  #4661  
Old Posted Aug 8, 2012, 11:40 AM
h0twired's Avatar
h0twired h0twired is offline
Dynamic Positivity!
 
Join Date: Jul 2006
Location: Winnipeg
Posts: 2,914
Quote:
Originally Posted by 1ajs View Post
wth when did this happen?
Is that the apartment block on Westwood Drive?
     
     
  #4662  
Old Posted Aug 8, 2012, 1:24 PM
armorand93's Avatar
armorand93 armorand93 is offline
Transit Nerd
 
Join Date: Nov 2010
Location: Calgary (former Winnipegger)
Posts: 2,707
Quote:
Originally Posted by h0twired View Post
Is that the apartment block on Westwood Drive?
I wish. It's the recladding of Osborne Village highrise towers!
     
     
  #4663  
Old Posted Aug 8, 2012, 1:28 PM
h0twired's Avatar
h0twired h0twired is offline
Dynamic Positivity!
 
Join Date: Jul 2006
Location: Winnipeg
Posts: 2,914
Quote:
Originally Posted by chrisallard5454 View Post
Speaking of WTH... please tell me they aren't building a parking lot on the North side of the CMHR.
Loading docks.
     
     
  #4664  
Old Posted Aug 8, 2012, 1:34 PM
roccerfeller's Avatar
roccerfeller roccerfeller is offline
Registered User
 
Join Date: Jul 2010
Location: BC
Posts: 2,932
So apparently, its the city that is delaying development of Heritage Landing.

The developers still want to see the project through, however it could get delayed 'till next year

Quote:
A local developer says foot-dragging by the City of Winnipeg could lead to the postponement of what was to be the first new downtown highrise residential project in the city in more than two decades.

Crystal Developers Ltd. has been trying for more than half a decade to build a new highrise apartment tower in downtown Winnipeg.

...
Quote:
...
Spletzer said if the site isn't cleared and a building permit issued within the next month or so, Crystal will likely delay the project until next year and focus on Phase II of its Grand Lyon Terrace luxury apartment development in southwest Winnipeg.

...
Quote:
...

There have been times when he's been tempted to walk away from the project, he said.

"If I had known there would be all of these delays, I would have said to the city, 'Keep the land. Forget it.'

Doing construction on a riverfront property is just a big headache."

But he said too much time and money has been spent on the project to walk away now.

"It will get built. It's just a matter of when."

...
More @ the link

http://www.winnipegfreepress.com/business/projects-rough-landing-165392236.html
     
     
  #4665  
Old Posted Aug 8, 2012, 2:26 PM
drew's Avatar
drew drew is online now
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,911
Quote:
Originally Posted by roccerfeller View Post
So apparently, its the city that is delaying development of Heritage Landing.

The developers still want to see the project through, however it could get delayed 'till next year
As with everything else, the truth likely lies somewhere in the middle of this story.

I am positive the city won't be helping to speed this project along (there is really no defending the permit system in this city), but I doubt the developer is being entirely forthcoming with other reasons for delays, including escalating costs that may make it cheaper to start this thing in the spring, versus starting fall/winter...
     
     
  #4666  
Old Posted Aug 8, 2012, 5:19 PM
good_dude's Avatar
good_dude good_dude is offline
Registered User
 
Join Date: Sep 2006
Location: 'peg city
Posts: 519
Quote:
Originally Posted by roccerfeller View Post
So apparently, its the city that is delaying development of Heritage Landing.

The developers still want to see the project through, however it could get delayed 'till next year

More @ the link

http://www.winnipegfreepress.com/business/projects-rough-landing-165392236.html
So lemme get this straight..you'd like the City to issue development permits to dig basements on underground hydro lines? Manitoba Hydro is responsible to relocate hydro lines, not the City.

It's easy to blame the city when construction is delayed, and they're not faultless, but when you dig a little deeper there's almost always more to the story.
     
     
  #4667  
Old Posted Aug 8, 2012, 6:07 PM
vid's Avatar
vid vid is offline
I am a typical
 
Join Date: Apr 2004
Location: Thunder Bay
Posts: 39,065
Does the city not know where this stuff is? Thunder Bay sold land on top of a water system trunk line to build condos and didn't realize what they'd done until almost two years into the process. Do cities not keep maps of this stuff?
     
     
  #4668  
Old Posted Aug 8, 2012, 6:38 PM
viperred88's Avatar
viperred88 viperred88 is offline
visionary
 
Join Date: Mar 2006
Location: Wpg
Posts: 1,214
Quote:
Originally Posted by roccerfeller View Post
The developers still want to see the project through, however it could get delayed 'till next year


More @ the link

http://www.winnipegfreepress.com/business/projects-rough-landing-165392236.html
Since rising cost are a problem why don't they consider leasing the land from the city. Money would be saved by not putting money down to acquire the land. Therefore those dollar saved would go towards to building the apartment tower.

At any rate I would have liked they have built north of assiniboine ave and preserve and create more greenspace for those in residential complexes who have no yard to hang out and play...
__________________
'We shape our buildings and then they shape us. They capture the Zeitgeist, the spirit of their time.'
     
     
  #4669  
Old Posted Aug 8, 2012, 6:44 PM
vid's Avatar
vid vid is offline
I am a typical
 
Join Date: Apr 2004
Location: Thunder Bay
Posts: 39,065
Developers won't build on leased land. When Thunder Bay worked on the aforementioned condo project, owning the land outright was a condition of the developers, which is a Winnipeg firm.
     
     
  #4670  
Old Posted Aug 8, 2012, 7:57 PM
flatlander's Avatar
flatlander flatlander is offline
Registered User
 
Join Date: Aug 2005
Location: Winnipeg
Posts: 2,370
Quote:
Originally Posted by vid View Post
Developers won't build on leased land. When Thunder Bay worked on the aforementioned condo project, owning the land outright was a condition of the developers, which is a Winnipeg firm.
Every building at The Forks is built on leased land. Portage Place too.
__________________
For best results play at maximum volume.
     
     
  #4671  
Old Posted Aug 8, 2012, 8:28 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,834
That is probably the same 66kv underground line that caused the River Ave CO_OP daycare problems when they wanted to buy land from the city on the South Side of the river. They were all set to buy and discovered the lines and had to walk away as they could not afford the cost to move them.
     
     
  #4672  
Old Posted Aug 8, 2012, 8:37 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,834
Quote:
Originally Posted by flatlander View Post
Every building at The Forks is built on leased land. Portage Place too.
That's commercial / retail and is quite common.

I may be wrong but I don't know of any apartments that are built on leased land.

I'll modify my last comment, I just checked and it appears that the apartments behind Portage Place are on land leased from Forks/North Portage (I thought they had bought the land from FNP) . I could not find any other instances though.

Last edited by cllew; Aug 8, 2012 at 8:43 PM. Reason: add info
     
     
  #4673  
Old Posted Aug 8, 2012, 9:41 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,834
Quote:
Originally Posted by Techman224 View Post
Speaking of freeways, I've saw the actual plans and maps of the then proposed freeways in Metro Winnipeg back in the 1960s, the WATS plan.

http://wpl-pac.winnipeg.ca/ipac20/ipac.j...sportation+Planning+Branch.&index=AUTHOR

It shows detail alignments. It's a roadgeek's goldmine!

Go to the third floor of the Millennium Library and ask for it at the desk.
Here is a copy of a 1969 Winnipeg Free Press article from the Miles Mac High School archives showing what was planned for the future in Winnipeg but has never happened.

http://www.mmcalumni.ca/v2/docs/ol/Proposed%20Winnipeg%20Freeways%20February%2028%201969.pdf

Bits and pieces have been done i.e. Concordia but they were just a waste of money because they will never be completed due to cost and NIMBY.
     
     
  #4674  
Old Posted Aug 8, 2012, 11:14 PM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,522
Quote:
Originally Posted by vid View Post
Does the city not know where this stuff is? Thunder Bay sold land on top of a water system trunk line to build condos and didn't realize what they'd done until almost two years into the process. Do cities not keep maps of this stuff?
the city has a map has all there stuff and anything done in the last 10yrs by the utilities in a cad file. they do have maps with the other stuff but the problem is some much of its abandond they don't honestly know whats what so never transcibed them to the new maps from what i can tell
     
     
  #4675  
Old Posted Aug 8, 2012, 11:40 PM
chrisallard5454's Avatar
chrisallard5454 chrisallard5454 is offline
Registered User
 
Join Date: May 2009
Location: Winnipeg
Posts: 2,047
Does anyone have any updates on 226 Osborne? It is literally 30 seconds from where I live, and I haven't seen any action yet. This will be a fine development if it goes through.
__________________
2017 Tryout for DEL 2 Kassel Huskies
     
     
  #4676  
Old Posted Aug 9, 2012, 12:09 AM
Andy6's Avatar
Andy6 Andy6 is offline
Starring as himself
 
Join Date: Mar 2002
Location: Toronto Yorkville
Posts: 9,764
Quote:
Originally Posted by cllew View Post
Here is a copy of a 1969 Winnipeg Free Press article from the Miles Mac High School archives showing what was planned for the future in Winnipeg but has never happened.

http://www.mmcalumni.ca/v2/docs/ol/Proposed%20Winnipeg%20Freeways%20February%2028%201969.pdf

Bits and pieces have been done i.e. Concordia but they were just a waste of money because they will never be completed due to cost and NIMBY.
Do you have any idea what we'd be paying to maintain that crumbling infrastructure by now? If it existed, most of it would just have to be bulldozed. It would be the Disraeli Bridge x 100.

I remember when illustrations of the plans were in the paper back then (when I was very young). It was all quickly forgotten after the 60s ended and everyone came back to earth. At that time there was a lot of prosperity and governments were spending like there was no tomorrow. People thought it would go on forever and were constantly coming up with grand schemes like this. But it never goes on forever.
__________________
crispy crunchy light and snappy
     
     
  #4677  
Old Posted Aug 9, 2012, 4:32 AM
Bluenote Bluenote is offline
BANNED
 
Join Date: Jun 2012
Location: Winnipeg / St Vital
Posts: 1,101
Quote:
Originally Posted by cllew View Post
Here is a copy of a 1969 Winnipeg Free Press article from the Miles Mac High School archives showing what was planned for the future in Winnipeg but has never happened.

http://www.mmcalumni.ca/v2/docs/ol/Proposed%20Winnipeg%20Freeways%20February%2028%201969.pdf

Bits and pieces have been done i.e. Concordia but they were just a waste of money because they will never be completed due to cost and NIMBY.
Thank god they never did any of this, take a look where half of it goes through. A the Forks would never have existed. My nice golf course would have a friggen bridge through it. Freeways through established neighborhoods. The only thing that was right was the inner ring road which they put land aside long ago, but they need to finish the friggen Perimeter first, I see even then they still liked traffic lights.
     
     
  #4678  
Old Posted Aug 9, 2012, 5:07 AM
flatlander's Avatar
flatlander flatlander is offline
Registered User
 
Join Date: Aug 2005
Location: Winnipeg
Posts: 2,370
Quote:
Originally Posted by chrisallard5454 View Post
Does anyone have any updates on 226 Osborne? It is literally 30 seconds from where I live, and I haven't seen any action yet. This will be a fine development if it goes through.
I think that for lease sign is destined to become a heritage object before the owner gets construction underway. It's a great site - not sure why they haven't been ready to take the plunge. Waiting for a commercial tenant maybe? The residential would surely do well.
__________________
For best results play at maximum volume.
     
     
  #4679  
Old Posted Aug 9, 2012, 6:20 AM
chrisallard5454's Avatar
chrisallard5454 chrisallard5454 is offline
Registered User
 
Join Date: May 2009
Location: Winnipeg
Posts: 2,047
Walked past Osborne and York today, where all three levels of government had signs up for a new bike path to be constructed on York, followed by a sign that said "coming to you in 2010". I just laughed, shook my head, and kept walking.
__________________
2017 Tryout for DEL 2 Kassel Huskies
     
     
  #4680  
Old Posted Aug 9, 2012, 1:47 PM
Mininari Mininari is offline
Registered User
 
Join Date: Jul 2004
Location: Victoria (formerly Port Moody, then Winnipeg)
Posts: 2,447
Quote:
Originally Posted by chrisallard5454 View Post
Walked past Osborne and York today, where all three levels of government had signs up for a new bike path to be constructed on York, followed by a sign that said "coming to you in 2010". I just laughed, shook my head, and kept walking.
Thats almost as funny as the lone Green "Canada's Action Plan" sign I see on my drive into town from Steinbach (temporarily living there) on route 210. Its a bare field on the south side of 210 just as you approach St. Adolphe.

I have no idea what economic action was stimulated, but I'm sure the sign is registered in the purported national geospatial database of every green sign (all printed in the USA) issued.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 5:38 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.