Quote:
Originally Posted by Mac Write
ˆˆˆ Speak for yourself I will be around.
How many trains would be required to maintain 90s headway+3m headway on the ends, and what would be the cost for trains for that? Then once that's done then go to 3-car?
|
35 trains for 90s/3m headway... but that would be over the design spec of the system, which is 2m/4m.
3.75m/7.5m = 16x 2-cars trains per hour @ 334 per train = 5344 pphpd (current)
3.16m/6.33m = 19x 2-cars trains per hour @ 334 per train = 6346 pphpd (next year)
2m/4m = 30x 2-cars trains per hour @ 334 per train = 10000 pphpd (max capacity with 40m platform)
90s/3m = 40x 2-cars trains per hour @ 334 per train = 13360 pphpd (this is the same as the capacity on the expo line right now)
2m/4m = 30x 3-cars trains per hour @ 500 per train = 15000 pphpd (max capacity with 50m platform)
90s/3m = 40x 3-cars trains per hour @ 500 per train = 20000 pphpd (maybe doable during special events?)