The 70th floor is 853' + 4' for the column splices. This jump is for floors 70-72. It is the 26th jump of 26'8'' or 696'8'' to date of office floors on the 187' base. Total = 883'8''
*The following information was last updated on June 24, 2011.
Facade installation is now above floor 38
Tower steel is now above floor 70
Concrete is now being installed
Spray-on fireproofing underway
Elevator shaft fit-out
Multiple cranes on site for steel and concrete installation
Both the south and north cores are now being erected as the structure rises
"Cocoon" safety system now in place around upper perimeter, to rise with structure
Utility installation and tie-ins
Crews are coordinating substructure construction while maintaining PATH service
just realised- as the floors get smaller as they go up, doesn't that mean each floor takes less time to put in?
yes, but in reality there not much less structural steel being used on the floors higher up. Also consider that the higher the tower goes the longer it takes to hoist materials to the top by crane. So really its not taking significantly less time to build these new floors.
awesome night pic ^^^^
i never noticed that the edges/corners weren't illuminated at night, does anyone know if there will be lighting here to give the impression of light coming out at the corners?
awesome night pic ^^^^
i never noticed that the edges/corners weren't illuminated at night, does anyone know if there will be lighting here to give the impression of light coming out at the corners?
If so, maybe it can be done with some kind of floodlighting...?
@Roadcruiser: Maybe not if the lighting source is controlled somehow.