  #2761  
Old Posted Nov 29, 2011, 9:08 PM
ceedub1170's Avatar
ceedub1170 ceedub1170 is offline
Registered User
 
Join Date: Sep 2006
Location: Regina
Posts: 451
^^ Can someone translate for me?
     
     
  #2762  
Old Posted Nov 29, 2011, 9:20 PM
Dougler306 Dougler306 is offline
Registered User
 
Join Date: Oct 2011
Location: Regina
Posts: 462
     
     
  #2763  
Old Posted Nov 29, 2011, 10:03 PM
jw6969 jw6969 is offline
Registered User
 
Join Date: Nov 2010
Posts: 241
Quote:
Originally Posted by CoR East View Post
There is a piling rig set up in the excavation this morning
I drove by there a dozen times today, There was a cement truck doing something and the pilling rig is down in the hole.

As for capital pointe all the windows at ground level are out on Albert st and there where people moving about inside.
     
     
  #2764  
Old Posted Nov 30, 2011, 12:32 AM
thefourthtower thefourthtower is offline
Registered User
 
Join Date: Jun 2010
Location: Rueannatta
Posts: 2,597
`

Last edited by thefourthtower; Jun 12, 2013 at 8:53 PM.
     
     
  #2765  
Old Posted Nov 30, 2011, 1:40 AM
Treesplease Treesplease is offline
Registered User
 
Join Date: Jul 2011
Posts: 990
Quote:
Originally Posted by thefourthtower View Post
New roadwork planned in Regina

By Terrence McEachern, Leader-Post


Read more: http://www.leaderpost.com/roadwork+planned+Regina/5785932/story.html#ixzz1f8zsFJOh
Regarding the Vic east construction not being complete until October 2013. Agree with the project just not sure about the timelines? - vic east will be under construction for 2 yrs? yikes!
     
     
  #2766  
Old Posted Nov 30, 2011, 2:56 AM
Golks Golks is offline
Registered User
 
Join Date: Dec 2007
Location: Regina, SK
Posts: 119
Quote:
Originally Posted by Treesplease View Post
Regarding the Vic east construction not being complete until October 2013. Agree with the project just not sure about the timelines? - vic east will be under construction for 2 yrs? yikes!
It looks like it will be a full reconstruction with new concrete bridges replacing the wood ones over Pilot Butte Creek along with intersection realignments and traffic signal upgrades. Utilities and drainage will most likely have to be updated/upgraded as well.

It is at least 1200 meters of roadway x 6 lanes plus turning bays and merging lanes. Everything considered it is a huge project.
     
     
  #2767  
Old Posted Nov 30, 2011, 5:47 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
What is the building going up at 11th and Albert? Is it a major development or just low rise?
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
  #2768  
Old Posted Nov 30, 2011, 5:51 AM
CCF's Avatar
CCF CCF is offline
Canadian Urbanite
 
Join Date: Jul 2006
Location: Across Canada
Posts: 3,530
     
     
  #2769  
Old Posted Nov 30, 2011, 6:29 AM
BrannyMuffin BrannyMuffin is offline
Registered User
 
Join Date: Aug 2006
Location: Regina
Posts: 970
They're talking about building a parkade at RGH again. This time I think they will actually do it. Interestingly (at least to me) it was the question of where to put a helicopter landing pad that led to this. Although, in addition to losing a large number of parking spaces during construction, I don't know where they plan to land the helicopters in the mean time? According to this article it will cost around $30 million to build a parkade and parking generates $3.5 million per year in the RQHR (it says they don't have specific numbers for RGH/Pasqua, but I'm thinking 99% of this comes from those two facilities...I believe parking is mostly free at Wascana and I can't see charging for parking in the rural facilities). Basically it would be paid for in under 10 years. They're also planning for staff shuttles between facilities (so if I work at Wascana and have a meeting at RGH I can just hop on the shuttle) and a park and ride system.

Quote:
A parkade at the Regina General Hospital (RGH) has long been talked about as a panacea for the facility’s parking headaches.

Now, the talk has gone beyond grumbling of staff and patients and moved into the boardroom.

The Regina Qu’Appelle Health Region (RQHR) and the Ministry of Health began discussions about building a parkade at the General Hospital a couple of months ago, said Barry Stricker, the region’s director of security and parking services.

“The discussions have taken place on numerous levels, but it does come off the heels of discussions relative to the helicopter landing pad,” he said.



Read more: http://www.leaderpost.com/Regina+hospita...ortages/5786031/story.html#ixzz1fASEVOG0
     
     
  #2770  
Old Posted Nov 30, 2011, 6:33 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Hmm, nice building! Small, but should add some character
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
  #2771  
Old Posted Nov 30, 2011, 1:50 PM
Chaps Chaps is offline
Registered User
 
Join Date: Dec 2006
Posts: 825
Quote:
Originally Posted by CCF View Post
Was this building "in before the plan" or will there be ground floor retail?
     
     
  #2772  
Old Posted Nov 30, 2011, 2:33 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,976
Quote:
Originally Posted by BrannyMuffin View Post
They're talking about building a parkade at RGH again. This time I think they will actually do it. Interestingly (at least to me) it was the question of where to put a helicopter landing pad that led to this. Although, in addition to losing a large number of parking spaces during construction, I don't know where they plan to land the helicopters in the mean time? According to this article it will cost around $30 million to build a parkade and parking generates $3.5 million per year in the RQHR (it says they don't have specific numbers for RGH/Pasqua, but I'm thinking 99% of this comes from those two facilities...I believe parking is mostly free at Wascana and I can't see charging for parking in the rural facilities). Basically it would be paid for in under 10 years. They're also planning for staff shuttles between facilities (so if I work at Wascana and have a meeting at RGH I can just hop on the shuttle) and a park and ride system.
There is no way a 30 million parking garage will pay for itself. If it would, they could just have the private sector build it. You are forgetting the considerable operating costs of a parkade including 24/365 staffing, security, lighting, power, cleaning, repairs, depreciation, interest, etc. I am not sure if they would have pay grants in lieu of taxes to the City as a commercial part of the hopsital (this would be true for the Robins Donuts, for example). I suppose the land is "free". Also no more than 1/2 of the $3.5 million would be from RGH
     
     
  #2773  
Old Posted Nov 30, 2011, 3:04 PM
BrannyMuffin BrannyMuffin is offline
Registered User
 
Join Date: Aug 2006
Location: Regina
Posts: 970
Quote:
Originally Posted by Stormer View Post
There is no way a 30 million parking garage will pay for itself. If it would, they could just have the private sector build it. You are forgetting the considerable operating costs of a parkade including 24/365 staffing, security, lighting, power, cleaning, repairs, depreciation, interest, etc. I am not sure if they would have pay grants in lieu of taxes to the City as a commercial part of the hopsital (this would be true for the Robins Donuts, for example). I suppose the land is "free". Also no more than 1/2 of the $3.5 million would be from RGH
Sorry, poor choice of words. What I meant is that construction costs would be basically covered.
     
     
  #2774  
Old Posted Nov 30, 2011, 3:12 PM
skthunder77's Avatar
skthunder77 skthunder77 is offline
Registered User
 
Join Date: May 2010
Posts: 113
Funny thing...

One of the recurring arguments I have often heard when talking about the proposed mulit-purpose facility/stadium is that there are other pressing needs...like a parkade at RGH...and this one came up multiple times...and it's funny how the province is knocking these things down one by one as the city proceeds with the planning on the MPF.

- Surgical Wait times
- large investment in road repair
- Children's Hospital
- Hospital Parking

I'm not sure if I am cynical enough to believe they are only dealing with these issues to be able to justify (a little better) putting $$$ into a stadium but the thought has obviously crossed my mind.

Sorry, not on topic but I found it interesting.

Hope to see work start on Capital Pointe today!!!!
     
     
  #2775  
Old Posted Nov 30, 2011, 3:47 PM
UPP UPP is offline
Registered User
 
Join Date: Jan 2011
Location: Regina, Canada
Posts: 590
Quote:
Originally Posted by Golks View Post
It looks like it will be a full reconstruction with new concrete bridges replacing the wood ones over Pilot Butte Creek along with intersection realignments and traffic signal upgrades. Utilities and drainage will most likely have to be updated/upgraded as well.

It is at least 1200 meters of roadway x 6 lanes plus turning bays and merging lanes. Everything considered it is a huge project.
Arghhhh! I thought, as an eastender, we'd get 1 construction season without major construction totally bottlenecking the Eastend. Hopefully this doesn't affect my commute too much.
     
     
  #2776  
Old Posted Nov 30, 2011, 4:02 PM
StealthGirl's Avatar
StealthGirl StealthGirl is offline
Registered User
 
Join Date: Jun 2008
Posts: 1,272
If the proposed road construction does get all approval, the Vic Ave work will make Arcola crazy busy again.

Quote:
In addition to the three projects, the city is also budgeting $100,000 for a study about widening a three-kilometre stretch on Ring Road between Albert Street and McDonald Street.

Read more: http://www.leaderpost.com/roadwork+planned+Regina/5785932/story.html#ixzz1fCmFQlQT
I can't even imagine what a mess it would be to widen that stretch of road.
     
     
  #2777  
Old Posted Nov 30, 2011, 4:07 PM
CCF's Avatar
CCF CCF is offline
Canadian Urbanite
 
Join Date: Jul 2006
Location: Across Canada
Posts: 3,530
Quote:
Originally Posted by Chaps View Post
Was this building "in before the plan" or will there be ground floor retail?
Its design meets the plan, however, for that area of downtown retail is not required at grade (as per the plan). The plan recognizes that the conditions for successful aren't uniform across the entire downtown - at this location it might be a bit of a struggle to have successful retail at this time.

That being said, it will still be designed to a high standard with plenty of entrances and transparent windows. Even though the main floor will be an office component it will still be engaging to the pedestrian. Although office uses aren't necessarily exciting they can still be active - think of a bank where there are tonnes of people going in and out.

That being said, this building is being designed to be flexible so that if the market changes for that area of the downtown, retail can easily be incorporated with some minor changes to the building. That's the way to design buildings nowadays as their uses are constantly changing.
     
     
  #2778  
Old Posted Nov 30, 2011, 8:05 PM
cutterp's Avatar
cutterp cutterp is offline
#1 King Champ
 
Join Date: Oct 2007
Location: Regina
Posts: 261
Quote:
Originally Posted by Dougler306 View Post
Excellent, I can also use that map to find the Americans Intercontinental Ballistic Missile Launch Facilities.

__________________
Paul
Regina, Sk
     
     
  #2779  
Old Posted Nov 30, 2011, 8:40 PM
osmo osmo is offline
Registered User
 
Join Date: Nov 2005
Posts: 1,717
Quote:
Originally Posted by Stormer View Post
There is no way a 30 million parking garage will pay for itself. If it would, they could just have the private sector build it. You are forgetting the considerable operating costs of a parkade including 24/365 staffing, security, lighting, power, cleaning, repairs, depreciation, interest, etc. I am not sure if they would have pay grants in lieu of taxes to the City as a commercial part of the hopsital (this would be true for the Robins Donuts, for example). I suppose the land is "free". Also no more than 1/2 of the $3.5 million would be from RGH

This is true but if they are planning to basically have it as a central parkade for all facilities I imagine from staff alone it would generate some change. Do staff currently get free parking in the limited spots? And plus if they build it big enough you can charge up the a** for regular workers in the Downtown to use it also .
     
     
  #2780  
Old Posted Nov 30, 2011, 10:21 PM
BrannyMuffin BrannyMuffin is offline
Registered User
 
Join Date: Aug 2006
Location: Regina
Posts: 970
Quote:
Originally Posted by osmo View Post
This is true but if they are planning to basically have it as a central parkade for all facilities I imagine from staff alone it would generate some change. Do staff currently get free parking in the limited spots? And plus if they build it big enough you can charge up the a** for regular workers in the Downtown to use it also .
There is no free staff parking at RGH, Pasqua, or Wascana. In the article it says that wait times for staff parking at RGH can be up to 5 years but I know people who have been waiting longer than that and are still pretty far down on the list.

The only free on site parking that I know of at all is visitor parking at Wascana and that's quite limited.

I'm curious as to where the parking revenue goes. Even if RGH generates $1million/year it doesn't cost that much to maintain those surface lots and pay the attendants. There's one attendant for 15 or 16 hours a day (the 15th Ave lot is pay and display). I'm not sure how much they make but they can't be paying much more than $100,000 in wages for the year. Basically it's lighting and snow removal. Then there's the maintenance issues that come up every so often - repaving/holes, they repainted the lines last summer, things like that but things like that don't happen very often.

I know that the visitor parking in the main lot at RGH used to be so much an hour up to the daily max of $10 until the attendant left (10 or 1030 pm I believe) and then it was just $3 in the machine to get out. They were switching to a machine similar to those at the airport and Cornwall where you put your ticket in and it charges based on how long you've been there (still up to $10/day) except that you just paid as you left instead of inside. While they were in the midst of changing that there was an attendant there I believe until midnight. That lasted a little while and then stopped and for at least the past year the gates are just left open once the attendant leaves. I kinda think they were having issues with the machines (especially in the cold) and just gave up on them...It was actually when they were in the middle of making these changes that I started to wonder what they did with the money.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 8:45 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.