Quote:
Originally Posted by SnyderBock
Ok, so back to my proposal. serve Longmont with commuter rail, but do it via the North Corridor (as CDOT as identified as the preperfed alternative) and fund it via the CDOT or a collaborative state tax passed for both CDOT and RTD, but not with FasTracks funds.
In doing so, we cut out the $1.4 billiion+ NW rail to Longmont, from the FasTracks project. But then we replace that with expanded BRT from Boulder to Longmont and perhaps a spur from Louisville to Boulder as well (Perhaps $300 million, tops, because it's not truly BRT).
Then RTD looks for ways to extend the NW Phase 1 EMU line, closer to Boulder. Perhaps with a new FasTracks tax, or perhaps with a joint CDOT/RTD state tax. But extending it only to about Table Mesa. We're talking $900 million, tops.
So that puts the NW corridor up to $1.2 billion, tops. and if you exlude the phased extensions of the NW corridor EMU rail, from FasTracks, you're only looking at the addition ~$300 million needed to expand the BRT proposal. That's a potential $1.1 billion saving off FasTracks budget. The current extimate is $1.4 billiion (or more) just for the rail.
Both options are expensive and will require additional funding. I'm just saying, if CDOT moves forward with the North corridor extension to Longmont, Loveland and Fort Collins, then why not consider just expanding the BRT from Boulder, making Boulder the hub for that BRT system. Forget the NW corridor DMU. It's already being built in Phase 1 as EMu. Maybe just extend that in phases, as EMU, as the population grows and ridership increases, over time? Forget the BNSF managed DMU corridor, that's looking pretty fail to me right now.
|
I like the BRT through Boulder and up to Longmont. If we are making it true BRT and removing the managed lane component as well as moving the stations to the center it could be a good long term solution.
If we keep the managed lane component than it is only a medium term solution because as congestion goes up it would be increasingly difficult to price SOV out of using it (due to politics and economics), and illegal to keep out carpoolers, motorcycles etc.
Taking out the managed lane component on construction would cut off some already secured funding sources so the price would go up beyond that 300 million (if I remember correctly 100-150 million). If we converted from managed to BRT later I am not sure on the legality of taking federal and state money to make a managed lane and then converting it, but I would guess it could be done without ruffling a few feathers if given enough time.
Also I think politically Longmont would be okay with the train later and BRT soon. I would think that's a better solution as well since Longmont gets BRT service to Boulder and eventually will get a train to Denver with an alignment that makes more sense than the one proposed. As you said the north extension also enables CDOT or whomever to extend it to Fort Collins like the North I25 plan shows.
As far as extending the train to Boulder along US 36 goes I am with bunt on this one. As long as the BRT is a viable solution having two competing modes of public transportation doing virtually the same thing and serving the same stations just doesn't make sense. If we keep the managed lanes I could see us phasing in a train later if congestion makes BRT unreliable and it is not feasible to convert managed lanes to true BRT. But in that scenario you are subtracting BRT and adding a train way off in the future so they are never competing.