HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 31, 2012, 7:58 PM
andasen andasen is offline
Registered User
 
Join Date: Feb 2012
Location: Calgary
Posts: 227
Quote:
Originally Posted by DarkKeyo View Post
I have to ask why we are looking at this so differently from the 3 (4) existing LRT lines.
One difference is that the three existing lines have existing upstream activity centers (Chinook, Southcenter, U of C, Airport (via McKnight), Sunridge, Marborough, Peter Lougheed Center) where the NC line doesn't have any existing activity nodes to my knowledge beyond access to the airport.

This needs to be addressed before construction can begin.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:00 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.