Nice! According to the previously posted link (
http://www.yqr.ca/images/corporate/reference-materials/yqr_master_plan_2007_-_2027.pdf), if the master plan is followed, p. 116 shows the side elevation of the terminal expanded along its length by 9m (30 ft) out toward the driving lanes, with realignment of the driving lanes to accommodate the expansion, along with a possible multi-level parking structure that may be constructed, only after esthetics and sitelines have been considered.
P. 79 recommends that land should be reserved to extend the length of runway 13-31 to 9000ft (2743m), presumably to accommodate larger aircraft (?!) According to Appendix A of the
Canadian Airport Pavement Bearing Strengths document, wouldn't there be a need to eventually increase the load bearing capacity of the whole runway for some of the larger aircraft (from its present pavement load rating (PLR) of 11 to maximum 12? (re: Appendix B)) -- a lot of smaller airports that are listed already possess runways with PLR 12! (Probably because they engage heavy cargo or utility aircraft!)
This document is dated 2001, has there been any work on runway 08-26 to increase its load bearing capacity (stated as PLR 9) since then? -- unless that's already been done since the past runway upgrade work that took place last year! It looks like both runways could be widened also (from 46m), as even both of Saskatoon's runways are 61m wide, both with PLR's of 11!
Anyway, I'm certainly looking forward to seeing the actual plans for Regina Airport expansion!
Edit: Oops! If I remember correctly, last year they did work on the apron, not the runway!