1). The first concept is a better integration to chinatown, but it still has a divissional vibe to north/south access.

2). I respect their concept of a bridge/chinese gate-that shows class from our city's perspective; but, the bridge is a fail for it still divides chinatown to downtown.


Here is what my perspective see's...a bridge is needed there as once the RAM is built, this bridge will abate pedestrian traffic at the corner of 97-104ave... I take the first concept but modify it so it is not a carbon copy of the soon to be Walterdale Bridge. How?
a). First, the elevation from the two ends of the bridge should be raised another 1.5m.
b). The platform of the bridge should, somewhat, parallel the suppporting arch. Historical Asian bridges were done that way...
c). Take the one roof of the two bagodas and apply that right at the precipice point- so that would be the peak of where the biker is.
d). The top handrail from the sidewalk should continue above the support arch and meet but not connected to the bagoda roof- the handrail above that arch should also mimmick the dragon movement.

With the raised elevation and the arch or the bridge platform, chinatown is now vissible and connected to downtown- one fluid street.
     
     
  #4362  
Old Posted Sep 8, 2012, 12:49 PM
Shodan's Avatar
Shodan Shodan is offline
Sherwood Park as a Nation
 
Join Date: Mar 2006
Location: Where I hang my hat
Posts: 2,372

Fox Towers taps into 104th Street buzz
Development scores points for walkability

http://www.foxtowers.ca/

Ann Sutherland
Edmonton Journal

Saturday, September 08, 2012


CREDIT: Ed Kaiser, Edmonton Journal
Fox Towers signs mark the build site. Construction on the first tower is expected to begin before the end of the year. Tenants should be able to move into their units two years later.

With its promenade, the farmers market, restaurants and shops, 104th Street is one of downtown Edmonton's hippest locations right now. Langham Developments is tapping into 104's vibrancy with its latest project, Fox Towers.

The buzz is already swirling around the two condominium highrises that will sit on the northwest corner of 104th Street and 102nd Avenue. Construction on the first tower, a 142-unit, 28-storey building, will begin at the end of this year with residents taking occupancy in about two years...

© Edmonton Journal 2012

Copyright © 2012 CanWest Interactive, a division of CanWest MediaWorks Publications, Inc.. All rights reserved.
CanWest Interactive, a division of CanWest MediaWorks Publications, Inc.. All rights reserved.

http://www2.canada.com/components/print.aspx?id=247032a3-89dc-4643-8ee3-8833942a8322&sponsor=
     
     
  #4363  
Old Posted Sep 9, 2012, 4:31 AM
bigcitydude's Avatar
bigcitydude bigcitydude is offline
Registered User
 
Join Date: Sep 2009
Location: St Albert, Alberta.
Posts: 471
^sweet! another parking lot bites the dust.
     
     
  #4364  
Old Posted Sep 9, 2012, 7:48 PM
bulliver's Avatar
bulliver bulliver is offline
So very tired...
 
Join Date: Feb 2009
Location: Penticton
Posts: 3,729
First and Jasper from Friday night:





     
     
  #4365  
Old Posted Sep 9, 2012, 7:57 PM
EdmTrekker EdmTrekker is offline
Registered User
 
Join Date: Jul 2006
Posts: 5,247
Amazing...pictures. You are obviously well connected to get the vantage points you so often shoot from.
     
     
  #4366  
Old Posted Sep 9, 2012, 8:41 PM
CMD UW's Avatar
CMD UW CMD UW is offline
Urbis Maximus
 
Join Date: Feb 2002
Location: Edmonton
Posts: 12,009
Again, stellar shots.
     
     
  #4367  
Old Posted Sep 9, 2012, 9:22 PM
s4.audios's Avatar
s4.audios s4.audios is offline
Registered User
 
Join Date: Aug 2011
Location: Edmonton
Posts: 1,320
Yes cool shots.. I'm surprised by how fast this project seems to be going. Or maybe I'm just getting used to the lengthy projects in the city (ie. federal building, pearl's 'never ending' dig and ug parking)
     
     
  #4368  
Old Posted Sep 9, 2012, 10:48 PM
bulliver's Avatar
bulliver bulliver is offline
So very tired...
 
Join Date: Feb 2009
Location: Penticton
Posts: 3,729
Tnx guys...
     
     
  #4369  
Old Posted Sep 10, 2012, 1:57 AM
espalorius espalorius is offline
Registered User
 
Join Date: Oct 2001
Location: backpack
Posts: 523
What's happening to Jasper Ave?
     
     
  #4370  
Old Posted Sep 10, 2012, 2:02 AM
EdmTrekker EdmTrekker is offline
Registered User
 
Join Date: Jul 2006
Posts: 5,247
Quote:
Originally Posted by espalorius View Post
What's happening to Jasper Ave?
Happening?? What do you think is happening??
     
     
  #4371  
Old Posted Sep 10, 2012, 2:18 AM
brenGT2's Avatar
brenGT2 brenGT2 is offline
Registered User
 
Join Date: Apr 2009
Location: Edmonton
Posts: 266
I stopped by the Pearl today to get a few shots of the construction progress. I also got a shot of the Innovation Centre for Engineering from across the river as well. I believe that the Pearl has just passed the half-way point in terms of floors now. I counted 18 when I was there.


Pearl Construction Update: September 9, 2012 by brenGT2, on Flickr


Pearl Construction Update: September 9, 2012 by brenGT2, on Flickr


Pearl Construction Update: September 9, 2012 by brenGT2, on Flickr


Pearl Construction Update: September 9, 2012 by brenGT2, on Flickr


Pearl Construction Update: September 9, 2012 by brenGT2, on Flickr


Pearl Construction Update: September 9, 2012 by brenGT2, on Flickr


Pearl Construction Update: September 9, 2012 by brenGT2, on Flickr


Pearl Construction Update: September 9, 2012 by brenGT2, on Flickr


Pearl Construction Update: September 9, 2012 by brenGT2, on Flickr


Pearl Construction Update: September 9, 2012 by brenGT2, on Flickr


Pearl Construction Update: September 9, 2012 by brenGT2, on Flickr


Pearl Construction Update: September 9, 2012 by brenGT2, on Flickr


Pearl Construction Update: September 9, 2012 by brenGT2, on Flickr


Innovation Centre for Engineering Construction Update: September 9, 2012 by brenGT2, on Flickr
     
     
  #4372  
Old Posted Sep 10, 2012, 2:20 AM
Keats82's Avatar
Keats82 Keats82 is offline
Registered User
 
Join Date: Sep 2009
Posts: 657
Quote:
Originally Posted by EdmTrekker View Post
Happening?? What do you think is happening??
They are repairing the leaky roof of the Central LRT station, along with narrowing Jasper Avenue from 7 lanes to 5 (by removing the dividers that were once there) and widening the sidewalk so it is more pedestrian/storefront/patio friendly.

When finished, to my understanding, the right lane of Jasper Ave will always be transit-orientated lanes at peak hours, and general parking when not. The middle lane will become the regular flow lane, and the left turning lanes will be where the dividers once were. As well, there will be no more left-hand turns on to 109th anymore.
     
     
  #4373  
Old Posted Sep 10, 2012, 2:26 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Quote:
Originally Posted by bulliver View Post
First and Jasper from Friday night:





is this a reclad project?
     
     
  #4374  
Old Posted Sep 10, 2012, 4:10 AM
feepa's Avatar
feepa feepa is offline
Change is good
 
Join Date: Oct 2005
Posts: 8,566
reclad and podium expansion.
     
     
  #4375  
Old Posted Sep 10, 2012, 4:25 AM
itom 987's Avatar
itom 987 itom 987 is offline
Moderator
 
Join Date: Aug 2003
Location: Edmonton
Posts: 5,086
If there is anything good about First and Jasper it is the fact that the ugly concrete wall facing Jasper Ave. has been removed. Aside from that, what a waste.
     
     
  #4376  
Old Posted Sep 10, 2012, 5:09 AM
espalorius espalorius is offline
Registered User
 
Join Date: Oct 2001
Location: backpack
Posts: 523
Quote:
Originally Posted by Keats82 View Post
They are repairing the leaky roof of the Central LRT station, along with narrowing Jasper Avenue from 7 lanes to 5 (by removing the dividers that were once there) and widening the sidewalk so it is more pedestrian/storefront/patio friendly.

When finished, to my understanding, the right lane of Jasper Ave will always be transit-orientated lanes at peak hours, and general parking when not. The middle lane will become the regular flow lane, and the left turning lanes will be where the dividers once were. As well, there will be no more left-hand turns on to 109th anymore.
Thank you
     
     
  #4377  
Old Posted Sep 10, 2012, 6:16 AM
Hallsy's Toupee's Avatar
Hallsy's Toupee Hallsy's Toupee is offline
Registered User
 
Join Date: Feb 2010
Location: Edmonton
Posts: 6,895
I never heard anything about them getting rid of the left-turns at Jasper Ave and 109 St. That doesn't even make a whit of sense.
     
     
  #4378  
Old Posted Sep 10, 2012, 12:44 PM
Shodan's Avatar
Shodan Shodan is offline
Sherwood Park as a Nation
 
Join Date: Mar 2006
Location: Where I hang my hat
Posts: 2,372

Meet you at the MOE? Advocates push for new Museum of Edmonton

Elise Stolte
Edmonton Journal

Monday, September 10, 2012

Edmonton has a great story. It just needs a place to talk about it, says the Edmonton Heritage Council, which is pushing for a new city museum.

Consultants for the heritage council are finishing a strategy for a city museum that could cost an estimated $45 million, and with a draft version in hand, heritage council executive director David Ridley is trying to talk it up...

[email protected] twitter.com/estolte To contribute your thoughts on a city museum, visit edmontonjournal.com/ edmontoncommons
© Edmonton Journal 2012

Copyright © 2012 CanWest Interactive, a division of CanWest MediaWorks Publications, Inc.. All rights reserved.
CanWest Interactive, a division of CanWest MediaWorks Publications, Inc.. All rights reserved.

http://www2.canada.com/components/print.aspx?id=ae8f1618-81a0-40bc-86a0-e6f54f91c6cc&sponsor=
     
     
  #4379  
Old Posted Sep 10, 2012, 2:36 PM
Black Star Black Star is offline
BANNED
 
Join Date: Jun 2010
Location: Edmonton
Posts: 7,259
Quote:
Originally Posted by Hallsy's Toupee View Post
I never heard anything about them getting rid of the left-turns at Jasper Ave and 109 St. That doesn't even make a whit of sense.

Me thinks that was a joke.
     
     
  #4380  
Old Posted Sep 10, 2012, 2:42 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Quote:
Originally Posted by feepa View Post
reclad and podium expansion.
I don't think the building is being reclad.

Quote:
Originally Posted by itom 987 View Post
If there is anything good about First and Jasper it is the fact that the ugly concrete wall facing Jasper Ave. has been removed. Aside from that, what a waste.
The only waste was that corner with the old BMO sucking the life out of it.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton
Forum Jump



Forum Jump


All times are GMT. The time now is 6:10 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.