Quote:
Originally Posted by Radley77
Kinda weird proposal but thought I might ask it....
What about a developing a single lane of right of way on Edmonton Trail northbound, and a single lane of right of way on Centre Street southbound. Essentially any time a rapid bus comes to an intersection it would have precedence over any other timing signals and have it's own lane. Centre St and Edmonton trail blocks are about 3-4 blocks apart on average. Rapid buses would only stop at designated stops and no other vehichle would have priority over the rapid buses ensuring a quick travel time. Any bigger gap than 4 blocks could link a paired Edmonton Trail\Centre St stop via bike share.
|
The tidal lane reversal with bus/HOV lane on Centre Street essentially already achieves this. According to this report
http://www.mrc.ca/pdf/CUTA%20HOV%20Final%20Report.pdf , peak hour/peak direction use of Centre Street involves:
55 buses, 2750 passengers in HOV lane
330 carpools, 660 people in HOV lane
140 single occupant violators in HOV lane
1030 vehicles in remaining two peak direction GPLs
I'm not sure if "hour" means 1 hour, the report is from 2007 and I can't count an hour with 55 busses using the Centre Street Bridge today when the number should theoretically be higher (14 #3, 11 #301, 6 #2, 5 #109 Harvest Hills Express, 8 #116 Coventry Hills Express, 5 #142 Panorama Express, 2 #300, for 51 total busses) but then again I am probably missing some routes.
Now if the bus/HOV lane becomes congested we could relieve it in a number of ways. First we could get stricter enforcement from CPS to remove those 140 violators. Second we could move from a 2 occupant HOV standard to a 3 occupant standard, cutting down on the 330 legitimate cars in the lane. Finally, if congestion is still an issue, we could eliminate the HOV component of the lane entirely and make it a bus only lane (except for cars turning on the next block of course). Those options ought to ensure the kind of rapid bus service you're asking for if the current arrangement isn't good enough. The tidal flow-bus/HOV lane system can always be extended north and may indeed have to be to cope with increased bus loads that we can expect until the NC LRT is built (whether in Nose Creek or under Centre Street).
I don't think we would need a dedicated bus/HOV lane that travels counter to prevailing traffic conditions. I suppose a lot of busses still have to travel north in the AM peak (or south in the PM) so that they can again travel south but the reduced need to stop for boarding/disembarking passengers and the general lack of counter flow traffic probably combine to seriously reduce congestion, leading to a reasonably fast travel time. So yeah, it would probably be overkill.