HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #7421  
Old Posted Oct 16, 2010, 2:32 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,053
Quote:
Originally Posted by CLC View Post
i believe this final design is already a compromise (still have some transverse seatings). If I remember correct, the media once reported that the new TTC subway car is going to have side seatings only.
the piccadily line has side seats only - which isn't so bad


moblog.net
__________________
belowitall
     
     
  #7422  
Old Posted Oct 16, 2010, 3:38 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by aberdeen5698 View Post
The mobility issue is especially important on Skytrain because the cars are much narrower and with double forward-facing seats on each side of the aisle there's zero room to get past a standee.
Even on the Canada Line trains, mobility is a huge issue - and why? Row seating!!!

I cannot emphasize enough how many more people could be comfortably boarded into each train if InTransitBC had used side seating, or at least a lot more of it. HOWEVER, within that standing space there also needs to be sufficient bars and handles to hold onto otherwise people will be reluctant to stand there, thus you're wasting space just like with row seating.
     
     
  #7423  
Old Posted Oct 16, 2010, 4:09 AM
Vonny Vonny is offline
Registered User
 
Join Date: Sep 2009
Posts: 155
Quote:
Originally Posted by mr.x View Post
Note to InTransitBC: THIS IS HOW YOU DESIGN A TRAIN INTERIOR.


http://toronto.ctv.ca/servlet/an/local/C...bway-101015/20101015/?hub=TorontoNewHome

Side seating? Check.
Appropriate bars and handles to hold onto for standing space? Check.
Even the non-shiny but dulled bars look nicer, no fingerprints! Check!

The only thing I don't like is the blood red seat colour, it makes the train look retro already in a way...but I guess it is the TTC's colour.
it is well designed for efficient cleaning (see how all the floor is free of obstacle or corner and can be sweep in one shot)...but how about pole dancing with such prude design?

Video Link
(that is thanks to zwei)
     
     
  #7424  
Old Posted Oct 16, 2010, 4:29 AM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
Apparently a vehicle levy is on the table now as well (as opposed to a property tax increase).

"Property tax is not a preferred way to pay for transportation," said TransLink spokesperson Ken Hardie, who said the transportation authority's board drew that conclusion after hearing from the TransLink mayors' council this week.

http://www.bclocalnews.com/greater_vancouver/newwestminsternewsleader/news/105063819.html

Translink's funding options website: http://www.translink.ca/en/Be-Part-of-th...onsultations/2011-Supplemental-Plan.aspx

And diesel buses are getting cameras:

http://www.news1130.com/news/local/artic...ras-to-be-installed-on-hundreds-of-buses
     
     
  #7425  
Old Posted Oct 16, 2010, 4:31 AM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
Doesn't appear that Translink is too concerned about a lack of financing. Don't know what the Liberals have in store but it's something. The following was included in an RFP released today, note the wording or "when" approved, not if approved. Seems like an interesting choice of wording.

Quote:
The Supplier List is expected to be in place for a period of approximately three (3) years beginning November 2010 and ending November 2013. TransLink, in its discretion, may extend the period during which the Supplier List is valid.

2.0 BACKGROUND

2.1 The Real Estate Division of TransLink has a mandate to increase revenue, reduce capital costs and increase ridership by promoting real estate development at or near transit facilities and by improving the value of existing land holdings. The Division captures additional real estate value as a way to minimize the cash outlays from the public purse. Facilitating urban density will help move jobs and additional tax base to local communities as well as encourage people to drive less and use the transit system more with a resulting decrease in greenhouse gas emissions.

2.2 There are three new transit corridors under study and several new rapid bus associated developments that will require property acquisitions, when approved. The Real Estate Division will be working to increase densification along the corridors and at the stations. This will involve accelerated real state programs and major acquisition work.
Source
http://www.translink.ca/~/media/document...20opportunities/q0%200054/q00054rfq.ashx
     
     
  #7426  
Old Posted Oct 16, 2010, 5:24 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,053
more pole dancing...

Video Link
__________________
belowitall
     
     
  #7427  
Old Posted Oct 16, 2010, 6:37 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
It was interesting to look over the closed bids... some of it's just routine, but when did BC Hydro have a False Creek Transit Centre? =S There are not many pics of that place anymore...
     
     
  #7428  
Old Posted Oct 16, 2010, 2:19 PM
Gordon Gordon is offline
Registered User
 
Join Date: Jul 2008
Posts: 1,065
I always thought $400M was Translinks portion of the Evergreen line's cost and the they were around $170m short.

The Vehicle Levy is a good idea but they will need a payment mechanism that doesn't cost them too much money and one that compels people to pay.
     
     
  #7429  
Old Posted Oct 16, 2010, 4:09 PM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
Adding it on to car insurance would be the easiest way IMO. Just have to convince ICBC to do it..

(woo, post #1000 for me )
     
     
  #7430  
Old Posted Oct 16, 2010, 10:17 PM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by jlousa View Post
Doesn't appear that Translink is too concerned about a lack of financing. Don't know what the Liberals have in store but it's something. The following was included in an RFP released today, note the wording or "when" approved, not if approved. Seems like an interesting choice of wording.



Source
http://www.translink.ca/~/media/document...20opportunities/q0%200054/q00054rfq.ashx

Because at the end of the day. It is a question of when and not if.

Things will get done. It might not be by tomorrow and it might not be for the next 10 years or longer. But there is always enough time to get things done. Which is why I'm not worried about the funding. At some point the money will be there.

Sure it would be nice to see the 3 extensions started by tomorrow. But that is never going to happen. But that doesn't mean that they will never be built .
     
     
  #7431  
Old Posted Oct 17, 2010, 6:37 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by SpongeG View Post
the piccadily line has side seats only - which isn't so bad


moblog.net
Padded cushioned Seats?
Arm Rests?
Enough overhead room for my bowler hat?

How Civilized!

Does this have something to do with the sports event they're having in 2012?
Or perhaps the Royal Wedding the same summer ?
Or maybe the celebration of the Queens 60th anniversary all year?
     
     
  #7432  
Old Posted Oct 17, 2010, 6:50 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by mr.x View Post
Note to InTransitBC: THIS IS HOW YOU DESIGN A TRAIN INTERIOR.


http://toronto.ctv.ca/servlet/an/local/C...bway-101015/20101015/?hub=TorontoNewHome

Side seating? Check.
Appropriate bars and handles to hold onto for standing space? Check.
Even the non-shiny but dulled bars look nicer, no fingerprints! Check!

The only thing I don't like is the blood red seat colour, it makes the train look retro already in a way...but I guess it is the TTC's colour.
It's surprising to me that it has taken so long to build trains that are open between all the cars. We have a pass-through between the Canada Line cars, and between pairs of MK II cars, but this is the first time I've seen an entire train be accessible from stem to stern.
     
     
  #7433  
Old Posted Oct 17, 2010, 7:08 AM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by jsbertram View Post
It's surprising to me that it has taken so long to build trains that are open between all the cars. We have a pass-through between the Canada Line cars, and between pairs of MK II cars, but this is the first time I've seen an entire train be accessible from stem to stern.
They could do that with the MKII cars with the addition of the C-cars. With the current setup if one set of MK II cars is having mechanical problems. They can disconnect it from the other set. So it gives them more options without the C-Car.
     
     
  #7434  
Old Posted Oct 17, 2010, 2:34 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by cabotp View Post
They could do that with the MKII cars with the addition of the C-cars. With the current setup if one set of MK II cars is having mechanical problems. They can disconnect it from the other set. So it gives them more options without the C-Car.
it will be interesting to see how often these trains are out of service.
If one car has a serious problem, the entire 6-car train set is unusable.
I agree that with the mated pairs used by Skytrain, if one car has a serious problem, only it and its mate are out of service and can be cut out of a 4-car or 6-car train set & be replaced with another working set of cars.
     
     
  #7435  
Old Posted Oct 18, 2010, 7:17 AM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by jsbertram View Post
it will be interesting to see how often these trains are out of service.
If one car has a serious problem, the entire 6-car train set is unusable.
I agree that with the mated pairs used by Skytrain, if one car has a serious problem, only it and its mate are out of service and can be cut out of a 4-car or 6-car train set & be replaced with another working set of cars.
Well like anything the older something is the longer it will be out of service at times. I'm sure when they are new they come in for a quick service. With only minor repairs. But as they get older those repairs start to become more major and thus require more time to fix.

Though it also depends on how many spares they have.
     
     
  #7436  
Old Posted Oct 18, 2010, 10:53 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,053
Quote:
Originally Posted by jsbertram View Post
Padded cushioned Seats?
Arm Rests?
Enough overhead room for my bowler hat?

How Civilized!

Does this have something to do with the sports event they're having in 2012?
Or perhaps the Royal Wedding the same summer ?
Or maybe the celebration of the Queens 60th anniversary all year?
its always been like that as many times as I have used it - well not all had the armrests but i remember the armrests - this is the line that also goes to the heathrow airport and it can be quite crowded with luggage


flickr http://www.flickr.com/photos/bods/

the pics empty make it look spacious but its not i find the roof very low and the doors are designed so you don't have to duck to get in


img.dailymail.co.uk
__________________
belowitall
     
     
  #7437  
Old Posted Oct 18, 2010, 3:30 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
The Tube is crowded because all the tunnels are quite small diameter and circular. This means that near the doors, the train body has to be curved. If you're average height, the door can trap your hair or hat.

It means that it was cheaper to build ( smaller diameter tunnels ) but it also means that trains have much less clearance:

     
     
  #7438  
Old Posted Oct 18, 2010, 5:07 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
^ The size of the tunnel is a legacy of the network's age. This is why tube trains are so long - the cars hold far less than even MK I cars. Not a place for those with claustrophobia.
     
     
  #7439  
Old Posted Oct 18, 2010, 5:10 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is online now
Registered User
 
Join Date: May 2010
Posts: 4,788
Quote:
Originally Posted by cabotp View Post
Though it also depends on how many spares they have.
The problem is that the entire train considered as a unit is less reliable than individual cars or car pairs, and to compensate for the poorer reliability you need to have a higher percentage of spares. So the net effect is a higher capital investment required for the fleet.

The big question is whether the percentage increase in capacity is as large as the percentage increase in fleet cost.

Another downside is that if you size the trains for peak loads then it may be uneconomical to run them at decent frequencies off-peak.
     
     
  #7440  
Old Posted Oct 18, 2010, 7:01 PM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by twoNeurons View Post
The Tube is crowded because all the tunnels are quite small diameter and circular. This means that near the doors, the train body has to be curved. If you're average height, the door can trap your hair or hat.

It means that it was cheaper to build ( smaller diameter tunnels ) but it also means that trains have much less clearance:

Back when they did build the underground. The average height of people was shorter than today. So while it did save them money, they also didn't have a real reason to built taller tunnels
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:36 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.