Quote:
Originally Posted by frinkprof
^Interesting. That answers a lot of my questions, except for one:
How much are we spending versus what gains will be achieved in terms of travel time and capacity improvements? If the gains aren't appreciable, especially given the capital being spent, may as well wait to build LRT.
|
Apparently they only have around $400 million dollars left of the green trip fund, but that money won't come until a later time.
There was a board at the open house which displayed travel times from Seton to DT. If I remember correctly it went like this:
BRT with mixed Traffic: 56mins
BRT on Transitway: 40-45mins (I can't remember which)
LRT: 34mins
All these times seem way too short!
From Mckenzie Towne to DT it takes 45-50mins on the BRT during the middle of the day.
And LRT from Seton -> DT in 34mins??? NO way! The route is 25km long and there are 14 stations planned. It takes about 30 mins from Somerset -> DT and the route is only 19km long with 11 stations until DT.