HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Jan 1, 2011, 6:45 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by sim View Post
Why wouldn't the train that pulls in, and after unloading passengers go further past the station, switch there and then line up to load passengers again, allowing any other incoming train to also unload? Seems like a pretty easy solution to me for peak hour service to avoid that wait. Maybe I'm overlooking something?
Just a matter of system design. The Skytrain in Vancouver operates like this at King George station I believe, though having the trains automated it does change things slightly. Though I'm not so sure that it would actually speed thins up in reality, though it may seem faster (what it would do is force everyone to board all at once, rather then staggered over the 3-10 minutes the train is waiting at the terminal station)
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:59 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.