New Vancouver airport runway rules could cost millions
YVR airport faces years of construction under proposed federal policy
By Matthew Robinson and Ian MacLeod, Vancouver Sun May 12, 2011 9:06 PM
Transport Canada is drafting regulations that could cost Vancouver International Airport tens of millions of dollars and commit the airport authority to years of construction.
Postmedia News has learned that the policy, if approved, would require major Canadian airports to meet minimum international standards for emergency stopping distances. YVR does not now meet those standards and would be forced to expand existing runway strips.
“Even a simple runway extension takes a great deal of planning and years of construction activity,” Brett Patterson, YVR’s director of airside operations, told The Vancouver Sun last summer following federal discussion of a rule change.
Major runways at Canada’s airports require a graded, unobstructed buffer zone or “runway strip” extending 60 metres past the runway’s end for last-ditch emergency stopping.
In response to a 2005 Air France crash at Toronto’s Pearson International Airport, where an airliner barrelled off a rain-slick runway and caught fire, a senior Transport Canada official says the department wants to increase that requirement to at least 150 metres of emergency stopping space.
The proposed move follows a warning last year from the Transportation Safety Board that runway “excursions” and other landing safety issues pose one of the country’s greatest transportation risks and need urgent government and industry action.
The rate of overruns per million landings by large transport aircraft in Canada is almost twice the world average, and three times that of the United States. The figure jumps to four times the global average when the runway is wet.
...
Read more:
http://www.vancouversun.com/Vancouver+ai...illions/4775635/story.html#ixzz1MCo9Rxh6