Quote:
Originally Posted by trofirhen
If that is the case, what would the maximum train length on the Broadway line be? How many cars? Four?
|
Since this would be built as an western extension of the Millennium line, using 80 M platforms (as already exist on the M-Line stations) would let a 6-car Mark I or 4-car Mark II train to use the full platform.
Remember too, the eastern extension from Lougheed Station to PoCo is in the early construction stages (as the Evergreen Line) , and will also have (at minimum) 80M platforms.
By the time the Extension to UBC opens, 100M or 120M platforms may be needed, but before then Translink will try to accommodate the increasing rush-hour ridership by purchasing more cars so they can run full length (80 M) trains, and run these full length trains closer together.
Right now during rush hour, Translink is running a mix of 2-car, 4-car and 6-car Mark I trains and 2-car and 4-car Mark II trains. At the peak of rush hour, it's frustrating not knowing where the first door of the train will be, so everyone crowds in the middle of the platform to ensure they get on even if its a 2-car Mark I that arrives.
If every train was 80 M (the length of the platform) during rush hour, people could spread out along the platform, but that means more cars are making up fewer trains - resulting in fewer 'trains per hour' going through a station even if it is the same number of cars per hour passing through.