HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Business, Politics & the Economy


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Sep 13, 2012, 6:32 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Depends how you look at it, with the grade diffrence all over the place and the Mackenzie King Bridge, it gets kind of confusing.

I might be wrong, but Sears lower level is below the Mackenzie King bridge (at grade with Daily and Nicholas no man lands and the first level of the OCC), the second level is the bridge, to be taken over by Nordstrom which is connected to the mall in two places and the third level, also to become Nordstrom, connected to the mall on the north side.

That bottom level is not directly connected to the mall. But there is a poorly used tunnel to the DND and east bound bus platform as well as an escalator to the MK level ( connecting the tunnel).
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Business, Politics & the Economy
Forum Jump



Forum Jump


All times are GMT. The time now is 9:30 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.