Quote:
Originally Posted by bunt_q
You still haven't said where you'd do it though. Or addressed how a very expensive EMU is superior to a BRT if you're doing it in the highway right-of-way. I am getting the impression you just have a fetish for EMU.
|
Not at all, I think you're just being a little hard headed. The NW Rail was chosen to be DMU because of three reasons:
1.) It needed to share BNSF ROW and BNSF wouldn't approve overhead caternary in their ROWs.
2.) The Boulder to Longmont portion, would add suffiecient length, to make the cost of full electrification, very high.
3.) The BNSF corridor, is very curvy and indirrect, so as to bypass steep grades. This strengthens DMUs viability, in this corridor.
However, there are some issues...
1.) There are not currently any FRA-compliant DMUs available. The Silverliner V's being used in FasTracks EMU lines, are being planned to to also have an FRA-compliant DMU version at some point.
2.) The current costs of the NW Rail Corridor are now over $1.7 billion and likely to climb to $2 billion, or more.
3.) US36 BRT, is really only partial BRT and wont ever perform as true BRT.
4.) NW Rail Phase 1 will be constructed and it will be EMU, not DMU. This Phase 1 spur, will need to be extended by at least a few stations in the future, to make the line viable to operate. BNSF Corridor is all but out of teh question, with their rediculous costs. New ROW will be needed to extend the NW Rail EMU, even if it's just by one or two stations per phase.
Eventually, it could be extended all the way to South Boulder's Table Mesa Station. It doesn't have to be extended all the way to Table Mesa. I'm simply saying they should extend it in phases, over time, by a station or two at a time. Maybe one day, it will get all the way to Table Mesa in south Boulder. Maybe that won't happen until the year 2075; I don't care. It could be extended, one station at a time, which would allow for full TOD infill to be built around each station, before the line is extended to the next station.
Lets face it, at $2 billion, the NW Rail could be built in all new ROW and be constructed as full HSR. That's not an exageration. So it would be foolish to build it as currently proposed.
So I say:
1.) Cancel NW Rail Phase 2.
2.) Expand the Boulder hubbed BRT/Rapid Bus system, to Longmont, Louisville and any other feasible locations.
3.) CDOT and RTD work together, to make the DMU extension of the North Corridor to Longmont, to be built before 2030.
4.) Extend the NW Rail EMU line, one station at a time -- after TOD completely fills in the existing station -- before extending the line to the next statiion. This might mean extending the line by only one or two stations, per decade.