HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #10181  
Old Posted Nov 18, 2012, 7:36 PM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
Well... seems like I'm going to have to coordinate my schedule better with transit if this happens... I'm right in the area that would be affected by the 22 service cuts in the AM peak. lol.

Besides that, a lot of the changes do seem to make sense... especially the ones on simplifying routing and such. The service and route cuts, on the other hand... I'll leave those up for debate.
     
     
  #10182  
Old Posted Nov 18, 2012, 8:36 PM
Langdon0630 Langdon0630 is offline
Registered User
 
Join Date: Dec 2009
Posts: 14
I wonder why C23 doesn't terminate at VCC-Clark? Why Glen Drive? I Know service to VCC-Clark will increase a lot of service hours, but a SkyTrain station will definitely bring more people than Home Depot.
     
     
  #10183  
Old Posted Nov 18, 2012, 9:44 PM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
Quote:
Originally Posted by Langdon0630 View Post
I wonder why C23 doesn't terminate at VCC-Clark? Why Glen Drive? I Know service to VCC-Clark will increase a lot of service hours, but a SkyTrain station will definitely bring more people than Home Depot.
Actually, that's not too bad of an idea... there's nothing stopping the shuttle from doing turns on Clark Drive at First Ave and Great Northern Way.

Perhaps a more fanatical idea would be to bring it to Commercial-Broadway Station via First Ave, Victoria, 10th, Commercial, Broadway and return.
     
     
  #10184  
Old Posted Nov 22, 2012, 3:11 AM
Robert in Calgary Robert in Calgary is offline
Registered User
 
Join Date: Jul 2010
Posts: 86
A preview ride on Calgary's West LRT.

West LRT has a bit of everything – featuring a minimal number of level crossings, it’s elevated, underground and open trench.

http://youtu.be/jGhOd6SMp4M
     
     
  #10185  
Old Posted Nov 22, 2012, 5:47 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,407
That's one LRT line properly built! And those stations are looong! I wonder how much it cost to build?
     
     
  #10186  
Old Posted Nov 22, 2012, 5:51 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,088
Quote:
Originally Posted by Klazu View Post
That's one LRT line properly built! And those stations are looong! I wonder how much it cost to build?
1.46 billions.
     
     
  #10187  
Old Posted Nov 22, 2012, 5:58 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ Impressive, although driven LRT systems naturally do need long platforms. Whereas, here in Vancouver, whoever rubber stamped the idea of 40-metre platforms for the Canada Line...yes, it's automated, but still......

Last edited by mr.x; Nov 22, 2012 at 6:20 AM.
     
     
  #10188  
Old Posted Nov 22, 2012, 6:07 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,979
I will still take the Canada Line over Calgary's new LRT. This is a nice addition to the C-Train though. I am just too big a fan of grade separation and automation though.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #10189  
Old Posted Nov 22, 2012, 6:17 AM
go_leafs_go02 go_leafs_go02 is offline
Registered User
 
Join Date: Dec 2007
Location: London, ON
Posts: 2,406
http://www.surreyleader.com/news/180403781.html

News article on the fact the Port Mann Rapid Bus does not have a Surrey stop on launch day...
     
     
  #10190  
Old Posted Nov 22, 2012, 6:22 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by Metro-One View Post
I will still take the Canada Line over Calgary's new LRT. This is a nice addition to the C-Train though. I am just too big a fan of grade separation and automation though.
Side note, the trench part of the Calgary C-Train video is basically what the Bombardier bid had proposed for the Canada Line along the Cambie section where there was a median.
     
     
  #10191  
Old Posted Nov 22, 2012, 6:45 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,979
Quote:
Originally Posted by go_leafs_go02 View Post
http://www.surreyleader.com/news/180403781.html

News article on the fact the Port Mann Rapid Bus does not have a Surrey stop on launch day...
The comments are the funniest, they are all blaming Translink when the article itself states that it was the provinces responsibility to build the exchange at 156 (but didn't) and that it was tied to some private project that never happened. It is only Translink's responsibility to operate the buses. i just find it funny, everyone goes for the quick an easy scape goat.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #10192  
Old Posted Nov 22, 2012, 6:46 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,088
Quote:
Originally Posted by go_leafs_go02 View Post
http://www.surreyleader.com/news/180403781.html

News article on the fact the Port Mann Rapid Bus does not have a Surrey stop on launch day...
Long story short -

Province: We put that on the map but never budget for it, as we expect TransLink to pick up the slack. So its their fault, not us.
TransLink: We tried to clean up province's mess, but we cannot make an agreement with a developer to fund the project.
Developer: Blame the economy, not us.
TransLink: We've already talked to the municipalities about this so they should already know.
Surrey: I've never heard of it.
Langley: I know this for quite some time, but I'm too afraid to tell Surrey as they may drop their support if they know beforehand.
Surrey: Can we put a temporary stop?
TransLink: We can't. Its province's fault for building the off-ramp too narrow.
Langley: Sorry about it, we'll see if a stop can be added later.
Surrey: ......
     
     
  #10193  
Old Posted Nov 22, 2012, 6:47 AM
go_leafs_go02 go_leafs_go02 is offline
Registered User
 
Join Date: Dec 2007
Location: London, ON
Posts: 2,406
As a note, the 509 between Surrey Central and Langley Centre will run pretty much non-stop between Surrey Central and Carvolth, and will use the ramps from Highway 1 to 156 Street where it will connect onto 104 Avenue.
     
     
  #10194  
Old Posted Nov 22, 2012, 7:07 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,088
Quote:
Originally Posted by Metro-One View Post
The comments are the funniest, they are all blaming Translink when the article itself states that it was the provinces responsibility to build the exchange at 156 (but didn't) and that it was tied to some private project that never happened. It is only Translink's responsibility to operate the buses. i just find it funny, everyone goes for the quick an easy scape goat.
Isn't it always like that?

No matter what they or other people do, its always their fault!
     
     
  #10195  
Old Posted Nov 22, 2012, 7:12 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Adorable yet morbid PSA animated music video by the Melbourne Metro on train safety, called "Dumb Ways To Die."

Video Link



It's incredibly well done...Translink would never be able to afford to do something like this lol, not that we'd need one. Melbourne has one of the world's largest LRT networks.
     
     
  #10196  
Old Posted Nov 22, 2012, 7:18 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,979
Also you know how much Aussies like a thrill...
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #10197  
Old Posted Nov 22, 2012, 7:18 AM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
Quote:
Originally Posted by nname View Post
But the problem is still... what about the people who want to go from Coquitlam Station to the United Blvd area? They didn't even mention this in the trade-off section...

And if you look at the document, the hours for 159 stay essentially the same, the "more frequent" is actually just 1 more bus in the evening hours to match the 177 frequency.
Really? It looked like it started 1 hours earlier (5am) good for warehouse shifts in the United Blvd. area that start at 6am. And it runs later as well. Maybe I read that wrong.

I agree that it's a pretty big decrease in service. I don't know what the timings will be like, but would a faster bus directly down Lougheed to Braid and a transfer to the rerouted #159 take significantly more time?

I know it will be longer and a 1-seat ride will be lost, mind you.

I wonder what the ridership is like from Coquitlam to the United Blvd. area?

Actually, when the Evergreen line opens up, it won't even help that much... as you'll still have to transfer at Lougheed and at Braid... kind of a hassle.

Hmmmm...
     
     
  #10198  
Old Posted Nov 22, 2012, 7:23 AM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
Quote:
Originally Posted by nname View Post
1.46 billions.
I assume that's not for just the 6 stops in the video is it? We always hear about how "cheap" LRT is... but that's not a great deal less expensive than the Canada Line.

As for the trench, as a rider I LIKE IT much more than a tunnel!
     
     
  #10199  
Old Posted Nov 22, 2012, 8:57 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,088
Quote:
Originally Posted by twoNeurons View Post
Really? It looked like it started 1 hours earlier (5am) good for warehouse shifts in the United Blvd. area that start at 6am. And it runs later as well. Maybe I read that wrong.

I agree that it's a pretty big decrease in service. I don't know what the timings will be like, but would a faster bus directly down Lougheed to Braid and a transfer to the rerouted #159 take significantly more time?
Comparison of peak hour trip time from Coquitlam Station to Planet Ice:

Currently with 177: 17 minutes
Est. time via Port Coquitlam (160->159): 51 minutes (13 minutes same-stop transfer)
Est. time via Maillardville (169->177): 46 minutes (15 minutes cross-street transfer)
Est. time via 152 and walk 2.2km: 40 minutes

Even if they adjust the transfer to make it as tight as possible, the quickest alternative is still about double the current trip time and maybe only 5 minutes faster than the walking option.

And then there are other trips like Coquitlam Stn - Boulevard Casino, or Mary Hill - Silver City (Schoolhouse) that face similar increase in travel time like this.

I did talk to the planners during the open house today about this, and it does make me feel like they've overlooked this connectivity issue. How they came up with the change is something similar to..
Lougheed (159) - low demand
United (177) - high demand
Riverview (177) - low demand
Mary Hill (159) - high demand

And the decision would be dropping both low demand portions, connect the two high demand portions together, and inadvertently created this ~8km long transit barrier on Hwy 1/Coquitlam River between Dewdney Trunk Road and King Edward St. Now that I mentioned it, seems like I got at least one planner thinking about this...

I don't know, maybe I'm just worried too much, as these changes would not affect my commute. But I just can't imagine there's no one work at the United Blvd area and live in Coquitlam while there is high demand from SkyTrain (other regions). Anyways, at leave I've done my part, so lets see what they come up with...

PS. The additional stop for 169 mentioned would be at Colony Farm.
     
     
  #10200  
Old Posted Nov 22, 2012, 9:03 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,088
Quote:
Originally Posted by twoNeurons View Post
I assume that's not for just the 6 stops in the video is it? We always hear about how "cheap" LRT is... but that's not a great deal less expensive than the Canada Line.

As for the trench, as a rider I LIKE IT much more than a tunnel!
For the entire 8km line and all construction work associated with them.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:07 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.