Quote:
Originally Posted by aberdeen5698
Phase I - Expo line to New Westminster (1986)
Phase II - Extended to Scott Road (1990)
Phase III - Extended to King George (1994)
That was a non-starter because the largest ridership for the Canada Line was always YVR and South of Fraser.
|
The thing is that those phases are in logical places. Distinct phases don't sense on something like the Broadway line which is reasonably short, and will likely only contain one type of construction.
To mobilize and demobilize a tunnel boring machine is a massive endeavor, hence why many of them get left in the ground after a large job. If we want to phase construction on this job Translink may as well buy all the construction equipment because a large portion of the big ticket items will be left underground mothballed until the next phase of construction commences.
Once the TBM is in the ground you've basically committed to a full line since the unit cost will take such a dive after the few few km of tunnel are built that it will make sense to continue construction. The flipside of this is that the stub line is far less attractive when you look at the cost benefit ratio.
If we want to make this attractive we should just plan to do construction starting at VCC with 1 section under construction at any given time. Funding could be put into place as construction continues 1 station section at a time; with the expectation that the entire line will be built slowly. The tunnel can be furnished one section at a time allowing for the use advantages of early utilization and development of political capital, while some of the expenses can be put off to a later date and written down in cost.
This should also make it easier for the constructor to turn in a lower bid since they would have to have a stable amount of equipment on site, stable workforce and consistent cash flows.