Quote:
Originally Posted by renthefinn
Did any of the piles ever reach bedrock? Based on my local knowledge and information, I find that highly unlikely. AFAIK none of the PM bridge pilings are on bedrock, neither are the recently build Golden Ears Bridge foundations.
|
Quote:
Originally Posted by officedweller
Yeah, I think I read somewhere that the bedrock is wayyy too far down below the silt - so they used pilings that splay out to form a stabilizing pattern. They did that for the Canada Line columns in Richmond.
|
You guys may well be right and I may have mis-spoken. I was always under the impression that the piles hit bedrock but, if not, then the technical aspects are a bit over my head.
Regarding the Port Mann Bridge, I do know that many of the piles were not sunk deep enough, which caused some sinkage in the structure.
Regarding the GEB, a specialized team of 18 crane cable drivers, engineers, etc. were brought over from Germany specifically for the pile boring/foundation work. As a matter of fact, one of these individuals either posted on here or on another site about that work and was from Düsseldorf, Germany. I recall him stating that their specialized team moves world-wide for their foundation work.
The reason that the crossing at the George Massey Tunnel was built as submerged tunnel tubes during the late 1950's was that the silts were too soft and deep for bridge piers. Makes one wonder how they dealt with the foundation work for the Pattullo Bridge during the 1930's.