Unlike my previous post about a crane installation which turned out to be just a crane lift... This time it looks like we will infact see a crane installation at the end of the month.
Quote:
White Water Concrete will be installing a tower crane at 1151 W Georgia St. between 6:30am - 9:30pm. Traffic on W. Georgia will be reduced to single lane in each direction during this installation.
Traffic delays can be expected. Alternate routes are advisable.
Project Start: 2012/07/29 Expected Completion: 2012/07/29
|