HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #4981  
Old Posted Nov 29, 2012, 3:46 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,022
Quote:
Originally Posted by WarrenC12 View Post
Those comments make my head hurt.
I can't read those pro-LRT Broadway opinion pieces and comments anymore, they make me far too frustrated, which then makes me angry, and i am trying to be a happier person, haha!
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #4982  
Old Posted Nov 29, 2012, 4:12 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,103
Even the article make my head hurt...

The professor doesn't seems to be able to distinguish between Tram and LRT, or "peak hour capacity" with "crush load"...

The consultation material state an end-to-end travel time of 28min for LRT. Add in 5min each end for layover and recovery, you'll need 22 active trains to run the line every 3min. Assume 3-car trains a 16% spare, 77 cars are needed. With each one cost at least 4M, the minimum* cost for the train alone would be about 26M/km. Just how are they going build the system with only 22M~42M/km shown on that table?

One of the reason that the cost for Vancouver's system is more expensive because it includes everything from consultation, design, train, land, construction, to testing and commission. Many other system report only construction, testing and commission as the project cost.

Anyways... I don't even want to comment on rest of the stuff....

* = Toronto's LRV cost 6M a piece. Using this number will bring the cost of trains to 39M/km.
     
     
  #4983  
Old Posted Nov 29, 2012, 4:20 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by mr.x View Post
I'm gonna say this thing will cost $3.2-billion from VCC-Clarke to UBC, and that's the cost of doing it right and not cutting corners in design...the $1.5-billion and $2.8-billion figures from the City seem a bit low, especially considering construction wouldn't theoretically begin for another 3-4 years earliest.
- $1.8-billion from VCC-Clarke to Arbutus
- $1.4-billion from Arbutus to UBC

Contribution breakdown:
- Feds: $800-million
- Province: $1-billion
- Translink: $1-billion
- City of Vancouver: $200-million
- UBC: $200-million (how likely? lol)
Musqueam: How much would they pay to have a station at their new development beside the UBC Golf course?
     
     
  #4984  
Old Posted Nov 29, 2012, 4:27 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by mr.x View Post
I don't think the Musqueam have plans to build 8,000-12,000 housing units. It's a pretty small site, at 22 acres. From what I've heard, their plans is to build enough housing for 3,000-5,000 people...which is similar to the size of the Oakridge development's condo aspect in its 28 acres.
I was told 8,000-12,000 units which I took to mean 'condo units'.
Perhaps the birdie was including hotel rooms in the 'units' figure, but I can't see them building a massive hotel there unless they are also thinking of building a convention facility as part of the complex.
Or a casino?
     
     
  #4985  
Old Posted Nov 29, 2012, 4:33 AM
Porfiry Porfiry is offline
Registered User
 
Join Date: May 2010
Posts: 802
Quote:
Originally Posted by Metro-One View Post
I can't read those pro-LRT Broadway opinion pieces and comments anymore, they make me far too frustrated, which then makes me angry, and i am trying to be a happier person, haha!
I like the comment Jerry Dobrovolny made about the impact of rebuilding the entire streetscape of Broadway to make way for an LRT:

"It’s the cut-and-cover without the cover."
     
     
  #4986  
Old Posted Nov 29, 2012, 4:37 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by jsbertram View Post
Musqueam: How much would they pay to have a station at their new development beside the UBC Golf course?
No idea, but I'd like to think they would be able to afford $30-50-million. That's what an underground station would cost.


Quote:
I was told 8,000-12,000 units which I took to mean 'condo units'.
Perhaps the birdie was including hotel rooms in the 'units' figure, but I can't see them building a massive hotel there unless they are also thinking of building a convention facility as part of the complex.
Or a casino?
Somehow I don't think it's 8,000-12,000 units....and definitely not a casino. The planned hotel by the Musqueam has been announced as 120 guestrooms in size. In comparison, the Sheraton Wall Centre - the largest in the city - has 733 guestrooms.
     
     
  #4987  
Old Posted Nov 29, 2012, 4:52 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by trofirhen View Post


If that is the case, what would the maximum train length on the Broadway line be? How many cars? Four?
Since this would be built as an western extension of the Millennium line, using 80 M platforms (as already exist on the M-Line stations) would let a 6-car Mark I or 4-car Mark II train to use the full platform.

Remember too, the eastern extension from Lougheed Station to PoCo is in the early construction stages (as the Evergreen Line) , and will also have (at minimum) 80M platforms.

By the time the Extension to UBC opens, 100M or 120M platforms may be needed, but before then Translink will try to accommodate the increasing rush-hour ridership by purchasing more cars so they can run full length (80 M) trains, and run these full length trains closer together.


Right now during rush hour, Translink is running a mix of 2-car, 4-car and 6-car Mark I trains and 2-car and 4-car Mark II trains. At the peak of rush hour, it's frustrating not knowing where the first door of the train will be, so everyone crowds in the middle of the platform to ensure they get on even if its a 2-car Mark I that arrives.

If every train was 80 M (the length of the platform) during rush hour, people could spread out along the platform, but that means more cars are making up fewer trains - resulting in fewer 'trains per hour' going through a station even if it is the same number of cars per hour passing through.
     
     
  #4988  
Old Posted Nov 29, 2012, 5:16 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
So now we know the City of Vancouver prefers underground Skytrain to UBC.

Does anyone know when the Translink "UBC Line Rapid Transit Study" will be released?
They've been working on this since early 2009, and it was supposed to be available "Fall 2012"

A Phase II report I saw earlier this year had rejected the other alternatives leaving SkyTrain underground to UBC as their preferred choice. Having a western terminus at Arbutus (with B-Line running from Arbutus to UBC) was an option to lower costs.
     
     
  #4989  
Old Posted Nov 29, 2012, 5:19 AM
amor de cosmos amor de cosmos is offline
BANNED
 
Join Date: Jun 2005
Location: lodged against an abutment
Posts: 6,750
I remember a stat saying the canada line can move as many people as a 10-lane highway (something like that). does anyone have any idea what the number would be for this new extension to ubc?
     
     
  #4990  
Old Posted Nov 29, 2012, 5:25 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by amor de cosmos View Post
I remember a stat saying the canada line can move as many people as a 10-lane highway (something like that). does anyone have any idea what the number would be for this new extension to ubc?
Since it would merely be a seamless continuation of the Millennium Line, which was advertised as 20-lanes back in its day, it would be the same for Broadway...20 lanes.
     
     
  #4991  
Old Posted Nov 29, 2012, 5:54 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
Metro-One... I agree. Those comments are just intolerable at times...

If the LRT fans are so desperate, they should be pleased that they already have a city (Surrey) who's willing to try it out. But the Broadway corridor should really be left alone from further alterations on the surface aka Cambie corridor.

In some ways, I have to wonder if this is an actual concerted attempt at a money grab from the government given the liability issues that the Canada Line builders had to deal with when they cut off business to Cambie corridor merchants...
     
     
  #4992  
Old Posted Nov 29, 2012, 6:38 AM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,123
You have to understand who the listeners of NW980 generally are. They're not generally the ones who will use the system.
     
     
  #4993  
Old Posted Nov 29, 2012, 6:45 AM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,179
Quote:
Originally Posted by jsbertram View Post
By the time the Extension to UBC opens, 100M or 120M platforms may be needed, but before then Translink will try to accommodate the increasing rush-hour ridership by purchasing more cars so they can run full length (80 M) trains, and run these full length trains closer together.
Translink has forecast that Skytrain can handle peak hour demand for the Expo Line up until at least 2041, using 80m platforms. Peak demand for Central Broadway should be much lower than DT, so I would think that 80m platforms should be adequate for Central Broadway for many decades to come.

There's some good information from the Expo Line Upgrade Strategy document. The ultimate capacity of Skytrain is 25 700 pphpd, based on 93 second headways. At 75 second headways, that figure jumps to 31 000 passengers per hour.

Quote:
The existing system was designed to handle a full MKI, 6 vehicles per train fleet operating at recovery headway of 75 seconds. A 6 vehicle MKI train has a length of 76.2 metres. The system’s headway is constrained primarily by the Waterfront Station terminus reversal, and no other major issues were identified relating to trackwork in relation to capacity.
http://www.translink.ca/~/media/document...e%20strategy%20%20project%20summary.ashx

Last edited by logan5; Nov 29, 2012 at 7:08 AM.
     
     
  #4994  
Old Posted Nov 29, 2012, 7:38 AM
Meraki Meraki is offline
Registered User
 
Join Date: Mar 2012
Posts: 473
Quote:
Originally Posted by jsbertram View Post
Right now during rush hour, Translink is running a mix of 2-car, 4-car and 6-car Mark I trains and 2-car and 4-car Mark II trains.
Uh, no.

There are no 2 car Mk-I trains in service, there has never been since the opening of the line. 2 car Mk-IIs were eliminated a while ago as well.

Currently normal service runs 4-car Mk-I, 6-car Mk-I and 4-car Mk-II.

Once the Evergreen line is completed, 2-car Mk-II will run at double frequency (every 3 minutes) between Douglas and VCC-Clark.
     
     
  #4995  
Old Posted Nov 29, 2012, 12:17 PM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,055
Quote:
Originally Posted by Meraki View Post
Once the Evergreen line is completed, 2-car Mk-II will run at double frequency (every 3 minutes) between Douglas and VCC-Clark.


will there still be 4-car Mk-II trains between Lougheed and VCC-Clark, or will it all become two-car trains at double frequency?
     
     
  #4996  
Old Posted Nov 29, 2012, 5:46 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Interesting statement about Waterfront reversal being the limiting factor to capacity. I wonder if anything can be done about that.
     
     
  #4997  
Old Posted Nov 29, 2012, 5:59 PM
Spork's Avatar
Spork Spork is offline
Shoebox Dweller
 
Join Date: Sep 2008
Location: Vancouver
Posts: 1,784
There appears to be space to set up some sort of alternative configuration with a third tail track, or extend the tracks about one car length.
     
     
  #4998  
Old Posted Nov 29, 2012, 6:28 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,103
Quote:
Originally Posted by Zassk View Post
Interesting statement about Waterfront reversal being the limiting factor to capacity. I wonder if anything can be done about that.
1. Improve signalling and train control software
2. Extend the line toward Hastings and short-turn every second train at Waterfront (with a pocket track)
3. Extend the line (North Shore or West End from Burrard?) and create a split like the one in Bridgeport and Columbia, with alternate trains going toward each branch
4. Extend the line and create a loop so train don't need to turn around

One of the report clearly stated that they're going to do #1 and squeeze a few more seconds out of the system.

If any of 2-4 is done, then the new limiting factor would probably be King George or Commercial-Broadway...
     
     
  #4999  
Old Posted Nov 29, 2012, 7:06 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,209
Quote:
Originally Posted by nname View Post
1. Improve signalling and train control software
2. Extend the line toward Hastings and short-turn every second train at Waterfront (with a pocket track)
3. Extend the line (North Shore or West End from Burrard?) and create a split like the one in Bridgeport and Columbia, with alternate trains going toward each branch
4. Extend the line and create a loop so train don't need to turn around

One of the report clearly stated that they're going to do #1 and squeeze a few more seconds out of the system.

If any of 2-4 is done, then the new limiting factor would probably be King George or Commercial-Broadway...
Is there a stated hypothetical limit to what the headway can be after these improvements are built?
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #5000  
Old Posted Nov 29, 2012, 8:29 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Always count on the Georgia Straight to publish something "against the man"....they have a anti-Broadway SkyTrain/pro-LRT article and a big part of it is on Burnaby Mayor Derek Corrigan's views: http://www.straight.com/article-844381/vancouver/burnaby-mayor-slams-broadway-line-talk

Obviously, he's against it...who didn't see that one coming?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:33 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.