they have their own carpenters and sub out the other work?
     
     
  #7438  
Old Posted Mar 4, 2013, 4:00 PM
northern_hoser northern_hoser is offline
Registered User
 
Join Date: Oct 2012
Posts: 54
Quote:
Originally Posted by Mininari View Post
I don't drive much in this part of the city, but times I have, Plessis is well-used. What is the impact of this going to be on traffic over that time?
I use that route to get to work every morning and occasionaly on the way home. On the weekends, I'm probably using it at least three times. I think it's going to be a bit of a nightmare. Pandora and Regent are going to see a lot more traffic and I think it could add a good 10-15 minutes to my drive in the morning. What I don't understand is why there isn't a shoofly set up for traffic similar to what they did on Route 90 when the underpass was built at Wilkes. There are a bunch of utilities in the area and that may be one reason.
     
     
  #7439  
Old Posted Mar 4, 2013, 4:27 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,352
Quote:
Originally Posted by northern_hoser View Post
I use that route to get to work every morning and occasionaly on the way home. On the weekends, I'm probably using it at least three times. I think it's going to be a bit of a nightmare. Pandora and Regent are going to see a lot more traffic and I think it could add a good 10-15 minutes to my drive in the morning. What I don't understand is why there isn't a shoofly set up for traffic similar to what they did on Route 90 when the underpass was built at Wilkes. There are a bunch of utilities in the area and that may be one reason.
The timeline is the main issue. This projects needs to be complete by fall 2014. To meet that dreadline, no that's not a misprint, the closure was needed. Traffic staging, working around the shoofly, etc would cause too many delays.
     
     
  #7440  
Old Posted Mar 4, 2013, 5:03 PM
rypinion's Avatar
rypinion rypinion is offline
Registered User
 
Join Date: Jul 2007
Location: East Exchange, Winnipeg
Posts: 1,396
Northeast Pacific at Lily is being demolished, anyone know what's up there?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 10:44 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.