I guess there won't be underground trains taking passengers to different concourses like in Denver or Atlanta. I actually think this new design is more practical (from a passenger's point of view, maybe not for taxiing).
Reply With Quote
     
     
  #3882  
Old Posted Jan 18, 2012, 6:24 AM
skyguy414 skyguy414 is offline
Registered User
 
Join Date: Jan 2008
Location: SLC
Posts: 299
Quote:
Originally Posted by SLCdude View Post
I guess there won't be underground trains taking passengers to different concourses like in Denver or Atlanta. I actually think this new design is more practical (from a passenger's point of view, maybe not for taxiing).
What is shown is the first phase of a longer expansion plan. Once this phase is complete, the next phase includes demolitioning the old concourses and building a separate paraellel concourse north of the terminal and south concourse. It will be connected with underground people movers. Again, this is longer down the road. But one of the tunnels for connecting the two concourses is already in place.
Reply With Quote
     
     
  #3883  
Old Posted Jan 18, 2012, 6:39 AM
arkhitektor arkhitektor is offline
Registered User
 
Join Date: Feb 2005
Location: Clearfield, UT
Posts: 1,784
So, is Delta getting the new concourses with the other airlines and regional planes relegated to the old ones?
Reply With Quote
     
     
  #3884  
Old Posted Jan 18, 2012, 7:07 AM
Stenar's Avatar
Stenar Stenar is offline
Registered User
 
Join Date: Jul 2008
Location: Salt Lake City
Posts: 3,234
Quote:
Originally Posted by skyguy414 View Post
What is shown is the first phase of a longer expansion plan. Once this phase is complete, the next phase includes demolitioning the old concourses and building a separate paraellel concourse north of the terminal and south concourse. It will be connected with underground people movers. Again, this is longer down the road. But one of the tunnels for connecting the two concourses is already in place.
The Trib article says the airport has scrapped plans for a second parallel north concourse.
Reply With Quote
     
     
  #3885  
Old Posted Jan 18, 2012, 7:07 AM
SLC4L SLC4L is offline
Registered User
 
Join Date: Feb 2010
Location: Salt Lake City, Utah
Posts: 157
2022!? Yikes! That seems forever off. However, when all is said and done, the old airport will always be immortalized in Dumb & Dumber.
Reply With Quote
     
     
  #3886  
Old Posted Jan 18, 2012, 10:22 AM
skyguy414 skyguy414 is offline
Registered User
 
Join Date: Jan 2008
Location: SLC
Posts: 299
Exact details of where airlines will be located hasn't been finalized yet but one of the ideas for the new terminal/concourse was to be able to incorporate all aircraft, regional and mainline, into all gates rather than have segregated areas for each.

Quote:
Originally Posted by Stenar View Post
The Trib article says the airport has scrapped plans for a second parallel north concourse.
Only for the first phase. Originally, the first phase included constructing part of the second parallel concourse. Now it will be in a later phase much down the road. It should be noted, the later phases are not reflected in the 1.8 bil price tag.
Reply With Quote
     
     
  #3887  
Old Posted Jan 18, 2012, 10:44 AM
skyguy414 skyguy414 is offline
Registered User
 
Join Date: Jan 2008
Location: SLC
Posts: 299
Here is a link to a presentation which explains the first phase in better detail:

http://www.slcclassic.com/links/airport.pdf

Also, read Mayor Becker's state of the city address. He talks about what he forsees the airport becoming.

http://www.slcgov.com/2012-state-city-address-mayor-ralph-becker
Reply With Quote
     
     
  #3888  
Old Posted Jan 18, 2012, 1:44 PM
Makid Makid is offline
Registered User
 
Join Date: Jun 2006
Posts: 2,107
I couldn't find any information in the airport upgrade plan about extending the runways. Skyguy or anyone else have any information on when we will see the runways extended and the possible new runway we saw on plans a year or so ago?

Also, are the runway upgrades also included in the $1.8 Billion renovation cost or is it separate
Reply With Quote
     
     
  #3889  
Old Posted Jan 18, 2012, 2:07 PM
jtrent77 jtrent77 is offline
Registered User
 
Join Date: Aug 2008
Posts: 571
Quote:
Originally Posted by skyguy414 View Post
Here is a link to a presentation which explains the first phase in better detail:

http://www.slcclassic.com/links/airport.pdf

Also, read Mayor Becker's state of the city address. He talks about what he forsees the airport becoming.

http://www.slcgov.com/2012-state-city-address-mayor-ralph-becker
That first link is pretty cool showing each of the steps of the first phase. And who knows maybe "future phase 2" will be needed much sooner than expected
Reply With Quote
     
     
  #3890  
Old Posted Jan 18, 2012, 3:51 PM
skyguy414 skyguy414 is offline
Registered User
 
Join Date: Jan 2008
Location: SLC
Posts: 299
Quote:
Originally Posted by Makid View Post
I couldn't find any information in the airport upgrade plan about extending the runways. Skyguy or anyone else have any information on when we will see the runways extended and the possible new runway we saw on plans a year or so ago?

Also, are the runway upgrades also included in the $1.8 Billion renovation cost or is it separate
The 1.8 billion figure is just for phase 1 of the new terminal, the parking structure/light rail station, new facility maintenance building, and rental car facility.

Any runway projects will have a separate budget.
Reply With Quote
     
     
  #3891  
Old Posted Jan 18, 2012, 3:55 PM
shakman's Avatar
shakman shakman is offline
Chairman
 
Join Date: Jun 2002
Location: PRMD - People's Republic of Maryland
Posts: 2,688
Quote:
Originally Posted by arkhitektor View Post
So, is Delta getting the new concourses with the other airlines and regional planes relegated to the old ones?

It sounds more like the entire structure will eventually be scrapped and rebuilt in phases.
__________________
"I measure the value of life not by how much I have, instead by what I have done.

-sb

Last edited by shakman; Jan 18, 2012 at 4:33 PM.
Reply With Quote
     
     
  #3892  
Old Posted Jan 18, 2012, 4:12 PM
Future Mayor's Avatar
Future Mayor Future Mayor is offline
Vote for me in 2019!
 
Join Date: Jun 2007
Location: Salt Lake City, UT
Posts: 4,803
The fact that they referred to it as "End of Phase 1" and also call it South Concourse East and West, rather than simply Concourse East and West. Says that eventually, maybe in 15 years, that phase 2 will include the north concourse.

That presentation really helped to understand the flow.
Reply With Quote
     
     
  #3893  
Old Posted Jan 18, 2012, 4:20 PM
Old&New's Avatar
Old&New Old&New is offline
Registered User
 
Join Date: Jun 2011
Posts: 1,537
I'm going to preemptively ask that no one starts up another thread for the airport, and that we keep the airport conversation to this thread.
Reply With Quote
     
     
  #3894  
Old Posted Jan 18, 2012, 4:28 PM
tygr tygr is offline
Development Junkie
 
Join Date: Mar 2011
Posts: 277
Quote:
Originally Posted by Old&New View Post
I'm going to preemptively ask that no one starts up another thread for the airport, and that we keep the airport conversation to this thread.
I'll second that.

In another note. After seeing that the south phase of FrontRunner will be opening at the end of this year, I tweeted to @RideUTA to ask when the airport line opens. Within moments, they replied "2013." I guess that's just in time for all of the chaos to begin at the airport. If it's not one thing, it's another. But hey, any development news is good news. Especially when it's forward progression.

Also, I am somewhat disappointed that UTA didn't see the I-15 CORE project as an opportunity to capitalize on trying to gain riders before that project is complete. They did the same thing with Legacy Highway; opening the north phase of FrontRunner at about the same time Legacy opened. I would have thought that they could have tried to take advantage of the congestion that WAS, not open right when two completely new highway lanes open in each direction.
__________________
The only thing worse than being blind is having sight, but no vision.
—Helen Keller
Reply With Quote
     
     
  #3895  
Old Posted Jan 18, 2012, 4:32 PM
Future Mayor's Avatar
Future Mayor Future Mayor is offline
Vote for me in 2019!
 
Join Date: Jun 2007
Location: Salt Lake City, UT
Posts: 4,803
By the power vested in me, as Future Mayor, I say let it be done. This thread shall be the official thread for the SLC International Airport renovation and expansion.
Reply With Quote
     
     
  #3896  
Old Posted Jan 18, 2012, 7:04 PM
s.p.hansen's Avatar
s.p.hansen s.p.hansen is offline
Exurb Enjoyer
 
Join Date: Sep 2010
Location: The Great Salt Lake, Utah
Posts: 2,261
Yeah, with how long term the SLC Int. Airport project is, we'll definitely want to just keep the progress to this thread.

So excited .
Reply With Quote
     
     
  #3897  
Old Posted Jan 18, 2012, 7:10 PM
SLC Projects's Avatar
SLC Projects SLC Projects is offline
Bring out the cranes...
 
Join Date: Dec 2006
Location: Salt Lake City
Posts: 6,108
You guys are no fun.
__________________
1. "Wells Fargo Building" 24-stories 422 FT 1998
2. "LDS Church Office Building" 28-stories 420 FT 1973
3. "111 South Main" 24-stories 387 FT 2016
4. "99 West" 30-stories 375 FT 2011
5. "Key Bank Tower" 27-stories 351 FT 1976
Reply With Quote
     
     
  #3898  
Old Posted Jan 18, 2012, 7:41 PM
i-215's Avatar
i-215 i-215 is offline
Exit 298
 
Join Date: Sep 2003
Location: Inland Empire (CA)
Posts: 3,494


WOO-HOO! New airport!!!!!!

I only wish they could figure out a way to integrate the existing parking garage into the new airport. I love driving much too quickly up and down those round ramps between decks. Seems a waste to demolish a structure that's seismically sound and not even 20 years old.
__________________
I've stopped caring. Good luck, America
Reply With Quote
     
     
  #3899  
Old Posted Jan 18, 2012, 8:58 PM
s.p.hansen's Avatar
s.p.hansen s.p.hansen is offline
Exurb Enjoyer
 
Join Date: Sep 2010
Location: The Great Salt Lake, Utah
Posts: 2,261

SLC Tribune



Deseret News

Last edited by s.p.hansen; Jan 18, 2012 at 9:11 PM.
Reply With Quote
     
     
  #3900  
Old Posted Jan 19, 2012, 2:46 AM
skyguy414 skyguy414 is offline
Registered User
 
Join Date: Jan 2008
Location: SLC
Posts: 299
Quote:
Originally Posted by i-215 View Post


WOO-HOO! New airport!!!!!!

I only wish they could figure out a way to integrate the existing parking garage into the new airport. I love driving much too quickly up and down those round ramps between decks. Seems a waste to demolish a structure that's seismically sound and not even 20 years old.
The current parking garage is too small for current and future needs and will need to be demolished to make way for the east side of the new concourse. The new garage will hold nearly 4x the number of cars what the current garage does. By the time the old one is demolished, it will be more than 25-30 years old. I think the airport got plenty of life out of it.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West
Forum Jump



Forum Jump


All times are GMT. The time now is 7:57 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.