Quote:
Originally Posted by GeeCee
There is no room for a counterflow lane - if they do implement a counterflow system, it would reduce the bridge to three lanes total since the needed seismic upgrades would reduce the width available.
|
I believe that you misunderstood my point. The existing narrow 4-lane cross-section would be reduced to a wider 3-lane cross-section with the centre-lane acting as the counterflow lane.
Think Lions Gate Bridge/Stanley Park Causeway.
Again, this likely option will need to be revisited within 15 years with another 6-lane replacement. At the end of the day, it will be all about short-term politics. It is what it is unfortunately. I've seen this movie played out several times before.
In that vein, former moderate NDP premier Mike Harcourt's then Transportation minister Art Charbonneau from Hansard, Tuesday, June 15, 1993:
Quote:
[Volume 11, Number 4, Page 7211]
[NDP MoTH Minister] Hon. A. Charbonneau: The member has really hit the goldmine on this one. The congestion, the safety aspects and the delays coming out of the northeast suburbs onto the Trans-Canada are severe, and part of that is the connection from the Mary Hill bypass onto 401.
There is no band-aid solution possible. The 401 should be expanded to six lanes plus two HOV lanes, and we need to twin the Port Mann Bridge. The Cape Horn interchange needs to be reworked in order to facilitate that and the more direct connections onto the Mary Hill bypass.
|
Of course, a good chunk of the NDP hard-core enviro base eventually balked at this proposition and we wound up with a Hwy 1 HOV lane and PMB seismic upgrades as well as an EB PMB HOV lane completed in early 2001.
6 years later the funds expended were obviously redundant as the new PMB/Hwy 1 Project came to fruition.