Quote:
Originally Posted by ByeByeBaby
I don't get how this is an argument against the Centre St alignment; from 96th and Harvest Hills to the middle of downtown is 15 km via Nose Creek and 11 km via Centre Street. The Nose Creek alignment would have 7 stations before entering the CBD; an example proposal for Centre Street is... 7 stations. So the "rapid link" you are arguing for is the one that goes 36% farther and stops as frequently.
|
The longer distance is offset by massively lower capital costs and the ability to operate at higher speed.
Quote:
|
Although the Nose Creek line would provide double the service to the two least-used stations in the whole system, so there's that benefit. Too bad we'd wind up digging ourselves an 8th ave tunnel at significant expense to relieve the congestion due to interlining on 7th Ave, then undo that by reintroducing it.
|
Sigh... not this one again.
I realize this is heresy around here but:
1. There is nothing wrong with interlining.
2. The 202 will have to be buried years ahead of any North Central LRT being built.
The peak headways Calgary Transit has stated it is their intention to operate are higher than the combined 201 and 202 traffic on 7th today. Calgary Transit can't operate their present peak schedule, with or without interlining because of surface traffic. This will have to be addressed decades before a North Central LRT begins serious planning.
Quote:
|
Well, capital cost, at least. Certainly the dozens of buses down Centre St. could be largely replaced by LRT, so the operating costs are way lower for a Centre St. LRT. And there's the added costs (to the City and other agencies) of further sprawl; these are harder to quantify, but to the degree a Centre St. LRT reduces the need for additional tri-services coverage, or new schools, etc., there is also the potential for cost savings. And if the value of property goes up 10-20% near LRT stations, the increase in the property tax base is radically higher for a Centre St. alignment.
|
This is the same nonsense advanced by the proponents of shutting down the Edmonton airport. Is somebody in the market for a typical suburban home in N.W. Calgary going to buy a infill condo on Centre Street just because they build one there instead? Probably not. Further the marginal costs associated with public services aren't really in the physical plant but in manpower, most of which is has to be allocated based on population rather than location.