Quote:
Originally Posted by MrOunce View Post
Great pictures. The amount of work and feeling of progress has felt that it has increased significantly in the past 2-3 weeks. The big yellow thing is now a few pillars from completion and the sight of it coming down bow trail is wonderful.

Now that 33rd Street is open, the traffic congestion in that area has decreased slightly. With every give there is a take and 26th street is closed on the south side with some underground work occurring (unsure of timeline for completion).
Thanks. 17th Ave & 33rd St is still an annoyance though. The traffic signal timing gives 17th a long green phase.
__________________
Stevinder.
* * * * * *
Reply With Quote
     
     
  #1522  
Old Posted Apr 21, 2011, 2:36 PM
bigcanuck bigcanuck is offline
Registered User
 
Join Date: Jun 2005
Posts: 1,278
The first cross-beam for the overhead canopy is going up at the Shaganappi station location this morning. Hopefully we'll see an up-close view of the covering within the next few weeks (rather than the distant view we currently see at Sunalta).
Reply With Quote
     
     
  #1523  
Old Posted Apr 21, 2011, 4:51 PM
kw5150's Avatar
kw5150 kw5150 is offline
Here and There
 
Join Date: Nov 2009
Location: Calgary
Posts: 5,807
This project just keeps getting better and better. I dont reccomend driving along 17th ave Sw or bow trail right now though......very rough pavement and REALLY bad signage with basically no warnings about strut-destroying bumps......
__________________
Renfrew, Calgary, Alberta.
Reply With Quote
     
     
  #1524  
Old Posted Apr 22, 2011, 5:18 AM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
The launching truss is nearing the final span now, looked like only 2 or 3 more segments in the second last span left to be lifted when I went past earlier this evening. I'm thinking we'll probably see the truss starting to be dismantled within a month (I say this long as the abutment the guideway lands on isn't built fully yet, so they may have to slow down lifting the last span until its ready.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
Reply With Quote
     
     
  #1525  
Old Posted Apr 28, 2011, 7:10 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
There's a new newsletter on the West LRT website. It mainly goes over what the major construction milestones will be for the rest of 2011, some of which will require more road closures, mostly at the at-grade crossings. The construction delays will mostly be finished by the end of the year though, with the remainder of the project construction taking place within the right of way, at stations, and then testing and commissioning.

Here's a map from the newsletter which shows the major work that will be occurring.



http://www.westlrt.ca/files/West%20LRT%20Newsletter%20Spring%202011.pdf
Reply With Quote
     
     
  #1526  
Old Posted Apr 28, 2011, 7:16 PM
Innersoul1's Avatar
Innersoul1 Innersoul1 is offline
City of Blinding Lights
 
Join Date: Feb 2007
Location: Calgary
Posts: 3,676
They were actually working on the tracks at the 26th ave and Bow Trail intersection late last week and over the weekend. It's pretty net to see track going in so early.
__________________
Sweet dreams are made of cheese. Who am I to diss a brie?
Reply With Quote
     
     
  #1527  
Old Posted Apr 28, 2011, 7:32 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
I don't want to speak too soon, but I think this thing is going to open early. Certainly not late.

The stations are substantially complete, and there's a lot of rail already installed. I'd think most of the rail will be installed by the end of summer. The electrical equipment is installed in most of the substations, or will be soon. The only thing that I'm unsure of the timeline for is the catenary and signal systems. If that starts up soon, I can't see it taking all the way to mid 2012 for handover to CT for the (up to) 6 months they need for testing, commissioning, and training.
Reply With Quote
     
     
  #1528  
Old Posted Apr 28, 2011, 7:42 PM
Innersoul1's Avatar
Innersoul1 Innersoul1 is offline
City of Blinding Lights
 
Join Date: Feb 2007
Location: Calgary
Posts: 3,676
Quote:
Originally Posted by frinkprof View Post
I don't want to speak too soon, but I think this thing is going to open early. Certainly not late.

The stations are substantially complete, and there's a lot of rail already installed. I'd think most of the rail will be installed by the end of summer. The electrical equipment is installed in most of the substations, or will be soon. The only thing that I'm unsure of the timeline for is the catenary and signal systems. If that starts up soon, I can't see it taking all the way to mid 2012 for handover to CT for the (up to) 6 months they need for testing, commissioning, and training.
Well as we saw with the NW extension from Dalhousie to Crowfoot the caternary and signals took FOREVER to be completed
__________________
Sweet dreams are made of cheese. Who am I to diss a brie?
Reply With Quote
     
     
  #1529  
Old Posted Apr 29, 2011, 2:30 PM
MichaelS's Avatar
MichaelS MichaelS is offline
Registered User
 
Join Date: Jan 2006
Location: Calgary
Posts: 2,402
Is there a "bonus" paid for finishing early? Also, will the City have delivery of enough LRVs to operate the line if it does open early?
Reply With Quote
     
     
  #1530  
Old Posted Apr 29, 2011, 2:47 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Quote:
Originally Posted by MichaelS View Post
Is there a "bonus" paid for finishing early? Also, will the City have delivery of enough LRVs to operate the line if it does open early?
I don't think there would be a bonus, as I think the contract is a fixed figure. What SNC-Lavalin would stand to gain though is a good name going forward on future bids, especially with the City of Calgary. Say, for the SE line.

All the LRVs will be in well before the line is in operation, even if it were to open 6 months early. They are sitting at about a third of the order already in, and many of the units are in operation already.
Reply With Quote
     
     
  #1531  
Old Posted Apr 29, 2011, 3:57 PM
kw5150's Avatar
kw5150 kw5150 is offline
Here and There
 
Join Date: Nov 2009
Location: Calgary
Posts: 5,807
You get bonuses for some PWGSC (public works government services Canada) projects if you finish early.
__________________
Renfrew, Calgary, Alberta.
Reply With Quote
     
     
  #1532  
Old Posted Apr 29, 2011, 4:01 PM
Ramsayfarian's Avatar
Ramsayfarian Ramsayfarian is offline
Registered User
 
Join Date: Dec 2007
Posts: 5,271
Quote:
Originally Posted by MichaelS View Post
Is there a "bonus" paid for finishing early? Also, will the City have delivery of enough LRVs to operate the line if it does open early?
Wouldn't the bonus be the money saved on salaries?
Reply With Quote
     
     
  #1533  
Old Posted Apr 29, 2011, 5:28 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by Ramsayfarian View Post
Wouldn't the bonus be the money saved on salaries?
And extra time to have a beer?
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
Reply With Quote
     
     
  #1534  
Old Posted Apr 29, 2011, 6:04 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Quote:
Originally Posted by fusili View Post
And extra time to have a beer?
Speaking of which, when are all these new beer places opening up (I know I know, wrong thread)
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
Reply With Quote
     
     
  #1535  
Old Posted Apr 29, 2011, 6:08 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Wrong Thread

Last edited by You Need A Thneed; Apr 29, 2011 at 7:48 PM.
Reply With Quote
     
     
  #1536  
Old Posted Apr 30, 2011, 1:10 AM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
last segments of the guideway have been installed, so we'll see the launching truss coming apart pretty soon I bet.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
Reply With Quote
     
     
  #1537  
Old Posted May 3, 2011, 6:26 PM
Surrealplaces's Avatar
Surrealplaces Surrealplaces is offline
Editor
 
Join Date: Feb 2006
Location: Cowtropolis
Posts: 20,268
Reply With Quote
     
     
  #1538  
Old Posted May 4, 2011, 5:40 AM
defaultuser's Avatar
defaultuser defaultuser is offline
Registered User
 
Join Date: Mar 2008
Posts: 572
04-27-11







Reply With Quote
     
     
  #1539  
Old Posted May 5, 2011, 1:13 PM
Bigtime's Avatar
Bigtime Bigtime is offline
Very tall. Such Scrape.
 
Join Date: Jun 2005
Posts: 17,727
Quote:
Originally Posted by mersar View Post
last segments of the guideway have been installed, so we'll see the launching truss coming apart pretty soon I bet.
John Mar just tweeted this:

Quote:
We're saying goodbye to the giant yellow truss launcher today. #WLRT #yyc #yyccc
Reply With Quote
     
     
  #1540  
Old Posted May 6, 2011, 5:02 AM
PPAR's Avatar
PPAR PPAR is offline
Registered User
 
Join Date: Jul 2006
Posts: 604
Quote:
Originally Posted by frinkprof View Post
I don't want to speak too soon, but I think this thing is going to open early. Certainly not late.

The stations are substantially complete, and there's a lot of rail already installed. I'd think most of the rail will be installed by the end of summer. The electrical equipment is installed in most of the substations, or will be soon. The only thing that I'm unsure of the timeline for is the catenary and signal systems. If that starts up soon, I can't see it taking all the way to mid 2012 for handover to CT for the (up to) 6 months they need for testing, commissioning, and training.
SNC Lavalin had the good fortune to tender the WLRT when absolutely no one else in Canada was starting anything. I think we are seeing the benefits of that now with the rapid work getting done by all the subs.

It is becoming clear from the photos that this really is going to be a signature public works project for Calgary. Put it together with a Gondola thru the University to Foothills Hospital and we will really have hit our groove!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:09 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.