Quote:
Originally Posted by reflexzero
Well considering they left 64th and Metis in construction zone limbo for two years, I don't imagine there will be much progress over the winter months. I mean, I'll be happy to stand corrected, but I doubt the project is high on the priority list. Case in point, I'd sure like to be able to get onto Stoney Trail via Metis north of 80th Ave, or perhaps even get on via the non-existant 96th ave.. but instead I have to drive through 3 playground zones and up that goat trail to CHB.
Not that I'm complaining. 
|
Progress will certainly be slow as soon as it turns colder. There is work to be done that either is impossible to do with frozen ground/cold weather, or becomes significantly more costly. Anything that requires compacted soil is impossible to do with frozen ground. An extended warm spell in fall and an early spring could be what the project needs to get significnatly ahead of schedule.
Metis was tendered this summer, and the city was hoping to at least get something doen by the end of November (writing into the contract a bonus to the contractor if it was completed by then), but it think expropriation was an issue, as there were 4 properties required for the project that were given notices in the paper just last week or the week before.
The city also tendered a project that would have connected 60th Street to the unused 96th Ave interchange on Stoney, but I don't know what happened with that one either. I haven't seen any construction started on that one either. That one would have closed 68th Street for good.
I, for one, am looking forward to the day when 96th Ave (airport Trail) connects all the way from Harvest Hills Blvd to Stoney Trail on the east side. What a valuable piece of road that is going to be. You can draw a
13 km long line around the portion of the NE east of the airport and north of McKnight, that currently has only two cow paths that cross the line to get out to the North, East or West. It's time for that to change.