Old Posted Jan 9, 2013, 7:50 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,124
Quote:
Originally Posted by SpongeG View Post
she lived nowhere near the tunnel portal she was probably halfway between the two portals, I just think she was unhappy skytrain would be in her area

but i agree i feel sorry for people stuck next to the portals, especially those whose backyards back onto it
That's ok she'll be unhappy until 5 years later when her place has increased in value. That's what happens everywhere. People complain then 5 years after it is built their place goes up by $100,000 and they go "yippy". Well until they see their property tax bill I guess but even then more equity is good.
     
     
  #5102  
Old Posted Jan 9, 2013, 8:55 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,799
Quote:
Originally Posted by jhausner View Post
That's ok she'll be unhappy until 5 years later when her place has increased in value. That's what happens everywhere. People complain then 5 years after it is built their place goes up by $100,000 and they go "yippy". Well until they see their property tax bill I guess but even then more equity is good.
Yeah the property tax is a problem. Your share of city tax revenue goes up when your house appreciates in value more than that of the average house in the city, and that's exactly what happens to housing near a Skytrain station.

My house is about a 20-minute walk from the Expo Line, which is perfect for me. It's too far away to really impact property prices, but I have no problem walking that distance. And on really crummy days I have two different bus routes I can choose from to get me to or from a Skytrain station.
     
     
  #5103  
Old Posted Jan 11, 2013, 3:59 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,102
I saw they set up a huge board outside the project office, and also built the support for two more at the site of Lincoln and Ioco station... Maybe something coming up soon?
     
     
  #5104  
Old Posted Jan 11, 2013, 4:31 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Hopefully the contract has been signed and they are getting the 'Your tax dollars at work" type signs ready to announce major construction.
     
     
  #5105  
Old Posted Jan 11, 2013, 6:38 AM
Spork's Avatar
Spork Spork is offline
Shoebox Dweller
 
Join Date: Sep 2008
Location: Vancouver
Posts: 1,784
Project controller has been hired in the past couple of weeks. Something is coming.
     
     
  #5106  
Old Posted Jan 11, 2013, 3:23 PM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
There are a few project signs around here and there.. the one at the office is covered up and has a small platform underneath it, perfect size for a small media event..
     
     
  #5107  
Old Posted Jan 11, 2013, 5:44 PM
Mininari Mininari is offline
Registered User
 
Join Date: Jul 2004
Location: Victoria (formerly Port Moody, then Winnipeg)
Posts: 2,447
Quote:
Originally Posted by GeeCee View Post
There are a few project signs around here and there.. the one at the office is covered up and has a small platform underneath it, perfect size for a small media event..
Or a pre-election photo op... I think we're going to have wait a couple more months before its 'official.'
     
     
  #5108  
Old Posted Jan 11, 2013, 11:24 PM
queetz@home's Avatar
queetz@home queetz@home is offline
Go Rotem! Die Bombardier!
 
Join Date: Jul 2001
Location: Ortigas
Posts: 3,679
Quote:
Originally Posted by Mininari View Post
Or a pre-election photo op... I think we're going to have wait a couple more months before its 'official.'
The funny thing is James Moore and Mary Polak were suppose to give an Evergreen Line update news release on December 19.

http://www.cbc.ca/news/politics/inside-p...ng-some-news-for-today-jason-kenney.html

Quote:
On the west coast, James Moore joins BC Transport Minister Mary Polak for a "special announcement" on the "highly anticipated Evergreen Line rapid transit project" in Coquitlam
This news release was cancelled due to that "snow storm"....you know...the same one with the Port Mann ice bombs. We never heard from them since with regards to the Evergreen Line so I guess we will never know what they were going to say. I'm guessing, whatever it was, its probably not important...
     
     
  #5109  
Old Posted Jan 12, 2013, 1:57 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,766
Probably difficult to reschedule a news conference over the holidays, plus Moore probably has to fly out from Ottawa - so hard to find an opening..
     
     
  #5110  
Old Posted Jan 24, 2013, 1:38 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
So I've found some interesting info regarding the Evergreen Line and its bored tunnel.
The original pre-2008 LRT proposal specified the requirement of a 5.7m diameter tunnel boring machine. [LINK]

This surprises me as it is actually narrower than the 6.1m machine used for the Canada Line [LINK], despite the overhead needed for the electric supply/pantograph.

What it does tell me however is that the tunnels for the ongoing SkyTrain proposal are going to be even narrower than 5.7m (hint hint: key in determining the tunnel width for Broadway subway). I might ask the Evergreen Line office about this, but I doubt they have the info yet as the primary contractor was only recently announced and I'm not sure if the TBM has been purchased yet.
     
     
  #5111  
Old Posted Jan 24, 2013, 2:13 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,799
Quote:
Originally Posted by xd_1771 View Post
This surprises me as it is actually narrower than the 6.1m machine used for the Canada Line [LINK], despite the overhead needed for the electric supply/pantograph.
Am I missing something? What pantograph?
     
     
  #5112  
Old Posted Jan 24, 2013, 2:21 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,102
I doubt the 2007 proposal specified anything.. they were still in the design stage before the project was cancelled.

The Eglinton LRT in Toronto actually uses a TBM with 6.7M diameter...
     
     
  #5113  
Old Posted Jan 24, 2013, 2:55 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,766
Quote:
Originally Posted by aberdeen5698 View Post
Am I missing something? What pantograph?
"Pre-2008 LRT proposal..."
     
     
  #5114  
Old Posted Jan 24, 2013, 3:09 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
Quote:
Originally Posted by aberdeen5698 View Post
Am I missing something? What pantograph?
Referring to the pantograph required for overhead-wire LRT for the previous Evergreen Line proposal

This is random... but while I'm at it searching for statistics, does anyone know where I may obtain access to the 2010 Canadian Public Transit Fact Book? (published by the CUTA)
It is so hard to find T_T
     
     
  #5115  
Old Posted Jan 24, 2013, 3:39 AM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
The SkyTrain cars are smaller in cross-section, yes, so perhaps the tunnel can be narrower... but is there really much savings in a difference of 1m or less diameter on a tunnel boring machine? Surely the main cost is in the distance travelled, which would dictate the amount of upkeep/maintenance required the unit.
     
     
  #5116  
Old Posted Jan 24, 2013, 3:59 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
Price of TBM, amount of land extracted.... there can be a decent savings from minimal TBM diameter.

SkyTrain cars are smaller in width and height thanks to the LIM (LIM brings the train body closer to the ground). This is precisely why LIMs were studied and used for a similar application in Osaka, Japan about the same time the SkyTrain first opened.

Regardless of train width and vehicle height, LRT in a tunnel should usually require much larger tunnels because of the need to accommodate for significant additional overhead for the power delivery (pantograph, wires) compared to a rotary motor metro or linear motor metro with third rail power. This is illustrated well in the Eglinton LRT proposal: a massive 6.5m diameter for each tunnel.

I now realize that the 5.7 value dictated in the Hatch Mott McDonald PDF for the tunnel is pertaining to tunnel size, not necessarily tunnel boring machine size (which might be somewhat bigger) - but that still puts the TBM size at smaller than the one used for Canada Line (considering that on Eglinton LRT, 6.7m TBM is to 6.5m tunnel... therefore I think it's fair to assume that 5.9m TBM is to 5.7m tunnel). I guess the Evergreen Line cars were slated to be very small to help bring the costs down or something? Perhaps it was to use 2.4m LRV offerings (vs 2.65m ART, 3.2m Rotem EMU), but I don't think that addresses the height disrepancy.
     
     
  #5117  
Old Posted Jan 24, 2013, 4:27 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,799
Quote:
Originally Posted by officedweller View Post
"Pre-2008 LRT proposal..."
Ah, of course - thanks!
     
     
  #5118  
Old Posted Jan 24, 2013, 4:33 PM
Mininari Mininari is offline
Registered User
 
Join Date: Jul 2004
Location: Victoria (formerly Port Moody, then Winnipeg)
Posts: 2,447
Quote:
Originally Posted by officedweller View Post
Probably difficult to reschedule a news conference over the holidays, plus Moore probably has to fly out from Ottawa - so hard to find an opening..
Well, its been one month so far. February would be opportune, since they're not actually allowed to announce such things DURING the election campaign (or are they?).

The big EVERGREEN LINE PROJECT signs, and crews not-quite-yet making commuter life hell should be enough to remind people the liberals are building the line.

Last edited by Mininari; Jan 24, 2013 at 5:18 PM.
     
     
  #5119  
Old Posted Jan 25, 2013, 6:15 AM
KPELLY KPELLY is offline
Registered User
 
Join Date: Sep 2008
Location: North Vancouver
Posts: 159
From what I've heard SNC-Lavalin is actually going with a large diameter single tunnel for the Evergreen Line instead of side by side tunnels. The reason being time savings over having to launch the TBM twice, and cost savings over renting/shipping/assembling 2 TBMs. Likely the TBM will be launched from the Port Moody side because going uphill allows water to run out of the tunnel naturally avoiding any need to pump.
     
     
  #5120  
Old Posted Jan 25, 2013, 6:22 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394
can I get a GO CHRISTY GO!!!!!
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:22 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.