HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #4501  
Old Posted Jan 20, 2012, 11:05 PM
freeweed's Avatar
freeweed freeweed is offline
Home of Hyperchange
 
Join Date: Sep 2006
Location: Dynamic City, Alberta
Posts: 17,568
Quote:
Originally Posted by frinkprof View Post
Those monolithic up-over-down-again station heads were really a poor idea, especially for the busier stations like Chinook and Anderson. It will be good to see this one go.
Interesting, I don't recall hearing about this change before. Certainly makes their timelines more feasible.

This may be a tad dark, but I wonder how many more pedestrian accidents we'll see in the future as we add more at-grade crossings.
     
     
  #4502  
Old Posted Jan 20, 2012, 11:22 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by freeweed View Post
Interesting, I don't recall hearing about this change before. Certainly makes their timelines more feasible.

This may be a tad dark, but I wonder how many more pedestrian accidents we'll see in the future as we add more at-grade crossings.
My feeling is we'll see less at Chinook then we've seen in the past, as this redesign gets rid of the blind spot that currently exists along 61st Ave as the trains head north, which is where a lot of the current incidents and near-misses happen there. As for other stations, its hard to say. I think it will probably be no worse than before and the seriousness of accidents could drop providing the crossings are done right (ie: you can only cross in front of the train as its leaving, rather then in front of it as it arrives)
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #4503  
Old Posted Jan 20, 2012, 11:54 PM
The Chemist's Avatar
The Chemist The Chemist is offline
恭喜发财!
 
Join Date: Aug 2001
Location: 中国上海/Shanghai
Posts: 8,875
Will that 'monolithic' station design also be gotten rid of at Heritage, Southland, and Anderson when they go for rebuild?
__________________
"Nothing is too wonderful to be true, if it be consistent with the laws of nature." - Michael Faraday (1791-1867)
     
     
  #4504  
Old Posted Jan 21, 2012, 12:08 AM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
^Southland's already been extended, and I haven't heard anything for the other ones, although the Draft Anderson Station Area Plan has images that show a rebuilt station without the station structure.
     
     
  #4505  
Old Posted Jan 21, 2012, 12:31 AM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Quote:
Originally Posted by freeweed View Post
Interesting, I don't recall hearing about this change before. Certainly makes their timelines more feasible.

This may be a tad dark, but I wonder how many more pedestrian accidents we'll see in the future as we add more at-grade crossings.
I was thinking the same thing. I'd like to see some more intelligent gates at the crossings to help prevent that.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #4506  
Old Posted Jan 21, 2012, 9:05 PM
elconsulto's Avatar
elconsulto elconsulto is offline
Registered User
 
Join Date: Apr 2010
Location: Calgary
Posts: 214
As of yesterday there is a LED sign on the EEEL building at UofC that displays a bus schedule much like how the signs at C-trains work. A hint of more to come? Potential GPS implementation?
     
     
  #4507  
Old Posted Jan 21, 2012, 9:50 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Quote:
Originally Posted by elconsulto View Post
As of yesterday there is a LED sign on the EEEL building at UofC that displays a bus schedule much like how the signs at C-trains work. A hint of more to come? Potential GPS implementation?
Read the past couple pages of the thread.
     
     
  #4508  
Old Posted Jan 21, 2012, 10:54 PM
UofC.engineer's Avatar
UofC.engineer UofC.engineer is offline
Laura Palmer
 
Join Date: Nov 2010
Location: Twin Peaks, Calgary, AB
Posts: 1,033
Quote:
Originally Posted by frinkprof View Post
Mersar and I have had a peek at the design. It looks good. There will be a new bus shelter building separate from the station itself as YNAT mentions.
So if there are two at grade crossings is what type of weather shelter will there be for people waiting on the platform?

I personally like the up and over approach of the older stations because on a really cold day you can wait inside, and it is heated pretty decently.
     
     
  #4509  
Old Posted Jan 21, 2012, 10:58 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Quote:
Originally Posted by UofC.engineer View Post
So if there are two at grade crossings is there any type of weather shelter for people waiting on the platform?

I personally like the up and over approach of the older stations because on a really cold day you can wait inside, and it is heated pretty decently.
Heated shelters on the platform as per YouNeedaThneed's last post.
     
     
  #4510  
Old Posted Jan 21, 2012, 10:59 PM
UofC.engineer's Avatar
UofC.engineer UofC.engineer is offline
Laura Palmer
 
Join Date: Nov 2010
Location: Twin Peaks, Calgary, AB
Posts: 1,033
I hope the platform shelters are not like the ones on Canyon Meadows or Fish Creek stations. There are no doors on the shelters and the inside is filthy and graffitied up.
     
     
  #4511  
Old Posted Jan 21, 2012, 11:09 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Quote:
Originally Posted by UofC.engineer View Post
I hope the platform shelters are not like the ones on Canyon Meadows or Fish Creek stations. There are no doors on the shelters and the inside is filthy and graffitied up.
No, probably more like the ones at Somerset-Bridlewood and McKnight-Westwinds. Glass enclosure with closing door and heaters inside.
     
     
  #4512  
Old Posted Jan 22, 2012, 5:28 AM
Policy Wonk's Avatar
Policy Wonk Policy Wonk is offline
Inflatable Hippo
 
Join Date: Mar 2006
Location: Suburban Las Vegas
Posts: 4,015
Quote:
Originally Posted by UofC.engineer View Post
I personally like the up and over approach of the older stations because on a really cold day you can wait inside, and it is heated pretty decently.
It is pretty hard to justify the expense of operating them when no services are provided. No concessions or public washrooms, just a useless shell of a building.
__________________
Public Administration 101: Keep your mouth shut until obligated otherwise and don't get in public debates with housewives.
     
     
  #4513  
Old Posted Jan 22, 2012, 7:41 AM
UofC.engineer's Avatar
UofC.engineer UofC.engineer is offline
Laura Palmer
 
Join Date: Nov 2010
Location: Twin Peaks, Calgary, AB
Posts: 1,033
Quote:
Originally Posted by Policy Wonk View Post
It is pretty hard to justify the expense of operating them when no services are provided. No concessions or public washrooms, just a useless shell of a building.
True, true but grade separated crossings gives me the opportunity to run for the train when its pulling up to the station.

I personally liked the up and over designs, it gave the stations a 'metro' feel instead of LRT/streetcar feel like 39th ave or banff trail, but i guess for people with mobility issues two at grade crossings will probably be easier and more convenient.

At the end end of the day you're probably right policy wonk. The up and over approach was expensive for what it was; however I'd have to disagree with mersar(respectfully of course). I do believe collisions will increase at chinook with 2 at-grade crossings even with the blind corner removed and intelligent gates. There will always be that one person out of a million that is in a hurry and thinks he or she can run faster than the train.

Even though this is a bad example the guy in this video gets smoked by a train at banff trail.

http://www.calgaryherald.com/news/Transi...in/5826506/story.html?cid=megadrop_story

I say bad example because he isn't paying attention and the station doesn't have crossing arms.
     
     
  #4514  
Old Posted Jan 22, 2012, 7:45 AM
UofC.engineer's Avatar
UofC.engineer UofC.engineer is offline
Laura Palmer
 
Join Date: Nov 2010
Location: Twin Peaks, Calgary, AB
Posts: 1,033
I'd like to know the pedestrian traffic flows for the stations: Anderson, Southland, Heritage and Chinook. How many people use the building? and how many people use the crossing? coming both on and off to the platforms.
     
     
  #4515  
Old Posted Jan 22, 2012, 8:16 AM
Policy Wonk's Avatar
Policy Wonk Policy Wonk is offline
Inflatable Hippo
 
Join Date: Mar 2006
Location: Suburban Las Vegas
Posts: 4,015
My personal preference, even thought it is doesn't really jive with the way things get done would be to build some fairly large stations with an indoor retail concourse and public amenities and turn entire stations over to private operators who could sublease the retail space. This would provide for a permanently manned station, better security and the ability for the private operator to deal with vagrants the same way they are treated when they wander into Holt Refrew... very quickly.

This is being experimented with in Sydney Australia where the airport CityRail station is privately operated under a 35 year lease.
__________________
Public Administration 101: Keep your mouth shut until obligated otherwise and don't get in public debates with housewives.
     
     
  #4516  
Old Posted Jan 22, 2012, 3:36 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Quote:
Originally Posted by UofC.engineer View Post
True, true but grade separated crossings gives me the opportunity to run for the train when its pulling up to the station.
Nothing is/was ever more frustrating than seeing a train coming in, from a fair distance I might add, and then having to proceed to use the ridiculous and overbuilt [climb up the huge set of stairs/escalator=>long corridor/empty space past the ticket machines=>descend another huge set of stairs] route only to miss by a mile the train that would have been a piece of cake to catch in any other circumstance.
     
     
  #4517  
Old Posted Jan 22, 2012, 3:40 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Quote:
Originally Posted by Policy Wonk View Post
My personal preference, even thought it is doesn't really jive with the way things get done would be to build some fairly large stations with an indoor retail concourse and public amenities and turn entire stations over to private operators who could sublease the retail space. This would provide for a permanently manned station, better security and the ability for the private operator to deal with vagrants the same way they are treated when they wander into Holt Refrew... very quickly.

This is being experimented with in Sydney Australia where the airport CityRail station is privately operated under a 35 year lease.
Would it not have to be a sweetheart and/or publicly subsidized leasing scheme though? The retail components of the old south and NE line stations shut down years ago because the operators couldn't make a go of it and there's been very little interest in the venture since.
     
     
  #4518  
Old Posted Jan 22, 2012, 4:12 PM
mwalker_mw mwalker_mw is offline
Registered User
 
Join Date: Apr 2008
Posts: 287
Quote:
Originally Posted by frinkprof View Post
Would it not have to be a sweetheart and/or publicly subsidized leasing scheme though? The retail components of the old south and NE line stations shut down years ago because the operators couldn't make a go of it and there's been very little interest in the venture since.
Something tells me that a Starbucks or Tim Hortons right beside a captive gaggle of office drones first thing in the morning might be able to make a profit. IIRC the last attempts at stores in the stations was long before it became fashionable to drop several dollars daily on brown liquid. They could limit their open hours to peak times but the lease could require them to provide security/washrooms/whatever all day.
     
     
  #4519  
Old Posted Jan 22, 2012, 4:38 PM
Policy Wonk's Avatar
Policy Wonk Policy Wonk is offline
Inflatable Hippo
 
Join Date: Mar 2006
Location: Suburban Las Vegas
Posts: 4,015
Quote:
Originally Posted by frinkprof View Post
Would it not have to be a sweetheart and/or publicly subsidized leasing scheme though? The retail components of the old south and NE line stations shut down years ago because the operators couldn't make a go of it and there's been very little interest in the venture since.
Calgary Transit put them out of business by way of ridiculous rents, so relative to past terms I suppose it would be a sweetheart deal.

The issue was last revisited as part of the security review and was supposed to result in a one year pilot project. But I don't believe anything ever came of that.
__________________
Public Administration 101: Keep your mouth shut until obligated otherwise and don't get in public debates with housewives.
     
     
  #4520  
Old Posted Jan 22, 2012, 6:12 PM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
Quite frankly, the pedestrians at Chinook are idiots. I've witnessed a lot of jaywalking across 61st Ave and some of these folks use the rail crossing as a crosswalk too. Removing the "blind spot" from the NB CTrain crossing is a good idea.
__________________
Stevinder.
* * * * * *
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:43 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.